Loading...
HomeMy WebLinkAboutResolution 02-23 To: Members of Dublin City Council From: Megan D. O’Callaghan, P.E., City Manager Date: January 3, 2023 Initiated By: Robert E. Ranc, Jr., Deputy City Manager Paul A. Hammersmith, P.E., Director of Engineering/City Engineer Brian D. Gable, P.E., Deputy Director of Engineering – Design & Construction Chris W. Huber, P.E., Civil Engineer II Re: Resolution 02-23 – Authorizing the City Manager to Enter into a Letter of Agreement with Cogeco US (OH), LLC d/b/a Breezeline for the South High Street Utility Burial – Phase 1 Project (19-030-CIP) Background As part of the Downtown Historic District beautification efforts, the City will be relocating the existing overhead utility lines along South High Street through the South High Street Utility Burial - Phase 1 Project (Project) by installing underground electric (AEP) and telecommunication utilities (Spectrum, AT&T, Breezeline, and Dublink) to service the affected parcels. The Project consists of two phases as requested by AEP. The Phase 1 Project area includes Franklin Street south of West Bridge Street and the west side of South High Street between West Bridge Street and Short Street. The Phase 2 area includes the east side of South High Street and Blacksmith Lane between West Bridge Street and Short Street. A location map is provided on page two of this memo. At the completion of the Project, all overhead utility lines and poles along South High Street will be removed between West Bridge Street and Short Street. Presently, this Project is anticipated to be complete by the summer of 2023. The Phase 1 underground improvements are scheduled to be performed in advance of the Franklin Street Improvements Project, which includes road reconstruction, sidewalks, curb ramps, and street trees on Franklin Street between Sells Alley and Waterford Drive. Summary Beginning in 2019, and after the initial coordination with American Electric Power (AEP), City Staff has been coordinating extensively with Cogeco US (OH), LLC (Breezeline) to determine the scope of work and develop the construction drawings necessary to bury their existing overhead telecommunication facilities for the Project. As a part of this Project, through this Letter of Agreement, Breezeline will remove all existing overhead telecommunication facilities and install new underground telecommunication facilities (wires, cables, and connections) in the Phase 1 Project area. Breezeline will receive reimbursement from the City for the cost of removing the existing overhead facilities and installing the underground telecommunication facilities. The City’s underground telecommunication conduit contractor is responsible for installing the telecommunications conduit including all above ground items for the telecommunication utilities. The City is responsible for the difference in the total construction costs less Breezeline’s enhancement costs. Breezeline has not identified any specific enhancements at this time, but the letter of agreement ensures the City is not responsible for the cost of any enhancements Office of the City Manager 5555 Perimeter Drive • Dublin, OH 43017 Phone: 614.410.4400 Memo Memo re. Resolution 02-23 – Authorizing the City Manager to Enter into a Letter of Agreement with Cogeco US (OH), LLC d/b/a Breezeline for the South High Street Utility Burial – Phase 1 Project (19-030-CIP) January 3, 2023 Page 2 of 3 Breezeline may choose to install as part of their work on the Project. Therefore, the City is responsible for a cost of $37,548.38. The Project is funded in the 2022-2026 Capital Improvements Program (CIP) from the South High Street Utility Burial, Phase 