Loading...
HomeMy WebLinkAbout05-13-24 Work Session MinutesWORK SESSION DUBLIN CITY COUNCIL 5555 PERIMETER DRIVE MAY 13, 2024 Minutes Mayor Amorose Groomes called the Monday, May 13, 2024 work session to order at 6:00 p.m. Council members present: Vice Mayor Alutto, Mayor Amorose Groomes, Ms. De Rosa, Ms. Fox, Mr. Keeler, Ms. Kramb and Mr. Reiner. Staff present: Ms. O’Callaghan, Ms. Rauch, Ms. Willis, Chief Paez, Mr. Hammersmith, Mr. Gracia, Chief Paez, Ms. Blake, Mr. Ament, Ms. Babbitt, Mr. Ashrawi, Mr. Will, Ms. Wawszkiewicz, Ms. Goliver, Mr. Bitar. Others present: Martin Zogran, Letitia Tormay, and Anthony Polidoro, Sasaki Associates; Michael Ryzhov, SB Friedman Development Advisors; and Miles Hebert and Mike Brehm, EMH&T Pledge of Allegiance Mayor Amorose Groomes invited Mr. Keeler to lead in the Pledge of Allegiance. Metro Center Revitalization Implementation Ms. O'Callaghan stated that the team has made a lot of progress on this goal since the last work session in January. She stated that this is a comprehensive effort that touches many divisions within the City. Ms. Rauch stated that the consultant team has done a lot of work with our staff groups over the last several months to get to this point. She introduced Martin Zogran, Letitia Tormay, and Anthony Polidoro, Sasaki Associates; Michael Ryzhov, SB Friedman Development Advisors; and Miles Hebert and Mike Brehm, EMH&T. She reviewed the agenda for the evening. She stated that staff would be looking for feedback regarding the three scenarios that will be brought forward. The goal is to come out of this meeting with the scenario that Council would like staff to implement. Mr. Zogran provided a presentation (attached hereto and incorporated herein by reference as Exhibit A) and stated that they will introduce and review three alternative urban design frameworks and identify a scenario that is preferred. He provided a schedule showing where we are in the process. He stated that this meeting will help to refine an urban design framework that illustrates preferred development patterns that will guide the future development of Metro Center. He shared that from identifying the framework, transportation studies will be advanced and catalytic projects will be identified and implemented. He referenced some of the visioning work that has already been done and highlighted the desired concepts that came out of the visioning. He summarized what he has heard out of conversations with City Council, stakeholders and the public visual survey. There are four pillars that have been identified that describe the vision for Metro Center, they are: e Redefine the identity and shape a unique sense of place, e Rebalance the District, May 13, 2024 Work Session Page 2 of 5 e Reprioritize mobility and strengthen connectivity, and e Reimagine water systems and create purposeful open spaces. Mr. Zogran used Bridge Park as an example of urban space with open spaces that are not really integrated with each other. He stated that they want to do something different with Metro Center and integrate the spaces. He showed the three design alternatives (below), which are referred to as: e Green Grid, e Central Park, and e Blue Meander. Green Grid Central Park Blue Meander Two landscaped stormwater corridors Stormwater detention fs consolidated into a Biue Meander centers a dynamic open connect stormwater ponds along Metro larger community scaled Central Park along space and stormwater corridor that winds Place North to Cosgray Run. Each corridor Metro Place North. Anchoring the view through the Metro Place Loop to create an provides ecological value as well as across this park from Frantz Road, a major ever changing series of vistas. The central amenities for adjacent uses within an overall cultural amenity pulls visitors deeper into the greenspace {Is bordered by cultural, retail, grid system of street and blocks. site. Green paths radiate out from this park, residential, and office uses to create a varied connecting south to Cosgray Run and east to and ever-changing experience. Frantz Road. Mr. Zogran stated that as part of the engagement process, they spoke with the property owners in Metro Center. He stated that there were three main takeaways from those conversations, the first of which is parking. A big part of the current appeal of Metro Center is the accessibility and parking. The second is the MOA, the Metro Owners Association which is a group that comes together to manage the snow removal, streetscape and the stormwater system. The existing detention ponds need improvement and maintenance. Finally, he stated that the Metro Center property owners are willing to participate in the future of Metro Center and what that should be. They are excited about a vision for the area. Market Analysis Mr. Ryzhov provided an overview of the market analysis including metrics around jobs, occupancy, and product types. He stated that today, office space accounts for three-quarters of total Metro Center rentable building area. There are no residential areas within Metro Center, which limits activity outside of working hours. He shared a graphic of the office space that is available according to the percentage of availability (Exhibit A). He stated that the Metro Center office availability rate as a whole is about 25%, and by comparison, Franklin County overall is at about 13.5%. Metro Center job counts have been stable over the last decade. He shared additional graphics regarding employee visits to the Metro Center (Exhibit A). Mr. Ryzhov shared projected housing unit demand. He stated it is estimated that Metro Center would be able to capture 890 — May 13, 2024 Work Session Page 3 of 5 1,210 housing units. Regarding office, most new office buildings in Dublin’s submarket are smaller, multi-tenant spaces. He stated that Metro Center can support approximately 90,000 square feet of new retail space by 2040. This statistic is based on Dublin’s projected retail growth. Mr. Ryzhov concluded with strategic considerations for redeveloping Metro Center, which are: e Lead with high quality retail; Crease a sense of place; Increase the residential base with multi-family; Follow rental with for-sale housing; and Explore missing middle/creative office typologies. Transportation and Stormwater Analysis Mr. Brehm stated that Metro Center is very isolated today. It is appropriate to consider more regional connectivity as redevelopment is considered. He added that this look at connectivity is in conjunction with other studies that the City is already involved in, such as BRT (Bus Rapid Transit) and LinkUS. Mr. Brehm showed a map illustrating four potential alignments between Shier Rings Road and Metro Place (Exhibit