Loading...
HomeMy WebLinkAboutResolution 04-25RECORD OF RESOLUTIONS BARRETT BROTHERS - DAYTON, OHIO Form 6301 Resolution No._94-25 Passed , AUTHORIZING THE CITY MANAGER TO ENTER INTO A COST SHARING AGREEMENT WITH THE DUBLIN CITY SCHOOL DISTRICT FOR THE HYLAND-CROY ROAD AND CACCHIO LANE TRAFFIC SIGNAL PROJECT (24-033-CIP) WHEREAS, the City of Dublin (the “City”) and the Dublin City School District (the “DCSD”) have worked cooperatively to support DCSD’s Elementary XV school being constructed at 6855 Cacchio Lane; and WHEREAS, a traffic impact study performed as part of the design and development of Elementary XV identified the need for a traffic signal at the intersection of Hyland- Croy Road and Cacchio Lane; and WHEREAS, the City has coordinated with DCSD for the installation of a traffic signal at the intersection of Hyland-Croy Road and Cacchio Lane as part of the Hyland-Croy and Cacchio Lane Traffic Signal Project (the “Project”); and WHEREAS, the City and DCSD have agreed to share equally in the cost for the design and construction of the Project following the terms and conditions set forth in a Cost Sharing Agreement between the parties for the Project; and WHEREAS, the City hereby agrees to continue coordination with DCSD during construction of Elementary XV and the Project . NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, State of Ohio, __‘/ _ of the elected members concurring that: Section 1. The City Manager is hereby authorized to execute the attached Cost Sharing Agreement with the Dublin City School District for the purpose of constructing a traffic signal and other necessary improvements at the intersection of Hyland-Croy Road and Cacchio Lane. Section 2. This Council further hereby authorizes and directs the City Manager, the Director of Law, the Director of Finance, the Clerk of Council, or other appropriate officers of the City to prepare and sign all other agreements and instruments and to take any other actions as may be necessary to implement this Resolution and complete the work for this Project. Section 3. This Resolution shall take effect upon passage in accordance with Section 4.04(a) of the Revised Dublin Charter. Passed this 13 day of January, 2025. [LA Za ~ Mayor - Presiding Officer ATTEST: Crag (/ To: Members of Dublin City Council From: Megan D. O’Callaghan, P.E., City Manager Date: January 7, 2025 Initiated By: Paul A. Hammersmith, P.E., Director of Engineering/City Engineer Brian D. Gable, P.E., Director – Capital Projects Joshua D. Miller, P.E., Civil Engineer II Re: Resolution 04-25 – Authorizing the City Manager to enter into a Cost Sharing Agreement with the Dublin City School District for the Hyland-Croy Road and Cacchio Lane Traffic Signal Project (24-033-CIP) Background The City of Dublin (City) and the Dublin City School District (DCSD) have worked cooperatively to support the DCSD’s Elementary XV school being constructed at 6855 Cacchio Lane which includes the building, private site improvements and public improvements to include a westbound left-turn lane on Cacchio Lane and a traffic signal (signal) at the Hyland-Croy Road/Cacchio Lane intersection. A traffic impact study (TIS) was performed on behalf of DCSD as part of the design and development of Elementary XV and identified the need for the construction of a traffic signal at the intersection of Hyland-Croy Road and Cacchio Lane. The proposed signal (Project) will be owned, operated, and maintained by the City, and will include 3 signal poles with mast arms, video detection, touchless pedestrian crossing buttons, a new signal controller, and other associated