HomeMy WebLinkAboutResolution 52-24RECORD OF RESOLUTIONS BARRETT BROTHERS - DAYTON, OHIO Form 6301 Resolution No._22-24 Passed ; ACCEPTING THE LOWEST AND BEST BID FOR THE RIVERSIDE DRIVE WEST SHARED USE PATH PROJECT (22-019-CIP) WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Revised Dublin Charter and Chapter 37 of the Dublin Code, for the Riverside Drive West Shared Use Path Project (22-019-CIP); and WHEREAS, Council has determined that the bid submitted by V3 Construction Group, Ltd. on September 18, 2024, constitutes the lowest and best bid. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, Delaware, Franklin and Union Counties, State of Ohio l of its elected members concurring, that: Section 1. The bid submitted by V3 Construction Group, Ltd. in the total amount of $790,500.00 is hereby accepted. Section 2. The City Manager is hereby authorized to enter into a contract with V3 Construction Group, Ltd. for the performance and completion of the Riverside Drive West Shared Use Path Project (22-019-CIP) pursuant to the Advertisement, Proposal and Contract Documents for said Project on file in the office of the City Engineer. Section 3. This Council further hereby authorizes and directs the City Manager, the Director of Law, the Director of Finance, the Clerk of Council, or other appropriate officers of the City to prepare and sign all other agreements and instruments and to take any other actions as may be necessary to implement this Resolution and complete the work for this Project. Section 4. This Resolution shall take effect upon passage in accordance with Section 4.04(a) of the Revised Dublin Charter. Passed this 7 day of October, 2024. fe. A. B— Mayor - Presiding Officer ATTEST: Deed LI ade ces Coyhcil To: Members of Dublin City Council From: Megan D. O’Callaghan, P.E., City Manager Date: October 1, 2024 Initiated By: Paul A. Hammersmith, P.E., Director of Engineering/City Engineer Brian D. Gable, P.E., Director – Capital Projects Jared A. Groves, P.E., Civil Engineer II Re: Resolution 52-24 – Accepting the Lowest and Best Bid for the Riverside Drive West Shared Use Path Project (22-019-CIP) Summary On September 18, 2024, three (3) bids were received and publicly opened for the Riverside Drive West Shared Use Path Project, 22-019-CIP (Project). The Project constructs 880 feet of shared use path along the west side of Riverside Drive from Emerald Parkway to the Dublin Arts Council Driveway (7135 Riverside Drive), including a 130-foot single span steel pedestrian bridge. The Project will provide a valuable extension of existing shared use paths and greatly improve the shared use path network connectivity in the area, providing for additional future pedestrian connectivity along Riverside Drive and providing a valuable connection to the Dublin Arts Council. Please see the attached Project Location Map for reference. The budgeted funds for the Riverside Drive West Shared Use Path Project in the 2024-2028 Capital Improvements Program (CIP) are $720,000 from account ET201. The engineer’s estimate for this Project is $840,000. The cost of utility relocation for this project is $91,902.78, which was encumbered in 2024. Engineering has consulted with Finance, and staff anticipates being able to cover the additional Project cost using other unencumbered budgeted funds in the CIP. V3 Construction Group, Ltd. submitted the lowest and best bid of $790,500.00. Staff has reviewed all bids and a summary of the bids received is listed below. Bidder Bid as Read Bid as Read Corrected Bid Over (+) or Under (-) Engineer’s Estimate V3 Construction Group, Ltd. $790,500.00 - 5.89% N/A Double Z Construction Company $817,593.51 - 2.67% N/A Strawser Paving Company $843,849.20 + 0.46% N/A Utility relocation for this Project is expected to commence in October and be completed prior to construction in 2025. Construction for the Project is expected to begin mid-2025 due to the anticipated lead time for the pedestrian bridge. The Project will be complete in fall 2025. The City has been in regular communication with the property owners adjacent to the upcoming work on this Project. The typical and customary communication methods will be used to convey construction information with these property owners and residents throughout the duration of this work. The City will have a designated Engineering Project Inspector assigned to the work for this Office of the City Manager 5555 Perimeter Drive • Dublin, OH 43017-1090 Phone: 614.410.4400 • Fax: 614-410-4490 Memo Resolution 52-24 – Accepting the Lowest and Best Bid for the Riverside Drive West Shared Use Path Project (22-019-CIP) October 1, 2024 Page 2 of 2 Project who will provide coordination, be available to answer any questions and manage access needs throughout the performance of the work. Recommendation Staff has thoroughly reviewed the bid submitted by V3 Construction Group, Ltd. Previous experience with this contractor has been favorable, including the Waterway Maintenance Program 2022 Project (22-030-CIP). Staff is confident that V3 Construction Group, Ltd. will do well performing the work for this Project. Staff recommends Council approve Resolution 52-24 accepting as lowest and best the bid of V3 Construction Group, Ltd. in the amount of $790,500.00 and authorizing the City Manager to enter into a contract with V3 Construction Group, Ltd. for this Project. Location Map