1 (ET203) in the amount of $1.825 million and funded further through Ordinance 19-22 with an additional $2.32 million. In order to complete the burial of the utilities as part of the Project, including the telecommunication work, the following agreement will be brought forward for Council consideration at a future City Council meeting: • Funding agreement with Charter/Spectrum for the burial and installation of their infrastructure. The costs associated with that agreement is separate from the costs associated with this agreement. The cost and contractual language associated with that agreement is currently being finalized. Recommendation Staff recommends approval of Resolution 02-23, authorizing the City Manager to enter into a Letter of Agreement with Cogeco US (OH), LLC d/b/a Breezeline for the South High Street Utility Burial – Phase 1 Project. Memo re. Resolution 02-23 – Authorizing the City Manager to Enter into a Letter of Agreement with Cogeco US (OH), LLC d/b/a Breezeline for the South High Street Utility Burial – Phase 1 Project (19-030-CIP) January 3, 2023 Page 3 of 3 Project Location Map Letter of Agreement City of Dublin – South High Street Utility Burial – Phase 1 Project This Letter of Agreement is entered into as of this ___ day of _____, 2022 (the “Effective Date”), between the City of Dublin, Ohio, an Ohio municipal corporation whose tax mailing address is 5555 Perimeter Drive, Dublin, Ohio 43017 (“the City”) and Cogeco US (OH), LLC d/b/a Breezeline, Delaware limited liability company whose primary place of business is located at 3 Batterymarch Park, Suite 200, Quincy, Massachusetts 02169 (“Breezeline”). The City or Breezeline may be referred to herein as “Party” or collectively as “Parties.” Background Information  The City has worked with Breezeline to determine the scope of work and construction drawings to bury Breezeline’s existing overhead telecommunication facilities as part of the South High Street Utility Burial – Phase 1 Project (“the Project”).  As part of the Project, Breezeline is willing to remove all existing overhead telecommunication facilities and install new underground telecommunication facilities as set forth in the attached Exhibit A (the “Breezeline Work”)  Breezeline and/or its contractor will submit the Breezeline Work for any necessary permits with the City. The City will waive the permit fee for the Breezeline Work as it relates to the Project.  The City’s contractor is responsible for and shall install conduit, pedestals, hand holes, and service lateral conduit for the existing residential customers and the commercial services as depicted in the final construction drawings set forth in Exhibit C. Breezeline shall order and deliver to the construction site all pedestals, and hand holes to be installed by City’s contractor.  Breezeline understands and acknowledges that its facilities may be installed in a shared area with other telecommunication and utility facilities.  Breezeline is responsible for any costs beyond the cost of removing and burying existing facilities (e.g., any enhancements, additions, or upgrades to its facilities).  Breezeline is responsible for the supply installation and termination of all Breezeline’s telecommunication wires, cables, and connections for the Project.  The City is responsible for the work and costs for the Breezeline Work, as outlined above and as shown in the attached Exhibit B.  