infrastructure. As a result of coordination and in consideration of time, DCSD and the City are working cooperatively on the installation of the signal. The City has lead the signal design and creation of the associated construction plans at a cost of $61,300. The design is complete with the installation advertised for bids in December 2024. The bid opening is to be on January 22, 2025. The City will award the construction contract for the Project per the City’s statutory process to the lowest and best bidder. Once awarded, the City will manage the construction. Presently, the construction costs are estimated to be $540,000. Construction will occur in 2025 with a goal of having the traffic signal operational before the start of school in August 2025, if possible. Lead times for several key components of the signal may dictate when the final installation and activation of the signal can occur. Staff has specified in the construction plans that all underground construction associated with the signal installation must be complete prior to the opening of the school. Any remaining work will be completed once all components have arrived. The City and DCSD have drafted a Cost Sharing Agreement (as attached) wherein each party is responsible for 50% of the design costs and 50% of the construction costs, resulting in a reimbursement from the DCSD to the City in an estimated amount of $300,650. At the conclusion of the signal installation (Project), the City will determine the actual cost of the Project and DCSD’s share of the actual Project costs. DCSD staff have reviewed and approved the proposed Cost Sharing Agreement. Office of the City Manager 5555 Perimeter Drive • Dublin, OH 43017 Phone: 614.410.4400 Memo Resolution 04-25 – Authorizing the City Manager to enter into a Cost Sharing Agreement with the Dublin City School District for the Hyland-Croy Road and Cacchio Lane Traffic Signal Project (24-033-CIP) January 7, 2025 Page 2 of 2 For reference, the Project’s estimated cost breakdown is as follows: Total Project Estimated Costs City Estimated Costs DCSD Estimated Costs Design Cost ($61,300.00) $30,650 (50%) $30,650 (50%) Construction Cost ($540,000.00) $270,000 (50%) $270,000 (50%) $601,300.00 $300,650.00 (50%) $300,650.00 (50%) In terms of the City’s funding share, the Project is funded in the 2025-2029 Capital Improvements Program (CIP) from account ST24C08 for the Hyland-Croy Road and Cacchio Lane Traffic Signal Project, in the amount of $390,000. Recommendation Staff recommends Council approve Resolution 04-25 authorizing the City Manager to enter into a Cost Sharing Agreement with the Dublin City School District for the Hyland-Croy Road and Cacchio Lane Traffic Signal Project. Location Map 1103125015\2\AMERICAS COST SHARING AGREEMENT BETWEEN THE CITY OF DUBLIN AND DUBLIN CITY SCHOOLS FOR THE CONSTRUCTION OF THE HYLAND-CROY AND CACCHIO LANE TRAFFIC SIGNAL This Cost Sharing Agreement (the “Agreement”) is entered into as of this ___ day of _____, 2024 (the “Effective Date”), by and between the City of Dublin, Ohio, an Ohio municipal corporation (the “City”), whose mailing address is 5555 Perimeter Drive, Dublin, Ohio 43017 and Dublin City School District Board of Education, an Ohio public school district (“DCSD”), whose mailing address is 5175 Emerald Parkway, Dublin, Ohio 43017. The City or DCSD may be referred to herein as “Party” or collectively as “Parties.” RECITALS · WHEREAS, DCSD is currently constructing the Dublin Elementary XV at 6855 Cacchio Lane, which will include both Private Site Improvement Plans and Public Improvement Plans as identified on the