Loading...
HomeMy WebLinkAboutResolution 40-24RECORD OF RESOLUTIONS BARRETT BROTHERS - DAYTON, OHIO Form 6301 40-24 Resolution No. Passed ; ACCEPTING THE LOWEST AND BEST BID FOR THE CORAZON PEDESTRIAN BRIDGE REPLACEMENT PROJECT (23-024-CIP) WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Revised Dublin Charter and Chapter 37 of the Dublin Code, for the Corazon Pedestrian Bridge Replacement Project (23-024-CIP); and WHEREAS, Council has determined that the bid submitted by Axis Civil Construction LLC on July 24, 2024, constitutes the lowest and best bid. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, Delaware, Franklin and Union Counties, State of Ohio 7 __ of its elected members concurring, that: Section 1. The bid submitted by Axis Civil Construction LLC in the total amount of $215,846.50 is hereby accepted. Section 2. The City Manager is hereby authorized to enter into a contract with Axis Civil Construction LLC for the performance and completion of the Corazon Pedestrian Bridge Replacement Project (23-024-CIP) pursuant to the Advertisement, Proposal and Contract Documents for said Project on file in the office of the City Engineer. Section 3. This Council further hereby authorizes and directs the City Manager, the Director of Law, the Director of Finance, the Clerk of Council, or other appropriate officers of the City to prepare and sign all other agreements and instruments and to take any other actions as may be necessary to implement this Resolution and complete the work for this Project. Section 4. This Resolution shall take effect upon passage in accordance with Section 4.04(a) of the Revised Dublin Charter. Passed this 12 day of August, 2024. OL G- SB Mayor - Presiding Officer To: Members of Dublin City Council From: Megan D. O’Callaghan, P.E., City Manager Date: August 6, 2024 Initiated By: Paul A. Hammersmith, P.E., Director of Engineering/City Engineer Brian D. Gable, P.E., Director - Capital Projects Jared A. Groves, P.E., Civil Engineer II Re: Resolution 40-24 – Accepting the Lowest and Best Bid for the Corazon Pedestrian Bridge Replacement Project (23-024-CIP) Summary On July 24, 2024, six (6) bids were received and publicly opened for the Corazon Pedestrian Bridge Replacement Project, 23-024-CIP (Project). The Project will replace an existing timber bridge and timber abutments with a pre-fabricated pedestrian bridge and concrete abutments. This Project will also replace a portion of the shared use path leading to the pedestrian bridge from Tuscany Drive. Please see the attached Project Location Map for reference. The budgeted funds for the Corazon Pedestrian Bridge Replacement Project in the 2024-2028 Capital Improvements Program (CIP) are $150,000 from account BC24M04. The engineer’s estimate for this Project is $245,000. The increased cost for the Project resulted from adding the replacement of the shared use path leading to the pedestrian bridge which was also scheduled for normal maintenance in 2024. Engineering has consulted with Finance, and staff anticipates being able to cover the additional project cost using other unencumbered budgeted funds in the CIP. Axis Civil Construction LLC submitted the lowest and best bid of $215,846.50. Staff has reviewed all bids and a summary of the bids received is listed below. Bidder Bid as Read Bid as Read Corrected Bid Over (+) or Under (-) Engineer’s Estimate Axis Civil Construction LLC $215,846.50 - 11.9% N/A V3 Construction Group, Ltd. $237,500.00 - 3.06% N/A Ohio Concrete Maintenance LLC $239,757.50 - 2.14% N/A George J. Igel & Co., Inc. $247,192.70 + 0.89% N/A Eagle Bridge Co. $250,882.50 + 2.40% N/A Double Z Construction Company $268,182.28 + 9.46% N/A The material lead time for the pedestrian bridge structure will necessitate the Project work to be performed in 2025. The work for this Project is expected to commence in April 2025 and be completed by June 2025. Office of the City Manager 5555 Perimeter Drive • Dublin, OH 43017-1090 Phone: 614.410.4400 • Fax: 614-410-4490 Memo Resolution 40-24 – Accepting the Lowest and Best Bid for the Corazon Pedestrian Bridge Replacement Project (23-024-CIP) August 6, 2024 Page 2 of 2 The typical and customary communication methods will be used to convey construction information with the adjacent property owners and residents throughout the duration of this work. Pedestrian detour signage will be posted while the path is inaccessible. The City will have a designated Engineering Project Inspector assigned to the work for this Project who will provide coordination, be available to answer any questions, and manage access needs throughout the performance of the work. Recommendation Staff has thoroughly reviewed the bid submitted by Axis Civil Construction LLC. Previous experience with Axis Civil Construction has been favorable, most recently on the 2021 Vehicular Bridge Maintenance – Shawan Falls Project (21-011-CIP). Staff is confident that Axis Civil Construction LLC will do well performing the work for this Project. Staff recommends Council approve Resolution 40-24 accepting as lowest and best the bid of Axis Civil Construction LLC in the amount of $215,846.50 and authorizing the City Manager to enter into a contract with Axis Civil Construction LLC for this Project. Location Map CORAZON PEDESTRIAN BRIDGE REPLACEMENT PROJECT (22-024-CIP) ENGINEERING AUGUST 12, 2024 PROJECT OVERVIEW