A). He reviewed each of the four options crossing I-270 and the impacts of each option. Option 4 is emerging as the preferred option (Shier Rings Road to Metro Place South, avoiding 655 Metro Place). Mr. Brehm stated that a Blazer Parkway connection in the short-term would provide an alternate route to Frantz Road. He shared that the Blazer Parkway connection can be a complete street with generous bike/pedestrian accommodations that goes all the way to Tuttle. Mr. Brehm stated that they are also planning for the Signature Trail to go through Metro Center even though the exact route of the Signature Trail is not yet known. Systems Approach Mr. Hebert stated that there are a few different philosophies relating to stormwater management. Mr. Hebert reviewed the three systems approaches that can help to inform redevelopment. The first approach is most like what is there today, consolidated regional retention basins with some disbursement on individual sites. The second is each individual lot manages its own stormwater. This approach takes away from the goal of using stormwater retention water as an amenity or feature. The third is a hybrid solution, which is a combination of the first two and integrated into the Site Landscape Strategy. This option would allow some green infrastructure to be included as well. Mr. Zogran reiterated the four pillars for transforming Metro Center: Redefine the identity and shape a unique sense of place, Rebalance the District, Reprioritize mobility and strengthen connectivity, and Reimagine water systems and create purposeful open spaces. Mr. Polidoro reviewed a map of the existing condition of Metro Place before introducing the three design alternatives: Green Grid, Central Park and Blue Meander. Ms. Tormay reviewed the landscape themes associated with each of the design alternatives. Mr. Zogran explained what were identified as catalytic sites for each of the three alternatives. e The Green Grid is a design that bolsters and improves the assets as they are today. He stated that creating the sense of place early within the redevelopment is important. This alternative shows the crossing over I-270 and an extension of Blazer Parkway to allow May 13, 2024 Work Session Page 4 of 5 additional access points into the Metro Center area. In terms of development, it is clear that there is a need to introduce new uses to the area. e The Central Park design keeps existing stormwater ponds and expands upon them with a centralized park location. The connections are the same over I-270 with this option and Blazer Parkway is extended through the center of the location closer to the park space. The development with this option is very similar to the first option. e The Blue Meander option dramatically changes the open space within the development. This option focuses on a relationship between the architecture and the landscape itself and looks at removing the vehicular component from the open spaces. The major connections of this option work to bring the activity to the center of the site. Mr. Reiner stated that the relationship between buildings and water should be a major feature of the area. He added that he feels that the proximity of humans to water is important. Mr. Keeler stated that water was high on the list of the survey results. He showed support for the Central Park concept. He liked the scale of the water and stated that having smaller disbursed sections of water may be missed. He suggested making sure there were breaks between family friendly areas and adult areas. It is very important that the development along Frantz Road allow enough room to have a visual into the area. He added that having the lake area along Metro Place North would have a visual impact. Ms. Fox stated that she likes the Blue Meander option. She likes it because it is unique and the water stretches across the area. She likes the Central Park idea with a catalytic use. The multi- family buildings should be a variety of shapes and purposes. Ms. Kramb likes both the Blue Meander and the Central Park and suggested a sort of hybrid of the two options. She liked the visibility from Frantz Road and the features that would draw people into the area offered by the Central Park option. She is concerned about the main entrance being across from Corbins Mill. She likes the Blue Meandering option, but feels it is more hidden and only accessible for the people who live here. She likes the water throughout the space. Ms. De Rosa showed support for the meandering option. She likes the potential of discovery and draw for people to come and walk, bike, etc. The crossing of the road into the area and connectivity to the rest of the City will be important. She is not supportive of a big event center in the middle of this space. It could be an interesting eatery, retail, etc. space. Vice Mayor Alutto likes the meandering option. She stated that she is a little worried it will be hidden without the proper view into the area from Frantz. Mayor Amorose Groomes stated that she has a desire to keep water in the center and make this a pedestrian zone. She would be supportive of pushing some of the buildings to the edge. She expressed that she does not want a bunch of little ponds. She would like the signature trail to come through this area. She advocated for a strong eco-system. She agrees there needs to be water engagement and event opportunities. There could be pedestrian crossings in the area over the body of water, but not vehicular. She is not supportive of seeing cars driving through the center of this. She agreed that keeping it open at Frantz Road is critical for visibility. May 13, 2024 Work Session Page 5 of 5 City Council participated in a board exercise from 7:14 p.m. — 7:35 p.m. Mr. Zogran stated that Council seemed to reach consensus on an option. He shared some of the comments he received during the exercise from Council Members: e Mr. Keeler and Mr. Reiner expressed the importance of visibility of water features; e Ms. Kramb gave clear thoughts on the meandering being a gathering space that is visible from Frantz Road; e Ms. Fox expressed the importance of architecture and variety; e Ms. De Rosa shared thoughts about year-round activity with retail and restaurants; and e Mayor Amorose Groomes mentioned the ecological standpoint of the water features is important and should be carefully planned. He stated that the idea for transportation centers around using the loop and providing access, but that the center core would be vehicle free. Ms. Kramb stated that the Blazer Parkway extension should be along the western connection so it is routed more toward the outer loop and keeps vehicles out of the center. Ms. De Rosa agreed with