Loading...
HomeMy WebLinkAboutResolution 10-23 To: Members of Dublin City Council From: Megan D. O’ Callaghan, P.E., City Manager Date: January 24, 2023 Initiated By: Robert E. Ranc, Jr., Deputy City Manager Matt Earman, Director of Parks and Recreation Shawn Krawetzki, Landscape Architect Manager Re: Resolution 10-23 – Accepting the Lowest and Best Bid for the North Landscape Maintenance Contract and Authorizing the City Manager to Enter into a Contract for the Project Summary On Tuesday, December 12, 2022, two (2) bids were opened for the Dublin North Landscape Maintenance Contract. This contract provides maintenance of City owned properties and right-of- way areas within the City from U.S. 33 / Emerald Parkway North, excluding Muirfield. A map showing the City’s landscape maintenance coverage areas is attached for reference (Exhibit A). A summary of the bids received is shown in the table below. Bidder Bid Amount Bid as Read Over (+) or Under (-) Budget Pony Lawncare and Landscaping, LLC $305,000.00 - Withdrawn (-) 30% BrightView, Inc $389,761.00 (-) 11% Pony Lawncare and Landscaping, LLC (Pony Lawncare) was the initial low bidder; however, Pony Lawncare contacted the City within the required timeframe and requested to withdraw their bid due to an inaccurate understanding of the required scope. As a result, BrightView, Inc. (BrightView) was determined to be the lowest and best bid for the project. BrightView’s bid of $389,761.00 is 11 percent lower than the 2023 budgeted amount of $436,000 for this contract. Recommendation Staff has reviewed the bid submitted by BrightView, Inc. and determined it to be a complete and acceptable cost to perform the specified work for this project. BrightView has successfully executed this contract in previous years and is knowledgeable of the expected level of service and contract area. Staff has verified BrightView’s references and determined the references are satisfactory. Staff recommends adoption of Resolution 10-23, accepting the lowest and best bid for the North Landscape Maintenance Contract by BrightView, Inc. in the amount of $389,761.00 and authorizing the City Manager to enter into contract with BrightView, Inc. for this project. Office of the City Manager 5555 Perimeter Drive • Dublin, OH 43017-1090 Phone: 614.410.4400 • Fax: 614.410.4490 Memo