The Breezeline Work is estimated to be $37,548.38. Statement of Agreement The parties hereto acknowledge the accuracy of the above Background Information and agree as follows: 1. The Project: The City and Breezeline shall proceed with the Project pursuant to the plans and specifications included in Exhibit C. The City shall pay Breezeline the estimated costs of the Breezeline Work of $37,548.38 within 30 days of the execution of this Agreement. At the conclusion of the Project, the Parties shall ensure that the City has paid Breezeline the actual cost of the Breezeline Work. The Parties shall provide each other with invoices of the respective work within ten (10) days of completion of the project in order to determine the actual cost of the work. The Parties shall provide the other Party with written n otice of final, actual costs of the Breezeline Work within 30 days of the completion of the Project. Payment of these actual costs shall be made by each Party within 30 days of receipt of the written notice subject to the terms outlined in paragraph 7. 2. Notice. All notices given under this Agreement shall be in writing and delivered by (a) the United States Postal Service, certified mail, return receipt requested, postage prepaid; (b) personal delivery; (c) a nationally recognized overnight air courier service; or (d) scanned email or facsimile; in each case sent, delivered, emailed or faxed to the Parties as listed below. Each notice shall be deemed given upon the date sent. The lawyer for any Party is entitled to give notice under the terms hereof. Any Party may change at any time its notice address by delivering a change of address notice using the foregoing notice procedures. To Breezeline: Cogeco US (OH), LLC d/b/a Breezeline 3 Batterymarch Park, Suite 200 Quincy, Massachusetts 02169 legal@breezeline.com To the City: Megan D. O’Callaghan, City Manager 5555 Perimeter Drive Dublin, Ohio 43017 mocallaghan@dublin.oh.us With a copy to: Jennifer D. Readler Frost Brown Todd LLC 10 W Broad Street, Suite 2300 Columbus, Ohio 43215 jreadler@fbtlaw.com 3. Supervision of Contactors. The City shall supervise the City’s Contractors installing the conduit and equipment pursuant to the Project. Breezeline shall supervise the installation of the wires, cables and connections work. 4. Contractor Warranties. The City shall be responsible for obtaining any warranties with its Contractor for Breezeline Work. Breezeline shall be responsible for any warranties with regarding to the wires, cables and connections work. Breezeline will accept the City installed conduits prior to installing wiring and equipment. 5. Title to the Breezeline Work Facilities. Upon completion of the Project, Breezeline shall be the owner of the Breezeline telecommunication facilities installed as part of the Project, including all conduit, equipment, wires, cables and connections, and shall have the right to access, maintain, repair, replace and remove its telecommunication facilities. It will be Breezeline’s responsibility to ensure that any and all Contractors release any and all liens associated with the Project. 6. Indemnification. Breezeline agrees to indemnify, defend, and hold harmless the City from and against any and all losses, liabilities, claims and damages, costs and expenses (including reasonable attorneys’ fees and costs) arising from Breezeline’s work, construction, operation, maintenance, repair, and/or replacement of its facilities as part of the Project, unless caused by the City’s gross negligence or willful misconduct. Breezeline further agrees to cover the City’s fees and costs associated with the City’s efforts to release any liens associated with the Project should Breezeline fail to comply with the requirements in paragraph 5. 