that suggestion. Mr. Keeler stated that he heard from a tenant on the inner loop of Metro and his concern was having parking available. Mr. Keeler stated he was in favor of keeping the area vehicle free, but it needs to be discussed with the property owners. Mr. Zogran stated that there is a way to have access without crossing over the green space and the consultant team will explore that. Mr. Hebert stated that there are some challenges with moving the stormwater basins, but it is doable. Mr. Zogran commented on the desire to have a variety of unique architecture. He welcomed Council's ideas and inspirational photos they may have. Ms. Rauch will compile any information received from Council. Ms. Fox asked how the inspiration should be sold to developers so they understand what is desired and they express creativity with this area. Ms. De Rosa stated that she would like to see Option 2 in the catalytic sites come back with a variety of retail to activate the area year-round. Next Steps Ms. Rauch stated that the consultant team will take the feedback and be prepared to bring back more specific considerations around the catalytic sites. There will be two more opportunities to discuss prior to the end of September. Mr. Gracia stated that there is some private property engagement that needs to happen now that there is a direction forward. Adjournment There being no further business, the meeting was adjourned at 7:57 p.m. LOZ 3 Mayor - Presiding Officer Cleyk/of Cousfeil METROCENTERREVITALIZATIONCITY COUNCIL WORKSHOP May 13, 2024•OverviewWhat we heardScenarios preview•Technical updatesMarket analysis summaryDiscussionTransportation and stormwater updatesDiscussion•Transforming Metro Center: Three scenariosDiscussion•Next StepsToday’s Agenda2 | Metro Center RevitalizationMeeting Purpose•Report on our progress since January•Introduce and review three alternative urban designframeworks•Have a thorough discussion of the scenarios, evaluatepros and cons and the features that should be keptand developed•Identify a (possibly modified) scenario as preferred•Discuss next steps to develop a plan for Metro CenterRevitalization3 | Metro Center Revitalization::Our ProcessWe are hereMayMay::4 | Metro Center Revitalization 2021/22 Visioning ReviewConcept A: Infill DevelopmentConcept B: RedevelopmentSupport existing office tenants with complementary uses, amenities, and servicesConsolidate underutilized surface parking to create new opportunities for a mix of usesEmbrace walkability and transportation options that link the district to the citywide networkProvide a variety of new housing types for workers and residents Foster a sense of place and identity unique to Metro CenterEstablish a unique natural open space amenity and connect the district with greenspace5 | Metro Center Revitalization• CITY COUNCIL• PUBLIC VISUAL SURVEY• STAKEHOLDERSWHAT WE HEARD6 | Metro Center RevitalizationWhere we left off(City Council Workshop in January 2024)Implementation / Land Use•Economic feasibility is paramount•Beach head projects must be successful andcreate momentum•Live/Work balance•Create an 18hr district/destinationMobility•Metro Center needs a street network•Separated mobility – protected bike lanes,pedestrian pathways – shared streetsPublic Realm•Excitement, novelty – landscape, architecture,activities•Signature recreational trail must connect to thecity-wide bicycle/pedestrian network and be adestination itself•Working, interactive landscape – rest &recreation, habitat, stormwater management•Make this a community assest rather than justan office park, include destinations that apeal toa broader set of users•Outdoor dining, intimate places to play, fun familyspaces•Year round attractions7 | Metro Center RevitalizationWhat We Heard(City Council Workshop in January 2024)8 | Metro Center Revitalization What We Heard(Public Meeting Visual Survey January 2024)9 | Metro Center RevitalizationRedefine the Identity & Shape A Unique Sense of PlaceRebalance the DistrictReprioritize Mobility & Strengthen ConnectivityReimagine Water Systems & Create Purposeful Open Spaces10 | Metro Center RevitalizationGreen Grid Blue MeanderCentral ParkDesign AlternativesTwo landscaped stormwater corridors connect stormwater ponds along Metro Place North to Cosgray Run. Each corridor provides ecological value as well as amenities for adjacent uses within an overall grid system of street and blocks. Stormwater detention is consolidated into a larger community scaled Central Park along Metro Place North. Anchoring the view across this park from Frantz Road, a major cultural amenity pulls visitors deeper into the site. Green paths radiate out from this park, connecting south to Cosgray Run and east to Frantz Road. Blue Meander centers a dynamic open space and stormwater corridor that winds through the Metro Place Loop to create an ever changing series of vistas. The central greenspace is bordered by cultural, retail, residential, and office uses to create a varied and ever-changing experience. 11 | Metro Center Revitalization27027033BlazerPkwySSSShamrocShamhamrhahamhamrocShamrococShamrocShamrochamrocSSoccShamrocSSShamrocchamroccSShShamroccSSShamrocSShShamrocSSSShhcSSSShkkkkkkkkkkkkkkkkkkkkkkkkkkkSoSouSouth FSouSouth FSouthSouth th FSouth FSouth FSouth FFh Fth FSouthSouth Fh FSouth Fh Fork orkorkorkorkork orkkork orkork ork rk orkkkoIndianIndiandian ndiandianndianIndInnddiIndiIndianddIndan RunRunuunRuunnnDublin Dublin n in DubliinnDublin bliblin lblDublDubliDublinDublinnDublinn DDDDblbllllDublinDublinnnnnn ublin bliinnblinDliinPlazPlazaPlazaPlazaPlazaPlazazPlazaPlaaPlalaaaPllaaaaaazzlaaaaazzPlaaaazallazzShoppinShoppinShoppinhoppinhhhoShoppininShoppinShoppinhhooooponhoppinoppinppinnnnpg Centeg Centeg Centeg CenteCentegCCCeg CenteCentCeg gg Cenegg Cg g CenCgggggCgggrrrrMontereMontereMontereMonMonterMontereterMonteMMMoyy yy yParkParkParParkParkParkParkPParkaraCoCosgrayCosgrayCosgrayCosgrayCosgraCosgrayCosgrayosgrayCCosgrayCosgrayCosgraygrayyCoCosgrayCCosgraysgraysgrayosgrraCosgraygraRRunRunRunRuRununRunRuRRunRunRunRunRunRRunRunnRuunnnCosgrayCosgrayCosgrayCCCosgrayCCCCCCCCCCCCCCRunRunRunRunCorbinCorbirbinsCorbinsCorbinsCorbinsCorbinsorbinsrbinsorbinsCorbinCorbinsCorbinssCorbinCorbinsCorbinsrbinsnsbinsCorbiCorbininCorbinCorbinCorbibbbCorbCorCororCoCCMll DDMill DMill DMill DMillill DMill Dill Dill DDMill DlMill MilllMill llMillMillMillMilMiMMMrrrrrrMonteMMontereMontereMontereMontereeMontereMontereMontereMonterentereMontereMontereMontereMontereMonteMontereMontereMontereMonterterenterenteereMonteMonteerMontereMontereonteretMonterentereMoneereeMMoDy Dry Dry Dry DyDryDry Dry Dy Dry DryDryDyDryDyy Dy DDyy