HomeMy WebLinkAboutResolution 63-23RECORD OF RESOLUTIONS GOVERNMENT FORMS & SUPPLIES 844-224-3338 FORM NO. 30045 Resolution No. 63-25 Passed , 20 ACCEPTING THE LOWEST AND BEST BID FOR THE RIVERSIDE CROSSING PARK EAST RIVER ACCESS TRAIL PROJECT WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Revised Charter, for the Riverside Crossing Park East River Access Trail Project; and WHEREAS, Council has determined the base bid in the amount of $207,791.00 submitted by Five Seasons Landscape Management to be the lowest and best bid. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, State of Ohio, __{, _ of the elected members concurring, that: Section 1. The bid submitted by Five Seasons Landscape Management in the total amount of $207,791 is hereby accepted. Section 2. The City Manager is hereby authorized to enter into contracts with Five Seasons Landscape Management for the performance and completion of the Riverside Crossing Park East River Access Trail Project pursuant to the Advertisement, Proposal and Contract Documents for said Project on file in the Department of Parks and Recreation. Section 3. This Council further hereby authorizes and directs the City Manager, the Director of Law, the Director of Finance, the Clerk of Council, or other appropriate officers of the City to prepare and sign all other agreements and instruments and to take any other actions as may be necessary to implement this Resolution and complete the work for this Project. Section 4. This Resolution shall take effect and be in force upon passage in accordance with Section 4.04(a) of the Revised Charter. Passed this /|* day of _~ sp len byr _, 2023. Yor fl Mayor — Pr¢siding ‘Officer’ Attest: Lead, (Mul Clerk of Co ncil To: Members of Dublin City Council From: Megan D. O’Callaghan, P.E., City Manager Date: September 5, 2023 Initiated By: Matt Earman, Parks and Recreation Director Re: Resolution 63-23 – Accepting the Lowest and Best Bid for the Riverside Crossing Park East River Access Trail Project Summary On Thursday, August 17, 2023 two bids were opened for the Riverside Crossing Park East River Access Trail Project (Project). The Project includes all materials and labor necessary to install a limestone boulder stairway and a drainage channel from the shared use path leading to the Scioto River at Riverside Crossing Park. Attached is an overview map of the park with the general area where the work will occur for reference. The engineer’s estimate and budget for this project is $250,000. Staff received two bids, with the lowest bid received from Five Seasons Landscape Management in the amount of $207,791.00, which is 16.8 percent below the engineer’s estimate. The Project was initially funded in the 2021 Capital Improvements Plan (CIP) to follow the completion of Riverside Crossing Park; however, several complexities slowed the design process. These issues included integrating the design to the riverbank and existing stone bank bedding and providing multiple river flow models to ensure the river rise does not exceed allowable levels due to the Project. Recommendation Staff has thoroughly reviewed the Five Seasons Landscape Management bid and found it to be the lowest and best bid. References for this contractor were performed and found to be favorable. Staff has also reviewed the project schedule and found it to be acceptable for the scope and timing of the work to begin this fall Staff recommends approval of Resolution 63-23 authorizing the City Manager to enter into a construction contract with Five Seasons Landscape Management in the amount of $207,791. Office of the City Manager 5555 Perimeter Drive • Dublin, OH 43017-1090 Phone: 614-410-4400 • Fax: 614-410-4490 Bidder Bid as Read Bid as Read Over (+) or Under (-) Engineer’s Estimate Five Seasons Landscape Management $207,791.00 -16.8% Ironsite, Inc. $238,563.00 -4.5% Memo Riverside Crossing Park Eastern Trail Project Location Location –Riverside Crossing Park (East)