Loading...
HomeMy WebLinkAboutResolution 51-24RECORD OF RESOLUTIONS Form 6301 BARRETT BROTHERS - DAYTON, OHIO Resolution No. 91-24 Passed ; ACCEPTING THE LOWEST AND BEST BID FOR THE SANITARY SEWER LINING & REPAIR 2024 PROJECT (24-012-CIP) WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Revised Dublin Charter and Chapter 37 of the Dublin Code, for the Sanitary Sewer Lining & Repair 2024 Project (24-012-CIP); and WHEREAS, the adopted Community Plan states an objective to provide safe and efficient collection of wastewater; and WHEREAS, Council has determined that the bid submitted by United Survey Inc. on September 13, 2024, constitutes the lowest and best bid. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, Delaware, Franklin and Union Counties, State of Ohio 7___ of its elected members concurring, that: Section 1. The bid submitted by United Survey Inc. in the total amount of $1,399,470.00 is hereby accepted. Section 2. That the City Manager is hereby authorized to enter into a contract with United Survey Inc. for the performance and completion of the Sanitary Sewer Lining & Repair 2024 Project (24-012-CIP) pursuant to the Advertisement, Proposal and Contract Documents for said Project on file in the office of the City Engineer. Section 3. This Council further hereby authorizes and directs the City Manager, the Director of Law, the Director of Finance, the Clerk of Council, or other appropriate officers of the City to prepare and sign all other agreements and instruments and to take any other actions as may be necessary to implement this Resolution and complete the work for this Project. Section 4. This Resolution shall take effect upon passage in accordance with Section 4.04(a) of the Revised Dublin Charter. Passed this 7 day of October, 2024. Lt A~ AB Mayor - Presiding Officer ATTEST: ade (Lb Clefk of J Youncil To: Members of Dublin City Council From: Megan D. O’Callaghan, P.E., City Manager Date: October 1, 2024 Initiated By: Paul A. Hammersmith, P.E., Director of Engineering/City Engineer Michael B. Hendershot, P.E., Director of Utilities and Stormwater Management Thomas E. Fuqua III, Civil Engineer I Re: Resolution 51-24 – Accepting the Lowest and Best Bid for the Sanitary Sewer Lining & Repair 2024 Project (24-012-CIP) Summary On September 13, 2024, eight (8) bids were received and publicly opened for the Sanitary Sewer Lining & Repair 2024 Project, 24-012-CIP (Project). The scope of work for this Project includes cured-in-place lining and associated repairs of 8-inch, 10-inch, and 12-inch sanitary sewer mains within the City of Dublin’s sanitary sewer collection system. The locations are determined by closed circuit televising (CCTV) of the sanitary sewer collection system previously collected by City staff. The lining of the sanitary sewer protects the integrity of the pipe system and prevents stormwater infiltration into the system which reduces the frequency and occurrences of sanitary sewer overflows and water in basement events. Additionally, the Project is a critical component of the City of Dublin’s ongoing efforts to maintain its sanitary sewer infrastructure and meet the Ohio Environmental Protection Agency (OEPA) Director’s Final Findings and Orders agreed upon by the City of Dublin on February 11, 2009. The budgeted funds for the Project in the 2024-2028 Capital Improvements Program (CIP) are $1,500,000 from account SS24M02. The engineer’s estimate for the Project is $1,400,000. United Survey Inc. submitted the lowest and best bid of $1,399,470.00. Staff has reviewed all bids and a summary of the bids received is listed below. Bidder Bid as Read Bid as Read Corrected Bid Over (+) or Under (-) Engineer’s Estimate United Survey Inc. $1,399,470.00 (-) 0.03% N/A Inliner Solutions LLC $1,458,921.00 (+) 4.2% N/A Insituform Technologies LLC $1,467,524.50 (+) 4.8% N/A SAK Construction, LLC $1,469,893.00 (+) 5.0% N/A Insight Pipe Contracting, LLC $1,476,218.00 (+) 5.4% N/A Miller Pipeline LLC $1,529,252.80 (+) 9.2% N/A Visu-Sewer, LLC $1,746,036.00 (+) 24.7% N/A Advanced Pipe Technologies $2,672,813.50 (+) 90.9% N/A Office of the City Manager 5555 Perimeter Drive • Dublin, OH 43017-1090 Phone: 614.410.4400 • Fax: 614.410.4490 Memo Resolution 51-24 – Accepting the Lowest and Best Bid for the Sanitary Sewer Lining & Repair 2024 Project (24-012-CIP) October 1, 2024 Page 2 of 3 The sanitary sewer lining locations include the subdivisions of: Asherton, Dublinshire, Earlington Village, Indian Run Meadows, Villas at Earlington, Woods of Dublinshire, and Woods of Indian Run. Please see the attached Project Location Map for reference. The work for this Project is expected to commence in November 2024 and by completed by May 2025. Resident Communication The typical and customary communication methods will be used to convey construction information to residents and the general public throughout the duration of the Project. The contractor will provide notification to all impacted residents approximately 7 (seven) calendar days prior to work being performed. The notification will be in writing and will include the contractor name and 24-hour phone number, a description of work being performed, and instructions to impacted residents. A second written notification to all impacted residents will be provided 24 (twenty-four) hours in advance of work being performed. This notification will include specific dates of work, start times, and any water/sanitary sewer restrictions if necessary. A third written notification to all impacted residents will be made immediately upon completion of work. All efforts will be made to maintain access to resident homes during construction. The City will have a designated Engineering Project Inspector assigned to the Project, who will be available to answer questions and manage access needs at adjacent residences throughout the Project. Staff will ensure that appropriate communications, project coordination/monitoring, traffic control and site restoration are performed throughout the Project duration. Recommendation Staff has thoroughly reviewed the bid submitted by United Survey Inc. This contractor has not previously performed work with the City of Dublin, and as a result staff made inquiries to the references provided by the contractor. Additionally, staff reviewed the list of past and current projects submitted with United Survey Inc.’s bid. City staff is confident that United Survey Inc. has the capability, resources and experience to perform this Project, and will do well performing the work for this Project. Staff recommends Council approve Resolution 51-24 accepting as lowest and best the bid of United Survey Inc. in the amount of $1,399,470.00 and authorizing the City Manager to enter into a contract with United Survey Inc. for this Project. Resolution 51-24 – Accepting the Lowest and Best Bid for the Sanitary Sewer Lining & Repair 2024 Project (24-012-CIP) October 1, 2024 Page 3 of 3 Location Map