development’s Traffic Impact Study (TIS). · WHEREAS, DCSD and the City desire to work cooperatively to help facilitate the installation of a traffic signal at the Hyland-Croy Road and Cacchio Lane intersection (“Project”) identified in the TIS. · WHEREAS, the City will design construction plans for the Project. The City is willing to construct the Project, so long as DCSD reimburses City for 50% of the design costs and 50% of the construction costs for the Project. · WHEREAS, the City shall bid and award the construction contract for the Project per the City’s statutory process to the lowest and best bidder. · WHEREAS, the City has estimated the design costs for the Project to be $61,300.00. · WHEREAS, the City has estimated the construction costs for the Project to be $540,000.00. · WHEREAS, DCSD shall be responsible for 50% of both the design costs and construction costs for the Project, which amount to an estimate of $300,650.00 (“DCSD Estimated Costs”). · WHEREAS, DCSD and the City acknowledge that they are responsible for the work and costs as outlined above as shown in the attached Exhibit A. · WHEREAS, the Parties hereto desire to set forth the terms upon which DCSD will reimburse the City for the DCSD Estimated Costs. Statement of Agreement The Parties hereto acknowledge the accuracy of the above background information, incorporate the background information herein, and agree as follows: 1103125015\2\AMERICAS 1. Incorporation. The foregoing Recitals are incorporated herein by this reference and made a part of this Agreement as if more fully set forth herein. 2. The Project. The City and DCSD shall proceed with the Project pursuant to the plans and specifications for the Traffic Improvements, pursuant to the plans and specifications set forth in Exhibit A. Construction is anticipated to begin in summer 2025 and be completed by early 2026. 3. DCSD shall pay the City the DCSD Estimated Costs within 30 days of the execution of this Agreement[JM1]. At the conclusion of the Project, the City shall provide DCSD with copies of all invoices of the work performed to complete the Project as well as a calculation of the actual cost of the Project (“Actual Project Cost”) and DCSD’s share of the Actual Project Cost (“DCSD Actual Costs”). If the DCSD Actual Costs are more than the DCSD Estimated Costs, then DCSD will pay to the City an amount equal to the difference between the DCSD Actual Costs and the DCSD Estimated Costs within 30 days of receipt of the calculation of the DCSD Actual Costs and copies of the invoices. If DCSD Actual Costs are less than the DCSD Estimated Costs, then the City will pay to DCSD an amount equal to the difference between the DCSD Actual Costs and the DCSD Estimated Costs concurrent with the delivery to DCSD of the calculation of the DCSD Actual Costs and copies of the invoice. 4. Notice. All notices given under this Agreement shall be in writing and delivered by (a) the United States Postal Service, certified mail, return receipt requested, postage prepaid; (b) personal delivery; or (c) a nationally recognized overnight air courier service; in each case sent, delivered, or emailed to the Parties as listed below. Each notice shall be deemed given upon the date received or upon first refusal of delivery. The lawyer for any Party is entitled to give notice under the terms hereof. Any Party may change at any time its notice address by delivering a change of address notice using the foregoing notice procedures. To DCSD: Jeff Stark 5175 Emerald Parkway Dublin, Ohio 43017 Stark_jeff@dublinschools.net With a copy to: Thomas F. Kibbey Squire Patton Boggs (US) LLP 2000 Huntington Center 41 South High Street Columbus, OH 43215 tom.kibbey@squirepb.com To the City: Megan D. O’Callaghan, City Manager 5555 Perimeter Drive Dublin, Ohio 43017 mocallaghan@dublin.oh.us With a copy to: Yazan S. Ashrawi 1103125015\2\AMERICAS Frost Brown Todd LLC 10 W Broad Street, Suite 2300 Columbus, Ohio 43215 yashrawi@fbtlaw.com 5. Supervision of Contactors. The City shall supervise the Contractor to ensure the Traffic Improvements and other work associated with the Project are performed in a workmanlike manner. 