7. Cost Overruns. Final costs will be reviewed and agreed between the City and Breezeline for Project accounting. Any difference in final costs will be paid by the responsible party within thirty (30) days of agreed final Project accounting. Breezeline Ohio shall be responsible for cost increases over the agreed upon total unless changes are specifically for the Breezeline Work, which exclude Breezeline Enhancement’s. Changes to the City’s costs will only occur upon review and acceptance by the City in writing, executed by the parties hereto and as they make reference to this Letter of Agreement. 8. Jurisdiction. This Letter of Agreement shall be governed by the laws of Ohio. Any disputes arising herein shall be adjudicated at the Court of Common Pleas of Franklin County, Ohio. This Letter of Agreement is accepted by the parties hereto and executed as of the date set forth above. COGECO US (OH), LLC d/b/a BREEZELINE By: Title: CITY OF DUBLIN, OHIO By: Megan D. O’Callaghan Title: City Manager Approved as to Form: _____________________________ Jennifer D. Readler, Law Director Certificate of Availability of Funds PHASE 1SOUTH HIGH STREET UTILITY BURIAL 19-030 CIP PHASE 1 AREA BREEZELINE AGREEMENT - EXHIBIT A R/WR/WR/WR/WR/WR/WR/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/ W R/ W R/ W ⅊R/WShort Street (32' Wide)Inst. 195809110016062 - 3.5' StripInst. 195104230140030 - 20' StripInst. 197404220008250 - 33' for High Street Inst. 200909170135161 - 40' for High Street Elind Sells Addition to the Town of Dublin PB 1, PG 347 Inst. 201909260126205 - 33' for High Street Lot 1 Lot 2 Lot 10 Lot 7Lot 13 R/WR/WLot 6 Lot 5 Lot 4 Lot 2 Lot 3 Lot 1 Lot 135 ⅊ Elind Sells Addition to the Town of Dublin PB 1, PG 347 Sells Alley (16.5' Wide)Lot 7Lot 8 Lot 9 Lot 10 Lot 11 Lot 6 Lot 6 Lot 5 Lot 4 Lot 3 Lot 8 Lot 12 Lot 15 Lot 9Lot 11 Lot 14Lot 16 Lot 143 Lot 142Lot 141 Lot 140Lot 139 Lot 138 Lot 137Lot 136Lot 134Lot 3Lot 5 Lot 4 Lot 2 Lot 1 Lot 7 Lot 4 Lot 3 Lot 2 Lot 1 Lot 80 Lot 79 Spring Hill (16.5' Wide)Eberly Hill (16.5' Wide)Pinney Hill Lane (16.5' Wide)John Wright Lane (16.5' Wide)Waterford Drive(Width Varies)Franklin Street (50' Wide) Mill Lane (22' Wide)Davis Alley(27.5' Wide)Franklin Street (50' Wide)Franklin Street (66' Wide)West Bridge Street(OH-161) (US-33) (60' Wide)S. High Street (66' Wide)S. High Street (66' Wide)S. High Street (73' Wide) R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/WR/WCivic Addition PB 21, PG 27 Civic Addition PB 21, PG 27CivicAddition PB 21, PG 27 Civic AdditionPB 21, PG 27 Daniel Wright's Addition to DublinPB 21, PG 27Daniel Wright's Addition to Dublin PB 21, PG 27 Plat of Dublin PB 3, PG 199 Plat ofDublin PB 3, PG 199 Plat of Dublin PB 3, PG 199 Plat of Dublin PB 3, PG199The Historic Dublin OfficeCondominium CB 238, PG 69 Old Dublin Town Center II CB 182, PG 42 Bridge Street OfficeCondominium 41 Bridge Street CB 231, PG 1 Christian Bailey 171 Franklin StreetPID: 273-000145 Inst. 199605080115694 Christopher L. Miles 155 Franklin Street PID: 273-000173 Inst. 201206010077324 Hal Stuart Mueller 141 Franklin Street PID: 273-000140 Inst. 201507160096835 Daniel G. Emmenegger, Jr. 140 Franklin Street PID: 273-000142 Inst. 201411030145476Harry G. Hirth, Trustees 150 Franklin Street PID: 273-000120 Inst. 200605040084846 Evelyn H. Wirchainski, Trustees 160 Franklin Street PID: 273-000174 Inst. 200010130208849 Diana L. Tout 172 Franklin Street PID: 273-000172 Inst. 201106130073767 Timothy Bergwall 181 South High Street PID: 273-000083Inst. 201707060091892 Robert C. Karrer Jr., Trustee 167 South High Street PID: 273-000046Inst. 200207260183614 Eric Pickering Franklin StreetPID: 273-000135 Inst. 201412120165414 Village of Dublin129 South High Street PID: 273-000043 Inst. 196701130000508 U Crew Holdings LLC123 South High StreetPID: 273-002075Inst. 