yyyyyyyyyyyrbiCorbiCorbinsCorbinsCorbinsorbinCorbiobCorbinsCorbinsCorCorbCorbinnCorbinsrCorbinsrbinsCorbinssCorbCorbinsCorbinbinsisorbinbCorbinsbinCorbinsorbinsbiMMMill DMill DMMMilll ill DMiMill DMillMill DMill DMMMill DllDMill DMill DMill DMMillDMill DDl DDlll DDDrrrrrrrrrEdinbEdinburEdinburEdinburEdinburdinburdinbuEdinburEdinbudinbuEdinburEdinburEdinburdinburEdinburdinburdinburinEdinburEdinburEdinburdinbuEdinbudinbudinbudinbubuEdinburEdindinbunburEdinnbuEdinbuburEdEdinbnbnbunbunngh Rdgh Rdgh Rdgh Rdgh Rdgh Rdh Rdgh Rdgh Rdh Rgh Rdgh Rdgh Rdgh Rdgh Rdgh Rdh Rdgh Rgh Rdgh Rdgh ghh RdRdgh Rdgh Rdgh RdRdddRghMetroMetro PMetro PMetrMeto etro Petro PtMetro PMetro PMetro PMetroMetro PMetro PMetro PPMetro PMetro Pro PtrMetro PrPMetro Petro PMetro PMetretro PMMMMMMMMtrero PrrrooPlaceNace NlaceNllalaceNNNace NNlace Nlace Nce Nce Nlace Nace Nlace Nace NNlace NNNace NNNPost Rdost RdsPost Post RPost RdPost Rdost RdPost RRt RdsMMetr PMMMMMMetr PMetro PMetro PMetro PMetro PMetro PMetro PMetro PMMetretro Petro PMetro PMetro PMetro PMetro Metro PMetroetro PMetro Petro PtttMetro Petro Ptro Petro Pro Pro PoPoPPMetro PoPPPPPeMMlaclllace Sacace Sllace Slaceace Sace Sce Slace Slace Slaceaaaceace SeSlace Sacelace Sace Sce Scece SSSSSeSeSlace eSeSace Sacece SSeehiereRReShier RShierShier RShier RShier RShier RrRSShier RShi RShShier Rhi RiiShier Rhier RShierhiiRRRRRRRRShierRShier Rniings Rdings Rdngsings Rdings Rngs RdgRdingsiiiigsings Rdiingsiings Rdings Rdddings Rdings Rdings RinnnngggsiggssRRRRdngsnnWaterfWWaterWaterfWaterfoWaterfotertWaterfWateererfWaterfrfoWaterfoWaterfWaterforforfoWWaterfWaterfWaterfotteWaterfererfoWaterfoerfofffooWaterfWaterfWtterftererfeeerrforfWWWatterfoWatererrffffoerfoWWWterforrforrfffoooWWWWaterfooerfooWaterfoWWWWaterfoeeerrffoooWWeerfoeerforrfoWeerforrffooWWWWWefordrdrddddddrdddddrdrdrdrdrdrdrdrddrdrddrdrrddddrrrdrddrrd rrdddddddddVillVillageVillageVVillageVillVillVVillageillilllagllagllaglagageVillageageillageaggegeVillageVillageVillageVillagVVVillageViilllagelaglagelageageVillageVillaVillaagggggglageVillageVillageVillVillagVVVillageillallagelllaglaglaglaVillageageaggggVillageVillagegeeVillageVVillageVillaVillagellllageVillaaVillageeeelageVillagVillagellagellillagegeeVillageVVillaVillageVillaillagellVillagegeVillageVillagilgggeVVillageVillagellagagggVillaggeellagVillaaeeThe BThe BlaThe BBlaeBBBllallaThe BlaThe BlaBBBlllaBlaBBBlaaaBlaaaBBlle BlaaaaBlalBlaaBllaBBzzzer zerzzzezezezzezezePlazaPlaPlazaPlazaazaaPlazaaazaaazaaaPlazaaazPlazzazazaaaaazaaazzaaDDDDDuuuuuublinDublinnDDDublinuDDDDuuuDDunDDDDuuuDuDDuuIIIndundustndusndusndusndndndusndususuundussstrstrtIndustrIndustrIndustrrIIndustnssndusuuustrttrustrtIusuuttrIndustruutIndustruuIuuttial Paial PlPlPPal Paial Paial Paial Paararial PaPPial Paarrial Paialal Pal Paal PaPaParial Paiaial PalPPPPPaaPaPPPPaaaPPaaaaarPakkkkkkkkUpper pper Metro PMetro PMetro PMMMetro Petro Ptro PMetro PMMeMMeMMetro PMetro PMetroetro PttMetro Ptro PMetro PMetro PMeMMMetro PeetettroPMetroMetrMetro PMettrooPPPMetro MeettetrorMetro PMetMetro MereteroPlalalaclaclaccececececlacceecceccaaclaacFrantzFrantz Frantz FrantzrantznFrantzFrantzntrantz raantzantzannz RdRdRdRdRdRddRRRRRRdRdRdddddddddd Frantz tFrantzantzFrantFFFranFrantzFFFFFranantzFrantzFrantz FFFrantzFrantz FFranFrantz FrFrantz Frantrantz tzantz ananantzantz antzanananntzntnttz ttztzzz RdRdRRdRRdRdRRRRRRRRRRRRdRdRRdRdRdRdRdRdRdRdRdddddddddddd zeezeBlazerBBlazerBlazerBlazer Blazer rBlazer rr lazeeazereeeeazezerBlazBlazzazBlazerazer BaBlarrBlazerBlalaazeerazerlazerrazerBBBBlBlazeBlazelazeBlazeazeBlazeBBBlaBlazeBlazezeBazBlazazaBlazzazlaaalaBBBBPPPPkwyPkwykwyPkwyPkwyyPPkwyPkwyPPkwkwPkwyyPkwwwwwwwywykkwPPkPkkwkwkwkwyPkwykwyPPPkkkywykwyykwyPPPPkPkwkwykwykwykwykwyPwwyPkwyPkwyPwwwyPkwykwyykwwwwwwkwkkkkPPPPPPPPPPPmerEmeraldEmeraldEmeraldEmeraldEmeraldEmeraldEmeralddEmeraldEmeraldEmeraldEmeraldldEmerammemywkyPwkyPwkyPwkyPwkyPwkyPwkyPwkyPwkPwkPwkyPwkWaterfoWaterfoWaterfoWaterford Woodrd Woodrd WoodWoods s s ssOpen SpOpen SpOpen SpOpen Spaceaceacec5160City Barbeque5200655Metro 5Priam Capitol6199565 Three MetroPizzuti565Two MetroPriam Capitol545One MetroFarbman Group535Everhart495Metro South Farbman Group485Metro LakesOwnerMOAMOA500Hilton Garden5705725625Rock HillSmiley ParkTechmartBatesStakeholders Meetings to DateWhat We Heard(Stakeholder meetings April 2024)5180Pizzuti BlazerPizzutiParkway ProfessionalPlazaMillennium435Sonesta Suites420Polaris Dental/Fifth Third6255Graeter’s411(Max & Erma’s)Pat KellyMOA425Metro 5Priam Capital555Metro 1Crawford Hoying525Metro 2Gladstone475Metro 3Strategic Systems600DoubleTree450Extended Stay America4006275Chase Bank12 | Metro Center Revitalization What We Heard(Stakeholder meetings April 2024)Land Uses•Provide a mix of uses: add residential, food/beverage, health/rec, personal care•Office demand is currently low – but with signs ofrecovery•Retail needs to be visible and accessible•Office-to-Residential conversions are impracticalParking•Parking is critical – availability is a big part ofMetro Center’s current appeal vs. other locations•Work-from-Home hasn’t significantly reducedparking needs•Structured parking is less feasible withcurrent interest ratesMobility•Create a street grid within Metro Center•I-270 crossing would be very expensive•Frantz Rd. needs a road dietPublic realm / Stormwater•Overhaul MOA•Existing detention ponds need improvement andmaintenanceImplementation•“We want to fit in – we’re open to change”;Owners concerned about impacts on theirproperties, but want to be good partners:•Phasing and timeline are important forinvestor confidence13 | Metro Center Revitalization• DUBLIN CONTEXT• PRODUCT TYPE TRENDS• STRATEGIC RECOMMENDATIONSMARKET ANALYSIS14 | Metro Center RevitalizationOffice space accounts for three-quarters of total Metro Center rentable building area15 | Metro Center Revitalization16 | Metro Center Revitalization 17 | Metro Center Revitalization18 | Metro Center Revitalization19 | Metro Center RevitalizationHousing Study & Strategy, City of Dublin, OH, March 2023This projection reflects Dublin within Franklin, Union, and Delaware Counties. 