6. Contractor Warranties. The City shall be responsible for obtaining any warranties with its Contractors for the Traffic Improvements and the Project. 7. Title to the Project Facilities. Upon completion of the Project, the City shall be the owner of the facilities installed pursuant to this Agreement. It will be the City’s responsibility to ensure that any and all Contractors release any and all liens associated with the Project. 8. Relationship to Parties. Nothing contained herein shall be deemed or construed by the Parties or by any third party as creating the relationship of principal and agent, of partnership or of joint venture between the Parties. 9. Waiver. Except to the extent that a Party may have otherwise agreed in writing, no waiver by such Party of any breach of the other Party of any of its obligations, agreements or covenants hereunder shall be deemed to be a waiver of any subsequent breach of the same or of any other covenants, agreements or obligations, nor shall any forbearance by a Party to seek a remedy for any breach by the other Party be deemed a waiver of any rights or remedies with respect to such breach or any similar breach in the future. 10. Severability. In the event any provision of this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction, such holding shall not invalidate or render unenforceable any other provision hereof. 11. Captions and Pronoun Usage. The captions and section numbers in this Agreement are for convenience only and shall not be deemed to be a part hereof. The pronouns used herein shall be considered as meaning the person, number and gender appropriate under the circumstances at any given time. 12. Modification. This Agreement may not be amended, terminated, rescinded or otherwise modified, in whole or in part, except by a written instrument executed by the Parties hereto. 13. Authority. The Parties represent and warrant that they are authorized and permitted to enter into this Agreement and to perform each of their respective covenants and obligations hereunder. All Parties signing this Agreement have taken all duly authorized action necessary to authorize the execution of this Agreement and to execute any and all documents related hereto, and each of the Parties may rely upon this section of the Agreement without the necessity of having further documentation to evidence such authority. 1103125015\2\AMERICAS 14. Jurisdiction. This Agreement shall be governed by the laws of Ohio. Any disputes arising herein shall be adjudicated at the Court of Common Pleas of Franklin County, Ohio. [Signature Pages Follow] 1103125015\2\AMERICAS IN WITNESS WHEREOF, the Parties have caused this Agreement to be executed as of the Effective Date. DUBLIN CITY SCHOOL DISTRICT: Dublin City School District Board of Education By: Name: Title: STATE OF ______________ ) ) SS: COUNTY OF ) The foregoing instrument was acknowledged before me this __ day of _________________, 2024, by ___________________________, the __________________________ of Dublin City School District Board of Education, an Ohio public