202009090133985Gemlaw Properties 109 South High Street PID: 273-000070 Inst. 201511020155169 91 S High St LLC91 South High StreetPID: 273-000104Inst. 201507230101032Hospel Holdings LLC87 South High StreetPID: 273-000005Inst. 200907170105163Philip S. Renaud II 83 South High Street PID: 273-000007 Inst. 201910170138370 63 South High LLC 63 South High StreetPID: 273-000092 Inst. 201811090153256 Stephanie Allespach, Trustee 55 South High Street PID: 273-000093 Inst. 201203140035252 Richard J. Toberen119 South High StreetPID: 273-000075Inst. 201805140063816DPG Properties III, LLC 75 South High Street PID: 273-000035 Inst. 201701100004667 Stephanie Allespach, Trustee South High Street PID: 273-000094 Inst. 201203140035252 City of Dublin 25 South High StreetPID: 273-000037 Inst. 198804050081481 City of Dublin27-29 South HighStreetPID: 273-000062Inst.198804050081481City of Dublin 25 South High Street PID: 273-009979Inst. 199902090034313 Old Dublin TC LLC 25 South High Street PID: 273-000022 Inst. 201808070105467 Rayne Schultheis 40-42 Franklin Street PID: 273-000109 Inst. 201410020130141 Dublin Bridge Street Firehouse Investments LLC 37 West Bridge Street PID: 273-000088 Inst. 201407010083570 Andrew Christensen 56 Franklin StreetPID: 273-000121 Civic Addition, Lot 1 Jeffrey P. Bolyard 60 Franklin StreetPID: 273-000123 Civic Addition, Lot 3 Alan P. Szuter 80 Franklin Street PID: 273-000125 Civic Addition, Lot 5 Andrew Wages, Trustee 86 Franklin Street PID: 273-000127 Civic Addition, Lot 7 Shannon Marie Crone 94 Franklin Street PID: 273-000129 Civic Addition, Lot 9Ruth Moffitt, Trustee 100 Franklin Street PID: 273-000131Civic Addition, Lot 11 Eric Pickering 126 Franklin Street PID: 273-000133 Inst. 200912080177310 Inst. 200912080177311 R/W R/W R/W R/W R/WR/WR/WJenkins Dublin LLC 6 South High Street PID: 273-000051 Inst. 200704020055964 37 Darby Co. Ltd. 14-18 South High Street PID: 273-000040 Inst. 200708020135136J & E Price LLC24 South High StreetPID: 273-000056Inst. 20151202016949822 South HighStreetPID: 273-000102BluebirdConsulting GroupLLC30 South HighStreetPID: 273-000008Inst.201710270151355BluebirdConsulting GroupLLC32 South HighStreetPID: 273-000089Inst.198211100105897Lucky Duck Investments32 South High StreetPID: 273-000072Inst. 201203140035264201203140035265, &201301160008627Lot 125Lot 124 Lot 123Lot 122Lot 121Lot 120Lot 119Lot 118Lot 117Lot 116 Spring Hill (16.5' Wide)Eberly Hill (16.5' Wide)Pinney Hill Lane(48' Wide)Providential Properties 48-52 South High Street PID: 273-000087 Inst. 20140502005389354S High LLC54 South High StreetPID: 273-000097Inst. 202008210123954South High StreetPID: 273-000259Karmi Capital LLC58 South High StreetPID: 273-000014Inst. 2020200814011935466 South High StreetPID: 273-000074Bavelis Family LLC 76-82 South High StreetPID: 273-000061 Inst. 201811280160756 Robert E. Benson86 South High StreetPID: 273-0000886Inst. 199207170153926Multiplex Realty LLC 90 South High StreetPID: 273-000052 Inst. 200711090194927 ODIG LTD106 South High Street PID: 273-001978 Inst. 199812020309694Allan D. Staub 114 South High Street PID: 273-000066Inst. 200003200053736 Whats the Point?126 South High Street PID: 273-000085 Inst. 200708220148032 M & D Partners LLC 138 South High StreetPID: 273-000063 Inst. 201908120100972 Deborah S. Steele South High Street PID: 273-013083 Inst. 201908120100974 Amy Elizabeth Bechert, Trustee 156 South HighStreet PID: 273-000066 Inst.202006090080379 Karen L. Strauss 158 South High Street PID: 273-000067 Inst. 201912180170226 Lot 1Lot 2Lot 3 R/WR/WR/WR/WR/WR/WR/W R/W R/W R/W E EEERyan Dammann 140 Waterford Drive PID: 273-000798 Inst. 201805290070416 Neil W. Mathias 162 Waterford