20 | Metro Center Revitalization 21 | Metro Center Revitalization22 | Metro Center Revitalization23 | Metro Center RevitalizationEd Square Shopping CenterAustraliaSiam Outlets BangkokWire Park Athens, GAShelter Brewery Australia24 | Metro Center Revitalization 25 | Metro Center RevitalizationWashington University 560 GarageSt.LouisBreteniere Technology ParkBurgundy, FranceNew York Botanical Garden GarageWestfield Carousel Parking Garage Australia26 | Metro Center Revitalization Lead with high quality retail Create a sense of place Increase the residential base with multi-family Follow rental with for-sale housing Explore missing middle / creative office typologies27 | Metro Center Revitalization• REGIONAL CONNECTIVITY• I-270 CROSSING OPTIONS• BLAZER PARKWAY • SIGNATURE TRAILTRANSPORTATION AND STORMWATER ANALYSIS28 | Metro Center Revitalization Service CenterOU CampusSports OhioOSU Medical CenterDublin Methodist HospitalHistoric DublinOCLCDublin VillageEmerald Parkway for US 33Shier Rings RdCSX Tr ans port atio n, I nc. Rail LineUnion CountyMadison CountyMuirfield DrCosgray R d Frantz Rd257161270 333333270Potential CrossingsGap in University BoulevardExisting University/Shier Rings CorridorPotential I-270 Crossing• Improve reliability thoroughfare network, provide redundancy• Strengthen connection to growing Union County Corridor• Create local connection to important districts and destinations within Dublin• Potential BRT corridorPotential Bus Transit StopBridge ParkMetro CenterFuture Passenger Rail Station29 | Metro Center RevitalizationI-270 crossing options(Memo March 11, 2024)4 alignments reviewedOption 1: Shier Rings Road to Metro Place NorthOption 2: Shier Rings Road to Metro Place SouthOption 3: Innovation Drive to Blazer ParkwayOption 4: Shier Rings Road to Metro Place South (avoiding 655 Metro Place)Max Height over I-270Skew to I-270Max SpanBridge LengthMax Grade37'Û135'365'7%126'Û110'300'5%224'Û95'250'5%326'Û115'320'5%41234Conclusions:• Connecting to Metro Place North is undesirable due tograde, length ($$$) and alignment with Corbins Mill Drive.• Innovation Drive connection does not create desired directconnection to West Innovation District.• The optimal connection is #4, Shier Rings Road to Metro PlaceSouth, avoiding 655 Metro Place.• This is a potential long-term connection; plan now to preserve futureopportunity.27033FrantaFrantFrantz FraFFraFraaFrantFrFFFranFaFFraFrantzFraFraFranFFrantFranFrantzFraFFFFFraFrantz FraFrantFFraFrantFrantzFFrantzFrantFrantFrFrFrantzFrantzFranFrrantzrantz ran zantz rantz rantzrantz rantzantz tzrranrantzrantzantzntzntzrantrarantz arantztntraarantz ntanntzntzantzntaaantntzanantznnnntznntnnntntz ntzttttztttttztztztztztzzz RdRdRdRdRRdRddRdRRdRdRdRRdRdRdRRdRRdRdRdRdRRRRRRddRdRdRRdRRRRdRRRRRdRdRdRdRdRRRRRRdRdRRdRRRRRdRdRdRdRdRdRdRdRdRdRdRdRddddddddddddddddddddddddMetro PMetro PMetro PMetro PMetro PMMetro PPMetro Metro PMetro PMetrroMMeoroMetMeolace Nlace lace Nlace Nlace Nlaclace Ncelace Nlacce Nlace Ne NacNNeNNNeNMMetro Metro PMetro PMetrMetro PMetro PMetro PMetro etro Petro PMetro PMetroetro PtrorroPlace Slace Slace Sace Slace Sace Sce Sace Sce Se Se Se SSSlace SSSSSSInnovatInnovatInnovatInnovatvaovavatvaInnovatvation Drioion Dr.ion Dr.ion Dion Dr.ion Dr.ion Dr.on Dr.on Donion Dr.on DrionDrDDrDrShier RShier RShier RShier RSShier RShier RSShier RShier RShier RShier RieShier Reings Rdings Rdings Rdngs Rdngs Rdngs ings Rds Rds Rdings Rdings Rdngs RdsRdings Rdns RdRRd.....BlazerPkwy0 1/4 mi500’ 1000’30 | Metro Center RevitalizationBlazer Parkway connection3 alignments shown in design scenariosWest: Shier Rings Road to Metro Place NorthEast: Shier Rings Road to Metro Place SouthMid: Innovation Drive to Blazer ParkwayObservations:• Connections to Blazer Parkway will provide alternate route toFrantz Road in all options.• Connections could happen prior to I-270 crossing depending onparcel impacts / cooperation from parcel owners.• Pizzuti parcel and subsequent development impacted as well asother parcels.• Connection to Upper Metro Place Road may enhanceconnectivity.• Blazer Parkway connection can be a complete street withgenerous bike/pedestrian accommodations.West27033BlazerPkwyFrantzFraFrantntzanFranFrantzFranFrantzFraFraFrantFraFFaFFraFFFranFraFrantzFFFrFraFraFFrantzFrantzFFFFraFraFranFrantzFaFraFrFrFzzrantzFrantFrFrFrarantzFrantz FrantzFrantFantzantzantzzanrantzranrantrantz antzantzntzntrantzrantzrarantzrantzntntraraarantantntzaaantzntzantzantz ntzantzzaaanaannznanntz ntzztznnntntntzntntzntzntntttztttztztztzzzzzzz RdRRdRdRRRdRdRdRRRdRdRRdRdRdRdRdRdRRRdRRdRRdRddRdRRddRdRdRRRddRRdRRRRdRdRRRdRRRRRRRRdRRRdRdRdRdRdRdRdRdRdRdRddddddddddddddddddddddddddddd Metro PMMetro PMetro PMetro PMetro PMetro PMetro Metro PMetro PPMetro PeMetroMMeooMetMeolace Nlace Nlacelaclace Nlace Nace NNe Naceace NNlaceNNNNNNNNMetro PMMetro PMetroMetro PMetro PMetro PMetro PMetro PoPMetro PMetroMetro PMrrooace Slace Slace Sace Sace Sce Slace Slace Sce e Se SSSeeSlace SSInnovatInnovatInnovatInnovatovaInnovatvatvatovavaion Dr.ioion Drion Dr.ion Dr.ion Dr.ion DDrion on Don Dr.ion Dr.on Drion DrionDrDrShier RShier RShier RShier RShier RShier RSShierhier Shier RShier RieShier RShier Reings Rdngsings Rdngs Rdngs Rdings Rdngs Rds Rds Rs RdsRdings Rdings Rdings Rdings RdRdRdR.....EastMid0 1/4 mi500’ 1000’31 | Metro Center RevitalizationSignature Trail3 alignments shown in design scenariosSouth: Majority of alignment along Cosgray RunNorth 1:Redirect to center of Metro Place loopNorth 2: Redirect to center of Metro Place loopObservations:• Connection across I-270 can be either below (tunnel) or above(ped/bike bridge). Each will be evaluated for feasibility and costimplications.• A connection at the I-270 crossing is feasible; it can beconstructed simultaneously with the bridge.• Connections can be made either to Corbin Mills Drive or to theeasement south of Dublin Plaza Shopping Center.• The Signature Trail should provide a variety of experiences, bothurban and natural.27033BlazerPkwyFrantaFrantntzFrantzFraFranFraFrantaFraFraFFFraFrFFrantFraFraFFraFranFraFraFFFrantFrantFFrantzFFFFraFrantzFrantFranFFraFrFraFranFrantzFrFrFFranFrFrantzFrFrantzntzFrantz FrantzFrFrFrantzantzantzrantzrantzantzrantz antzrantz rantzraatztnrarantzaantzantz tnaaantntantzaaantntzaantaantnzantznnantznntznnnzntntz ntntzntntznntznttttttttztztzzzzzz RdRdRdRRdRdRddRdRRdRdRRdRdRRRdRdRdRdRdRdRRRRRdddRdRdRRRRRRdRdRdRRRRdRRRdRdRRdRRdRRRRRRRRRRddRdRdRdRdRdRdRdRdRdRdRdRddddddddddddddddddddddddddMetro PMetro PMetro PMetro PMetro PMMetro PPMetro Metro PMetro PMetrroMMeoeoMetMeoolace Nlace Nlace Nlacelaclace Nlace Nlace Nce Ncelaclace Ne NacNNeNNNeNMetro PMetrMetro PMetMeMetro PetMetro PMetro PMtro PPPMetro PoPPPlace Slace Slaclace Sace Slace Sace Sce Slace Sace Sllace SaceeSle SllalSSInnovatInnovatInnovatInnovatovaInnovatvatvatvaovaion Dr.ioion Drion Dr.ion Dr.ion Dr.ion Dion Dr.onon Dion Dr.Dron Dr.ion DrionDrDrShier RShier Shier RShier RSShier RShier RSShier RShier RShier RShier RieShier Reings Rdngs ings Rngs Rdngs Rdings Rds Rds RdsRdings Rds Rdings Rdnngs Rdings Rdings RdRRd.....SouthNorth 1North 20 1/4 mi500’ 1000’32 | Metro Center Revitalization Regional Lake managed by MOA Managed in Individual ParcelsHybrid Solution integrated into Site Landscape StrategySystems Approach100% Metro Owners’ Association (MOA)0% Individual Landowners0% MOA100% Individual Landowners33% City of Dublin33% Individual Landowners33% Green Infrastructure33 | Metro Center RevitalizationTRANSFORMING