school district, on behalf of the public school district. Notary Public My commission expires: [Signatures Continue on Following Page] 1103125015\2\AMERICAS CITY OF DUBLIN: City of Dublin, Ohio By: Name: STATE OF ______________ ) ) SS: COUNTY OF ) The foregoing instrument was acknowledged before me this __ day of _________________, 2024, by ___________________________, the __________________________ of the City of Dublin, Ohio, an Ohio municipal corporation, on behalf of the municipal corporation. Notary Public My commission expires: 1103125015\2\AMERICAS APPENDIX A – CITY OF DUBLIN CERTIFICATION OF FUNDS I hereby certify that the funds required to meet the City’s obligation, payment, or expenditure under this Agreement have been lawfully appropriated or authorized for such purpose and are free from any obligation now outstanding. _______________________________________ _________________ Matthew Stiffler / Director of Finance Date 1103125015\2\AMERICAS APPENDIX B – DUBLIN CITY SCHOOL DISTRICT CERTIFICATION OF FUNDS I hereby certify that the funds required to meet the Dublin City School District’s obligation, payment, or expenditure under this Agreement have been lawfully appropriated or authorized for such purpose and are free from any obligation now outstanding. _______________________________________ _________________ _______________________________________ Date 1103125015\2\AMERICAS EXHIBIT A Hyland-Croy Road at Cacchio Lane Traffic Signal Improvement Project Construction Plans HYLAND-CROY RD AT CACCHIO LN TRAFFIC SIGNAL IMPROVEMENT PLAN NSCHEMATIC PLAN GRAPHIC SCALE 0 1 inch = 20 feet 401020Hyland-Croy RoadCacchio LaneHyland-Croy RoadHorizontal DatumThe coordinates shown on this map are based on the Ohio State PlaneCoordinate System, South Zone, NAD 83 (2011). Said coordinates arebased upon positinal solutions derived from RTK GPS observationsusing the Ohio Department of Transportation Virtual Reference SYstemEquipment and software at traverse control points numbered 200, 201,202 and 203. The grid to ground conbined scale factor(1.00001770526874) was calculated and applied at the location of pointnumber 201 (n: 777993.046, E: 1779452.020)Vertical DatumThe elevations shown on this map are based on the North AmericanVertical Datum of 1988. Said elevations are based upon positionalsolutions derived from RTK GPS observations using the OhioDepartment of Transportation Virtual Reference System equipment andsoftware and the National Geodetic Survey's GEOID18 model attraverse control points numbered 200 and 201. Elevations from saidtraverse control points were then transferred by conventional levelingprocedures to the permanent benchmarks listed hereon.BASIS OF STATIONINGHyland-Croy Road centerline Station 43+42.65 = 0+00.00 at intersectionwith centerline of Cacchio Lane as established in City of Dublin roadwayplan Hyland-Croy Rd / Riviera Connector (17-016-CIP).BASIS OF BEARINGSThe bearings shown hereon are based on the Ohio State PlaneCoordinate System, South Zone, NAD 83 (2011). Said bearings arebased upon positional solutions derived from RTK GPS observationsusing the Ohio Department of Transportation Virtual Reference Systemequipment and software. A portion of the centerline of Cacchio Lane,having a bearing of North 84⁰ 17' 36” East, is designated as the “basisof bearings” for this project. HYLAND-CROY RD AT CACCHIO LN TRAFFIC SIGNAL IMPROVEMENT PLAN GENERAL NOTES“” HYLAND-CROY RD AT CACCHIO LN TRAFFIC SIGNAL IMPROVEMENT PLAN MAINTENANCE OF TRAFFIC NOTES ··· HYLAND-CROY RD AT CACCHIO LN TRAFFIC SIGNAL IMPROVEMENT PLAN GENERAL SUMMARY NHYLAND CROY ROAD IMPROVEMENTS