Drive PID: 273-000801 Inst. 201009030115035 Joshua M. Manning 195 Franklin Street PID: 273-000800 Inst. 200503170049454 Pamela K. Mitchell 183 Franklin StreetPID: 273-000799 Inst. 199712260175611 Amy Jo Hall 123 Franklin Street PID: 273-000136Inst. 198707220151310 Pauline C. Johnson 105 Franklin Street PID: 273-000132 & 273-000134 Inst. 197009010018108 Arfan Midani95 Franklin Street PID: 273-000130 Inst. 201012010163117 Aaron J. Frank 85 Franklin Street PID: 273-000128 Inst. 200403010043758 Michael J. Streng 75Franklin StreetPID: 273-000126 Inst. 201406190077209 The Congregational Church of Dublin, Ohio Franklin StreetPID: 273-000113 Inst. 196008110014094 Davis Alley (27.5' Wide) (Vacated byOrd. 57-77)Davis Alley (27.5' Wide)(Vacated by Ord. 57-77)The Congregational Church of Dublin, Ohio Franklin Street PID: 273-000096Inst. 196008110014094 The Congregational Church of Dublin, Ohio Franklin Street PID: 273-000077 Inst. 196004120005679 8"San 8"San 8"San8"San 8"San 8"San8"San 8"San 8" S a n 8"San 8"San 8"San 8"San 8"San 8"San 8"San 8"San 8"San 8"San 8"San 8"San 8"San 8"San 8"San8"San8"San18"Stm12"Stm12"Stm 12"Stm 12"Stm 12"Stm12"Stm12"Stm12"S tm10"Stm8"Stm 8"Stm 8"Stm 8"Stm 12"Stm 1 2 " S tm 1 2 " S tm 18"Stm 18"Stm 18"Stm 12"Stm 12"Stm 18"Stm 15"Stm 12"Stm12"Stm18"Stm 18"Stm 6"Stm 12"Stm18"Stm18"Stm18"Stm 18"Stm 18"Stm 18"Stm6"Stm 12"Stm 8"Stm12"S tm 12"S tm 12"Stm12"Stm12"Stm 12"Stm 12"Stm12"St m 18"Stm18"Stm18"Stm12"Stm 12"Stm12"Stm1 2 "S tm 1 2 "S tm 12 " S t m 12 " S t m 18"Stm 18"Stm 12"Stm18"Stm 18"Stm 18"Stm 15"Stm15"Stm12"StmWWWWW WWWWW WWW W W W W W W W W W W W W W W W W W W WWWWWWWWW W W W W W W W W W W W W W W W W WWWW WWWW6"San6" S a n 6" S a nWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWR/WR/WEE2"G 2"G 2"G 2"G 2"G 2"G 2"G 2"G 2"G 2"G 2"G 2"G 2"G 2"G 2"G 2"G2"G2"G6"G6"G6"G6"G6"G6"G6"GGGGGEEEEE E E E E E E WGMill Lane (30' Wide) E E E E E E E E E E E E R/W R/W R/W R/W R/WArea Under Construction (Mud/Grass/Gravel) EE ACAC AC AC AC AC AC AC ACAC AC AC AC AC AC AC AC ACAC AC ACACAC ACACACACAC AC AC AC AC AC AC AC AC AC AC AC ACAC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC AC ACAC AC Mill Lane (22' Wide) City of Dublin, Ohio 34-36 Franklin Street PID: 273-000111 Inst. 20021120029725024"San24"San24"San48"Stm24"San48"Stm48"Stm24"Stm24"Stm 30"Stm30"Stm30"Stm30"Stm30"Stm30"Stm30"Stm30"Stm 30"Stm30"Stm30"Stm30"Stm 30"Stm24"Stm24"Stm24"Stm24"Stm24"Stm24"Stm12"StmE EEEEEEE E E E EE 12"Stm 12"StmWWWW6"Stm 4"Stm6"Stm 12"Stm12"Stm12"Stm4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"G4"G4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"GGGGGGG GGGGGGG⅊⅊⅊⅊⅊⅊ ⅊ ⅊ ⅊ ⅊⅊⅊⅊⅊⅊ ⅊⅊⅊⅊ ⅊⅊⅊⅊ ⅊⅊⅊ ⅊⅊⅊ ⅊⅊⅊ ⅊⅊⅊⅊ ⅊⅊⅊⅊⅊⅊⅊ ⅊⅊ ⅊ ⅊⅊ ⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊ ⅊⅊⅊⅊⅊ ⅊ ⅊⅊⅊⅊⅊⅊⅊⅊⅊ ⅊⅊ ⅊ Allan D. Staub 114 South HighStreet PID: 273-000066 Inst.200003200053736 ⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊ Lance Schneier 143 South High Street PID: 273-000015 Inst. 201912270173934 Elizabeth A. Whisler155 South High Street PID: 273-000106 Inst. 201210040149094 18"Stm U Crew Holdings LLC 113-115 South High StreetPID: 273-000034 Inst. 201310160175201John Wright Lane (16.5' Wide)Wa t e r f o r d D r i v e (Wi d t h V a r i e s ) ⅊ City of Dublin 225 S. High Street PID: 273-000143 Inst. 201003020024866 City of Dublin 225 S. High Street PID: 273-000143Inst. 200604130069277 John Begley & Lori Begley 6199 Dublin Road 81 Bridge Street 39 Bridge Street AC ACAC E AC E ⅊ G TTT T T T FO FO FOLTRM E E E EE E E E E E E E G G G M M M GV GV GV GV GV GV GV GV GV GV GV GV GV GV GV GV GV GV GV GV GV GV GVGV GV GV GV GV GV MB MB MB MB MB MB MB MB MB MB MB MB MB MB MB MB MB MB MB MB MB MB MB MBMB