METRO CENTERRedefine the Identity & Shape A Unique Sense of PlaceRebalance the DistrictReprioritize Mobility & Strengthen ConnectivityReimagine Water Systems & Create Purposeful Open Spaces34 | Metro Center RevitalizationGreen Grid Blue MeanderCentral ParkDesign AlternativesTwo landscaped stormwater corridors connect stormwater ponds along Metro Place North to Cosgray Run. Each corridor provides ecological value as well as amenities for adjacent uses within an overall grid system of street and blocks. Stormwater detention is consolidated into a larger community scaled Central Park along Metro Place North. Anchoring the view across this park from Frantz Road, a major cultural amenity pulls visitors deeper into the site. Green paths radiate out from this park, connecting south to Cosgray Run and east to Frantz Road. Blue Meander centers a dynamic open space and stormwater corridor that winds through the Metro Place Loop to create an ever changing series of vistas. The central greenspace is bordered by cultural, retail, residential, and office uses to create a varied and ever-changing experience. 35 | Metro Center RevitalizationExisting Condition27027033Cosgray RunSmiley ParkCorbins Mill DrInnovation DrMetro Place NShier Rings RdUpper Metro PlFrantz RdFrantz RdBlazer PkwyEmerald PkwyMetro Place S36 | Metro Center Revitalization Green GridSignature Trail27027033Cosgray RunSmiley ParkCorbins Mill DrInnovation DrMetro Place NShier Rings RdUpper Metro PlFrantz RdFrantz RdBlazer PkwyEmerald PkwyMetro Place S37 | Metro Center Revitalization100/150 Hooper Street San Francisco, CADongguan Longwan Ecological Wetland ParkChinaMission Bay P3San Franciso, CACroftfield Stormwater WetlandAuckland, New Zealand38 | Metro Center RevitalizationSignature Trail27027033Cosgray RunSmiley ParkCorbins Mill DrInnovation DrMetro Place NShier Rings RdUpper Metro PlFrantz RdFrantz RdBlazer PkwyEmerald PkwyMetro Place SMajor ConnectionsGreen Grid39 | Metro Center RevitalizationDevelopment MetricsGreen Grid500,000Hotel Retail Residential1,000,0001,500,0002,000,0002,500,0003,000,0003,500,000Existing 1.25 Msf .9 Msf .05 Msf 0 02.25 MsfProposed 1.3 Msf .8 Msf .1 Msf .075 Msf 1.8 Msf1,200 units4.0 MsfCulturalTotalSurface Parking RemovedExisting Surface Parking 7,500 spaces –2,500 spaces +5,500 spaces10,500 spacesProposed Structured Parking Total On Site Parking OfficePotential future units40 | Metro Center Revitalization Green Grid41 | Metro Center RevitalizationFrantz Rd Frontage• Minimal displacement of existingbuildings• Renovation of existing stormwater ponds• Replacement of surface parking withstructured parking• New cultural use /amphitheaterGreen GridCatalytic Sites [Opt 1]MOA 1495485425475420Graeter’s411MOA 2Metro PMetro PMetro Metro PMetro PMetro PtMetroroMetro PMetro Petro Petro PMetro Place Nlace Nlacelace NNaNce Nce Nlace Nlace Nace Nace NNNlacelace Nlace Nlace NNcMMMtr PetrPtro PMetro PMetro PMetro PMetro PMMetro PMetro PMetMMttro PMetro PMetro Petro PMetro PMetro PMetro PMetro PrMetro Pro PPPPPPlallace Slace Slace Slace SlaceSllace Slace Sacelace SeSe SSMOA 1495485425475420Graeter’s411MOA 2Metro PMetro PMetro PMetro PMetro Metro PtMetroMetroPMetro PMetro PMetro PMetro Petro PPlace Nlace NNaceeNalace Nlace Nace Nlace Nce Nace Nelace Nlace lace Nlace NeNNlae Metro PMMetro PoPetro PPPMetro PMetro PMetro PMetetro PttMetro PMetro PMetro PMetro PMetro PMetro PMetro PoPMetro Petro PPPPPPPPPPPPlalalaaalacllaaccace Sllaaaaaaccelace Slace Sllace Slaacelace Sc42 | Metro Center RevitalizationDRAFTPizzuti-Blazer/Metro Place S Parcels• Minimal displacement of existing buildings(only 535)• Stormwater management to be providedthrough on-site underground detention.• Flood hazard impact studies of newCosgray Run culverts required – mayrequire FEMA approval• Blazer Parkway connection as catalystGreen GridCatalytic Sites [Opt 2]565545Pizzuti–Blazer5160535PMetro PMetro Petetr PMetro PMetMetrMetro PMetro PMetro PetroMetro Pttro Place Slace Saac SSSlace Slacelace Slace SSSlace SSlace Sce SlacecBlazer Pkwy565545Pizzuti–Blazer5160535PMetro PMetro Ptro Metro PMetro Petr PMetro PMetro Petro Metro PMetro Place Slace Slace Slace SaSSlace SSlace SlacelaceSlace SSlace Sace SBlazer Pkwy43 | Metro Center RevitalizationDRAFTExisting Condition27027033Cosgray RunSmiley ParkCorbins Mill DrInnovation DrMetro Place NShier Rings RdUpper Metro PlFrantz RdFrantz RdBlazer PkwyEmerald PkwyMetro Place S44 | Metro Center Revitalization Central ParkSignature Trail27027033Cosgray RunSmiley ParkCorbins Mill DrInnovation DrMetro Place NShier Rings RdUpper Metro PlFrantz RdFrantz RdBlazer PkwyEmerald PkwyMetro Place S45 | Metro Center RevitalizationShelby Farms Nashville, TNBaotou Central Park, ChinaMaggie Dailey Park, Chicago, ILRiverfront Park Spokane, WAMaple Grove Central Park MN46 | Metro Center RevitalizationCentral ParkSignature Trail27027033Cosgray RunSmiley ParkCorbins Mill DrInnovation DrMetro Place NShier Rings RdUpper Metro PlFrantz RdFrantz RdBlazer PkwyEmerald PkwyMetro Place SMajor Connections47 | Metro Center RevitalizationCentral ParkDevelopment MetricsDevelopment MetricsHotel Retail ResidentialExisting 1.25 Msf .9 Msf .05 Msf 0 02.25 MsfProposed 1.3 Msf .8 Msf .1 Msf .075 Msf4.0 MsfCulturalTotalSurface Parking RemovedExisting Surface Parking 7,500 spaces –2,500 spaces+5,500 spaces10,500 spacesProposed Structured Parking Total On Site Parking Office500,0001,000,0001,500,0002,000,0002,500,0003,000,0003,500,0001.8 Msf1,200 unitsPotential future units48 | Metro Center RevitalizationDRAFT Central Parcels• Displacement of 2 existingbuildings• Creation of new stormwaterponds• Replacement of limited surfaceparking with structured parking• New cultural use/amphitheaterCentral ParkCatalytic SitesMOA 1555525425475MOA 1555525425475Metro PMetro PMMetro PMMetro PetroMetro PMetro PMetrMMetro PMetro PMetroMMetro PMetro PMetro PMMetro Place Nlace Nlace NeNNlace NceNlace Nce NNNllaace Nace Nace Nlace Nlace NeaceceNeMetro PMetetro Ptro PPPMetro PMetro PMetro PMMro PMetro PMetro PMetro PMetro PoPPMetro PMetro PMlace Slace Slace Slac SSlacacelace Slaace Slace Slace Slace SclaceeSSSSSlace SSSace SllSMetro PPMetMetro PMetro PMetro PMetro PMetro PMetro PPPMetro PMMetro PMetro PMetro Placecelace Nlace Nlace Nlace Nlace Nlace Nace Nace Nlace Nlace Nlace NeeacNcMetro PMetro PMetro PtMetro PMetro PMetro PMetro PMetro PtMetro ProMetro PMetro Proooolace Slace Slace Slace Slacce Slace Slace Selace Sace SSeMetro Place S49 | Metro Center RevitalizationDRAFTCentral Park50 | Metro Center RevitalizationDRAFTExisting Condition27027033Cosgray RunSmiley ParkCorbins Mill DrInnovation DrMetro Place NShier Rings RdUpper Metro PlFrantz RdFrantz RdBlazer PkwyEmerald PkwyMetro Place S51 | Metro Center