NCURB RAMP DETAILS GRAPHIC SCALE 0 1 inch = 5 feet 102.5 5LEGENDHyland-Croy RoadCacchio Lane Hyland-Cro y R o a d HYLAND-CROY RD AT CACCHIO LN TRAFFIC SIGNAL IMPROVEMENT PLAN Cacchio LaneHyland-Cro y R o a d PAVEMENT MARKING LEGENDSIGN LEGENDNTRAFFIC CONTROL PLAN HYLAND-CROY RD AT CACCHIO LN GRAPHIC SCALE 0 1 inch = 20 feet 401020XX HYLAND-CROY RD AT CACCHIO LN TRAFFIC SIGNAL IMPROVEMENT PLAN TRAFFIC SIGNAL GENERAL NOTES GENERALPLAN AND SPECIFICATION COMPLIANCETEN-DAY TEST REQUIREMENTSTRANSITION TO SIGNAL CONTROLSIGNAL INSTALLATION INSPECTIONTESTINGMAINTENANCE OF TRAFFIC SIGNAL INSTALLATIONMATERIAL INFORMATION SUBMITTAL AND TESTING CERTIFICATIONSIGNAL INSTALLATION & MAINTENANCE PERSONNEL REQUIREMENTSINSTALLATION LAYOUTPAINT CHIP SUBMITTALGROUNDING AND BONDING“”ITEM 625 PULL BOX, 725.06, (BY SIZE), AS PER PLANITEM 625 GROUND ROD, AS PER PLANITEM 625 TRENCH, AS PER PLANITEM 625, CONDUIT JACKED OR DRILLED, SCH 80, 6", AS PER PLAN HYLAND-CROY RD AT CACCHIO LN TRAFFIC SIGNAL IMPROVEMENT PLAN TRAFFIC SIGNAL GENERAL NOTES ITEM 625 LUMINAIRE: 100 LED, TYPE III MEDIUM, 120V, AS PER PLANITEM 625 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE, AS PER PLANITEM 630 SIGN, SINGLE FACED, ILLUMINATED STREET NAME, AS PER PLANITEM 632 PEDESTRIAN PUSHBUTTON, AS PER PLANITEM 632 VEHICULAR SIGNAL HEAD, LED, (BY SIZE), 12-INCH LENS, 1-WAY, AS PER PLANITEM 632 PEDESTRIAN SIGNAL HEAD, AS PER PLANITEM 632 COMBINATION SIGNAL SUPPORT, COC 4120, (BY SIZE), AS PER PLANITEM 632 PEDESTAL SUPPORT, (BY SIZE), TRANSFORMER BASE, AS PER PLANITEM 632 PEDESTAL FOUNDATION, AS PER PLANITEM 632 SIGNAL SUPPORT FOUNDATION, AS PER PLANITEM 632 SIGNAL CABLE, (BY CONDUCTOR), NO. 14 AWG, AS PER PLANITEM 632 POWER CABLE, 2-CONDUCTOR, CU #6 AWG, AS PER PLAN HYLAND-CROY RD AT CACCHIO LN TRAFFIC SIGNAL IMPROVEMENT PLAN TRAFFIC SIGNAL GENERAL NOTES ITEM 632 POWER SERVICE, AS PER PLANITEM 633, CABINET, TYPE TS-2, AS PER PLANITEM 809, ATC CONTROLLER, AS PER PLANITEM 633 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS PER PLANITEM 633, CONTROLLER WORK PAD, AS PER PLANITEM 633, CABINET FOUNDATION, AS PER PLANITEM 633 EMERGENCY VEHICLE PREEMPTION, AS PER PLANITEM 816 VIDEO/RADAR DETECTION SYSTEM, AS PER PLANITEM 1001 EXISTING UNDERGROUND SYSTEM REMOVAL (MIS-902), AS PER PLANITEM 1001 FOUNDATION REMOVAL (MIS-900), AS PER PLAN HYLAND-CROY RD AT CACCHIO LN TRAFFIC SIGNAL IMPROVEMENT PLAN BBS GENERATOR POWER PANEL3/16„ƒ Hyland-Croy Road Cacchio LaneSIGNAL HEAD CONFIGURATIONPROPOSED VEHICULAR TRAFFICHEADS 1, 3 & 6HEAD2 & 4HEAD5SIGNAL HEAD CONFIGURATIONPROPOSED PEDESTRIANDETAIL 'A'Hyland-Cr o y R o a d NTRAFFIC SIGNAL INSTALLATION PLAN HYLAND-CROY RD AT CACCHIO LN GRAPHIC SCALE 0 1 inch = 20 feet 401020 STREET NAME SIGNSMAST ARM MOUNTEDZ1LEGENDPEDESTRIAN PUSHBUTTON SIGNSCABINET WORK PAD AND FOUNDATION DETAILNO SCALEFuture DriveINTERNALLY ILLUMINATEDTYPICAL PULL BOX & CONDUIT ENTRY DETAILNO SCALEHYLAND-CROY RD AT CACCHIO LN TRAFFIC SIGNAL IMPROVEMENT PLAN NTRAFFIC SIGNAL DETAILS HYLAND-CROY RD AT CACCHIO LNTIMING CHARTVEHICLE DETECTOR DETAILSWIRING DIAGRAM LEGENDSIGNAL CABLE CONDUCTOR LEGENDWIRING DIAGRAMFIELD WIRING HOOK-UP CHARTPROPOSED GROUND MOUNTED CONTROLLER WITH UPS PHASING DIAGRAMSTOP LINE DETECTION ASSIGNMENTSDILEMMA ZONE DETECTIONHYLAND-CROY RD AT CACCHIO LN TRAFFIC SIGNAL IMPROVEMENT PLAN POLE FABRICATION AND ORIENTATION DETAILS HYLAND-CROY RD AT CACCHIO LNSIGNAL ELEVATION DETAILTOP VIEWSECTION A-APOLE PLATE SKIRTMAST ARM STEEL BASE COVERPEDESTAL ELEVATION DETAILORIENTATION DETAILTYPICAL SIGNAL SUPPORTORIENTATION DETAILTYPICAL PEDESTAL SUPPORTHYLAND-CROY RD AT CACCHIO LN TRAFFIC SIGNAL IMPROVEMENT PLAN