T T TTT T TTTT T TTT T TTT T TT TT T TT T TTT T T T T T TR TR TR TR TR TR TR TRWW M M MB TTT T TT TYRRELLSTOWNENTERPRISES31 South HighStreetPID: 273-012386TYRRELLSTOWNENTERPRISES33 South HighStreetPID: 273-01238731TT T T T T TTTT T T T TTT T TT T TTTTTTTTT T TTTT T T TTT T TT TTTTTTTTTTTTTTTTTTTT T TTEX UTILITY POLE SERVES141 UG & 123 OHDESIGNEDCHECKEDSOUTH HIGH STREET UTILITYBURIAL - PHASE 1 19-030CIP1MTS BMVAEP LETTER OF AGREEMENT EXHIBIT A1NOT TO SCALELEGEND PROPOSED EASEMENT PROPOSED TEMPORARY EASEMENT PROPOSED UNDERGROUND TELECOM. MAIN LINE PROPOSED UNDERGROUND ELECTRIC (AEP) PRIMARY SPECTRUM EQUIPMENT AT&T EQUIPMENT WOW EQUIPMENT DUBLINK EQUIPMENT PROPOSED UNDERGROUND TELECOM. SERVICE PROPOSED UNDERGROUND ELECTRIC SERVICE (AEP) T AT&T LETTER OF AGREEMENT - EXHIBIT ABREEZELINE LETTER OF AGREEMENT - EXHIBIT ALEGEND BREEZELINE PROJECT WORK ENHANCEMENTS BREEZELINE ENHANCEMENT MAP - EXHIBIT B SOUTH HIGH STREET UTILITY BURIAL 19-030 CIP PHASE 1 AREA W BRIDGE ST FRANKLIN STS HIGH STINDEX OF SHEETS TITLE SHEET......................................................................................................................................1 SCHEMATIC PLAN.............................................................................................................................2 GENERAL NOTES..............................................................................................................................3 GENERAL NOTES & LEGEND..........................................................................................................4 GENERAL SUMMARY........................................................................................................................5 JOINT-USE DETAILS......................................................................................................................6-7 TELECOMMUNICATION SECTIONS............................................................................................8-12 PLAN AND PROFILE (INCLUDING SUB-SUMMARIES)............................................................13-24 PED LOCATION DETAILS..........................................................................................................25-31 LANDSCAPE DETAILS...............................................................................................................32-37 LOCATION MAP SOUTH HIGH STREETUTILITY BURIAL - PHASE 1 19-030-CIP PORTIONS TO BE IMPROVED: STANDARD CONSTRUCTION DRAWINGS CITY OF DUBLIN CITY OF COLUMBUS ODOT NOT FOR CONSTRUCTION, 10/18/2022 PROJECT LOCATION 1 0 GRAPHIC SCALE SCALE IN FEET 500 1000 1500 SIGNATURES BELOW SIGNIFY CONCURRENCE WITH THE GENERAL PURPOSES AND GENERAL LOCATION OF THE PROJECT ONLY AND DO NOT CONSTITUTE ASSURANCE TO OPERATE AS INTENDED. ALL TECHNICAL DETAILS REMAIN THE RESPONSIBILITY OF THE PROFESSIONAL CIVIL ENGINEER PREPARING THE PLANS. DIRECTOR OF ENGINEERING/CITY ENGINEER CITY OF DUBLIN, OHIO PAUL A. HAMMERSMITH, P.E. DATE REGISTERED ENGINEER DATE APPROVED: 37 PROJECT INCLUDES RELOCATION OF OVERHEAD TELECOMMUNICATION UTILITIES IN THE DUBLIN AREA. EXISTING AERIAL FACILITIES WILL BE RELOCATED UNDERGROUND STARTING FROM SHORT STREET, WEST ON WATERFORD DRIVE, NORTH ON FRANKLIN STREET, SELLS ALLEY, MILL LANE, AND NORTH TO BRIDGE STREET. A JOINT-USER DUCT BANK WILL BE INSTALLED TO UNDERGROUND THE TELECOMMUNICATION UTILITIES. PROJECT DESCRIPTION THE CITY OF COLUMBUS CONSTRUCTION AND MATERIALS SPECIFICATIONS (CMSC), 2018 EDITION INCLUDING ALL REVISIONS AND SUPPLEMENTS IN EFFECT AT THE TIME OF SIGNATURE BY THE DIRECTOR OF PUBLIC SERVICE, SHALL GOVERN ALL CONSTRUCTION ITEMS THAT ARE A PART OF THIS PLAN UNLESS NOTED OTHERWISE. 2018 SPECIFICATIONS