RevitalizationBlue MeanderSignature Trail27027033Cosgray RunSmiley ParkCorbins Mill DrInnovation DrMetro Place NShier Rings RdUpper Metro PlFrantz RdFrantz RdBlazer PkwyEmerald PkwyMetro Place S52 | Metro Center Revitalization Sydney Fish Market AustraliaChiswick Park LondonSchinkle Islands AmsterdamRiver Lea Valley LondonNorth Hills Innovation DistrictRaleigh, NC53 | Metro Center RevitalizationBlue MeanderSignature Trail27027033Cosgray RunSmiley ParkCorbins Mill DrInnovation DrMetro Place NShier Rings RdUpper Metro PlFrantz RdFrantz RdBlazer PkwyEmerald PkwyMetro Place SMajor Connections54 | Metro Center RevitalizationBlue MeanderDevelopment MetricsDevelopment MetricsHotel Retail ResidentialExisting 1.25 Msf .9 Msf .05 Msf 0 02.25 MsfProposed 1.35 Msf .8 Msf .1 Msf .075 MsfCulturalTotalSurface Parking RemovedExisting Surface Parking 7,500 spaces –2,500 spaces +5,500 spaces10,500 spacesProposed Structured Parking Total On Site Parking Office500,0001,000,0001,500,0002,000,0002,500,0003,000,0003,500,0004.0 Msf1.8 Msf1,200 unitsPotential future units55 | Metro Center RevitalizationFrantz Rd Frontage / Inside the loop• Displacement of existing buildings• Creation of new stormwater ponds• Replacement of surface parking withstructured parkingBlue MeanderCatalytic Sites[Opt 1]Metro Metro PMetro PMetro PMetro PeMetro Metro PMetroMetro PMetro PMetro Place Nlace NeNlace Nlace Nace NeNNlaceNlace Nlace NeNlace Nlace Nlace Nlace eNNMetro PMetroMetro PMMMetro PPMetMetro Petro PMetro Petro PMetro PMetro PMetro PMetro PMetro PMetroMetro PMetro PMetro PMetro PPoace Slace SSlllace e Sllace Slace Slacelacelace Slace Sace ScMetro PMetro PMetro PMetro PMetro PMetro PMetro PMetretro PMetro PMetro PMetro PMetro PMeMlace Nlace Nace Nace Nlace NNlace Nlace NaceNlace NNNNlace Nlace NNMetro PMetro PMetro PMetro PMetr Ptro PMetro PMetro PMetroMetro PMetro Pro PMetro PMetro PMetroro PMetro Place Sclalalace Slace Scelace Slacelace Slace Slace Slace420Graeter411MOA 2420Graeter411MOA 256 | Metro Center RevitalizationDRAFT Frantz Rd Frontage / Inside the loop• Displacement of existing buildings• Creation of new stormwater ponds• Replacement of surface parking with structured parking• New cultural use /amphitheaterBlue MeanderCatalytic Sites[Opt 2]Metro PMetro PMMetro PMetro PMetro PMetro PeMetrotro PMetro PMetro PMetro PMetro PlaceaeNNeNNe Nace Nlace Nlace Nelace Nlace NeNlacelace Nlace Nace Nace NNaceMMMMetro Ptro PrPPoPMetro PMetro PoPMetro PMetrMMetMetro PMetMetro PMetro PMetro PMetro PtetMetro PMetro Ptro PMetro PMetroMeMetro PrPllllace Slace Slace Saalace ace Slace Slace Slace e SeSSMetro PMetro PMetro PeMetro PMetro PMetroPMetro PMetro PMetro PMetro PMetroMetro PoPlace Nlace Nlace Nlacelace NlaNlace Nlaclace Nace Nlacelace NeNlaceNcNace Nae Ne Ne NNcNNNMetro PMetro Petro PMetro PMetroMeMetro PMetro PMetro PMetro PMetroetro PMetroMMetroMetroMMetro Ptro PPMetro lace Slace Slace Slace Slace Slace Sacelace Slace Slace Sace SSSece Se e S425475420Graeter411MOA 2425475420Graeter411MOA 257 | Metro Center RevitalizationBlue Meander58 | Metro Center RevitalizationDRAFTFeasibility / ImplementationGreen GridBlue MeanderCentral Park• GSF and roadway/utility investment is roughly equivalent in all scenarios.• Catalyst sites along Frantz Road align with City Council recommendations andinput from stakeholders.• Scale of cultural buildings in catalyst sites is higher in Central Park and BlueMeander than in Green Grid, but could be phased over time.• Implications for stormwater investment vary for each alternative, dependingon the impact on, and current adequacy of, existing detention ponds; long-termoperation and maintenance costs; land values and associated opportunitycosts; and facility management structure.59 | Metro Center RevitalizationDRAFTDiscussionMarket Analysis• What is the best mix of residential uses with office and commercial?• What’s the best mix of housing types?• How best to achieve the proper mix of office in the future?Transportation & Stormwater• Is Council supportive of the preferred alignment of the I-270 crossing • What amenities would you like to see incorporated along the Blazer Parkway connection?• What experiences would like to see along the Signature Trail within Metro Center?General• Of the three, which scenario do you like best? Why?• Are there elements of other scenarios that you like and would bring into your favorite?• How do we prioritize public investment for components such as structured parking,reconfigured stormwater ponds, streets, public spaces, incentives for certain uses,building architecture, etc?60 | Metro Center RevitalizationDRAFT Next StepsMayMayMay61 | Metro Center Revitalization62 | Metro Center Revitalization• HYDROLOGY• SYSTEMS APPROACH: SHARED & INDIVIDUAL• SW MANAGEMENT CRITERIA• APPLICATIONS: PONDS, BELOW GROUND, GREENINFRASTRUCTURE• IMPLICATIONS FOR OPEN SPACESTORMWATER ANALYSIS63 | Metro Center RevitalizationDRAFT27033BlazerPkwyShamrocShamroShamrochamrochamrohamrocShamrocShamromrochamrocShamrochamrocShamrochhShamrocShamrocamrocShSShachamrocSSShhSSShhhhhhhhhSShhamrocSShhhckkkkkkkkkkkkkkkkkkkkkkkkkkkkSouth FSouthSouthSouth FSouth Fork orkork orkIndianIndianIndian IndiaIndiaRRunRunDubDublin Dublin Dublin Dublin ublinDublinDublinDublinDublinublinblinDubbDublinDublinDublinDubliuublinbbbbublinublin uubbbbbuubbbn ubb PlazPlazaPlazaPlazaazalazaPlazaazaPlazaPlazaaPlazazaazaaaPlaPlazaPPlazaPlaaaPlazaPPlazaPlazaPPazazzaaaaaPlazaPlazallaPlazaaaPlazaPlazalllaaaPPaazaaShoppinShoppinShoppinhoppinShoppinhoppinoppinoppinoppinppppinppShoppinoppioppinoppioppinShoppinnShoppinShoppinnnShohnhppng Centeg Centeg Ceng Centeg CenteCenteg Centeg Centeeng Ceng Centeg Centeg Ceng Centeg CenteentCentCententeenteg CentetnttteCeCCtCCCCCCeeeeenCCCCeeeeerrrrrrrrrrCosgrayCosgrayCosgraCosgrayosgrayCosgraysgrayosgrayosgrayCosgrayCosgrayCosgrayCosgrayCosgrayCosgrayC grayCosgraysgrayCCosgrayCosgraC sgrayCosgrayrysgraygrayosgrayCoCosgraosgragrayyaayyCosgrayosgraygRunRunRunRunRunRunRunRunRunRunRRunRRuuRunRRRunRunRunRunnRunnRunRunRunRunRunRunRRRMMontereMontereMontereMontereMontereMontereMontereMontereMonterMonterMontMontereonterentereny Dry Dry Dry Dry Dy Dry DDDyyyyMMetMetro PMetMetro PMetro PMetro PetMPtro Po PoPPtro PeMetro PMetMro Pettro ettroPtro Ptro Pooro PtrPPPlallacelaclaclacecellaceeccllacecelacelacelaceceacePost RdPost RostPostPost RdPost RdMMetr Pro Ptro PMetretro PMetro PMetro PMetretro Petro PPMetro PMetro PMetro Metro PMetro PPPPPPPPPPPPPPlaclacllllacelacelaclacelacecelacelacelaceShier RShier Rhier RShieShieings Rdings Rdgs RRings Rdngs RdWWWWWWaterWaterWaterWWWWateraatattttateateerWaterferfWaterfoWaterfoterfooWaterfWWaterWaaaatWateWaterWaterWateraterWaterffoterfoWWaaateWateterfoWWWaatterWatWateeWWWaterWaterfWWWaterWaataatWatertWWaterfWaterfWateWaterfaterterfoWWaerrfWWaterfWaterWaattefrdrdrdrdddddrdrdrdddddrdrdddrrrddrrdddddddrdd ViVillageVVill gVViVilVilVillagellagelageageageageillaVillagagillagegellagellageVillagelageVillageVillageVVViVilllageVillagVillagellagegellageVVViViVillageVilagelageagellagegegegeVViillageaageeVVVillallaeeVVVVigllageilgeeVillagVVillagageVillageVViViilllagaeViillillaThe BlaThe BlThe BlaThe BlaThe BlaThe BThe BlThe BlaThe BlaThe BlheBalllaThe BlaBeBBaTe BlaBBllaThe BlaBlallae BlaaBlallaeThe BlalaaBBlaaaBaaaaae zeeezezzerzer erzer zezzzezezzerzzzzerzzezeeer zzerzerzzzeerrrPlazPlazaPlazaPlPlaPlPlaPlazaPlazaazaazaazaazaazaazazazaaaaPlazaPlazazaPlaPPlaPlaPaaaazaaazaaDDDDDublin Duuuuublin inDublinDDDuDDinblinDuublinbDublinuubIndustrIIdtIndustndIndustrndustrdusndustustuusIndustIndusttrIndustrIndustrusttrrInusttrrrdtrrIIusInial Paial Parial Pial Paralal Parial Parial Parrrial Paral Parial Paial Parial ParrPParPPPPaial PaarPPPaPaial ParPPlial PParrkkkkkkkkkkkkkkkkUpper Upper ppepeperperperepeMetro PMMetro PMetro PMetro PMetro PMetro Petro Petro PoPetroMMMetMetro Petro Petro PetroMetro Pttro Petro ProMetro PMeMeMetroMttrtrMetro trMetrro PMetro rtroMlaclacellacelaceaceceacelcelaceeceelacelaceeelacaceFrantz Rd Frantz FFFFranantzFranFrantz FFFFFFFFraFrantzFrantz Frantz FFranFrFrantz Frantz Frantz FFrFrFFrantz FFranFraFrFrFrFrantzFrantFrantz FrFrFrFrantz antzFranFrraranranraaanarantranrantntzaantz aaanaaaanantz annntz ntz ntntntz ntntntntz nt z RdRdRRRdRdddRddRdRdRdRRdRdRddRdRdRRdRdRdRdRdRddddd BlBBlazer Blazer zezerBlazerBlazerBlazerzeBlazererBlazerlazer BlazrrreeeeerBlazerBlazerezzBlaazBlazerlazzzBlazerllBlaaazeraBlazeBllaBlazerBlazerBBBlazeBBlazezeBlazazzBBlBlakkwkwykwyykwyPkwyPkwyPkwyPkwywyyyPkwyPkwykwywwwkwwwwwywywywykwwkwyPkwykkPkwkwPkwyPkwyPkwPkwPkwPkkkkwkwPPPPPPkPkkwyPyyPkwykwywyPPPPkwyPkwykwywwyyywwwwwPkSmiley Park• Metro Place ponds are outdated in terms of design/function. They form an interconnected system. Impacts to one affect the whole chain of basins.• Northern area drains large ponds along Metro Place N. Southern area drains to Cosgray Run. Outlets flow under Frantz Road.• Concepts for stormwater modification will be developed based on the findings by EMH&T, which were presented to the Metro Center Visioning Advisory Committee contributing to the Dublin Corporate Area Plan.0.2% Annual Chance Flood HazardRegulatory Floodway1% Annual Chance Flood HazardStormwater PondsStorm FlowsHydrologySouSouth SouthSouth SoutSouSouSouthuthSouththoutForkForkForkForkForkForkForkFForkrkrIndiaIndiaIndiaIndiaIndiaIndiaIndiaIndiaIndiaIididiandn Run Run Run un n Runn Runn RununnunSewerSewerSewerSewer Sewer ewerewerewerSeweSewer SewerewereSheSSShShShShedhedhedSheddShedheCosgraCosgrasgCosgsgraCosgrasgraCosgraCosgraCCosCCy Sewey Sewey Sewy Sewy Sewey Sewey Sewey Sewey Sewey SewySewey Sewewewr Shedr ShedShedr ShShedShedr ShedShedher Shedr Shedr ShedShedShed64 | Metro Center Revitalization Pervious and Impervious Areas27033BlazerPkwySouth FSouth FSouth Fork ork ork IndianIndiaIndianRunununDDDuDDDublin Dublin DuDDuDDublinDDuDulibbububbbbPlazaPlazaPlaPlazalazaaPlazaPPlPlazalazaaaPPPlazaPlPPlazazaPlazaPPaPaShoppiShoppinoppinppg Centeg CenteCg CenteerCosgrayCosgrayCosgrayCosgrayCosgrayCosgrayCosgraygrayCosgrayCosgrayCosgCosgrayCosgraCCosgrayCgCoRunRunRunRunRunRunRunRunRunRunnRunuRunnuMontereMontereMontereMonterenterMontereMontereMonterey Dry DryDry Dry Dry DrDryDCorbinsCorbinsCorbinsCorbinsCorbinsbbinnMill DMill DMill DMill DMill DMill DrrrEdinburEdinburEdinburburEdinburEdinburEdinbuurgh Rdgh Rdgh Rdgh Rdgh Rdgh Rdgh RdMetro PMetro PMetro PMetro PMetro PMetro PMetro PlacelacelacelaceacelaclacacePost RdPPost Rdst Rdost RdRddPMetro PMetro PMetro PMetroMetro PMetro PMetro PPlacelacelaceacelaceacelacelacWaterfWaterWaterWaterWaterWaterWaterateaterfWaterfWateatterfoterfoWaterWaterfoterfoWWaterWaterWatertWateWaterfoWateWaWateraterfataterfaaterrWterattfWrfrdrdrrdddddrdddrddd drddd ddddVillagVillageVillageVillageVillVillageVillVillageVillageVillaVillageaVillagagVillageVillageillageVillagegeVillagellallageVillagegeillageVillageaaillagillagVillageVillaggegeeeegVVVgeegThe BlaThe BlaBlalallBlaallalalaaBlaalalaalaaaalazer zzzer zzzzPlazaPlazalazaazaazaaazazazazaaazaazazzaazaUpper UpperUppeMetro PMetro PMetro PMetro PMetro PMetro PMetro MetrMetro PMetro PMetro PMetro PMetro Petro Petro Pro PMetro PMMMeeeteetro PMetroMetro PPMetrMetro PMetro PMeetrorroMetrMeMetroetro Ptro PePPProlacelacelacaceaceacaceaccaceacclacacaclaaclaacclFrantz Rd Frantz Frantz Frantz antzFrantzFFrantFrantFrantz Frantz FrantzFrantz FFFFrantzFaaFrantzFrantz FrantztzFrantz F a n t z Frantz FrantFrranat z RdRdRdRdRdRdRRdRdRRdRdRdRdRdRdRdRdRdRdRRdRdddddd azeBlazeBlazeBlazerazerrrrBlazer BlazeeBlazeeererBlazer razBlazer BlazeBlazeBlazer zzBlazer Blazerazlazer zzzllaaaBlazerBlBlaBlazerazerBlazerBlazerBlazerBBBBBBlazeBlazeBlazezeBBazBlazzzazaBlalaBlBPkwkwkPkwyykwyPkwyPkwyPkkwyywywyPkwyPkwyPkwyyPkwyPkwykwykwPkwPkwkwywywyPkwyPkwyPkwwkkkwPkwyPPPPkwPkwyPkkPkwPkwyyPPPkPkwykwyPkwykwyPPPwkwyPkwykPkwPkwPkkPkPkSmiley ParkPervious77 acBuildingsPavementImpervious94 ac44% 45%11%• 39 acres (18%) of the Metro Center total site area is undeveloped land. • The pie chart below shows pervious/impervious areas within the developed area (net 170 acres).Undeveloped Undeveloped LandLandUndeveloped LandTotal Area: 209 acNet Total Area: 170 ac170 ac399 ac39 ac65 | Metro Center RevitalizationApplicationsBest practices • Regional detention (wet basins) will be applied to provide a majority of the stormwater management for the redevelopment area.• Retention/detention basins not recommended for individual development sites.• On-site detention would be mostly underground detention.• Has the Blue Roof application been used elsewhere in the City?• Stormwater Control Measures integrated into the roadways would be part of a treatment train to provide water quality and protect the downstream regional detention basins.• Permeable pavement in on-street parking lanes/parking stalls.• Tree boxes/rain gardens within sidewalk areas.Monash University AustraliaFirst Avenue Water PlazaNew York, NYSaint Jacques Ecological Park FranceNorth Carolina Museum of Art66 | Metro Center RevitalizationShelby Farms Nashville, TNImplications for Public RealmBest practices • Maximize recreational opportunitiesaround stormwater features• Create educational opportunities withinthe stormwater and open space system• Showcase goals from the DublinSustainability Plan• Design stormwater features and openspace to increase habitat biodiversityacross the site• Create a variety of scales andexperiences along the waterShelby Farms Nashville, TN100/150 Hooper Street San Francisco, CAChiswick Park LondonThalie Park France67 | Metro Center RevitalizationDRAFT