HomeMy WebLinkAboutResolution 02-23
To: Members of Dublin City Council
From: Megan D. O’Callaghan, P.E., City Manager
Date: January 3, 2023
Initiated By: Robert E. Ranc, Jr., Deputy City Manager
Paul A. Hammersmith, P.E., Director of Engineering/City Engineer
Brian D. Gable, P.E., Deputy Director of Engineering – Design & Construction
Chris W. Huber, P.E., Civil Engineer II
Re: Resolution 02-23 – Authorizing the City Manager to Enter into a Letter of
Agreement with Cogeco US (OH), LLC d/b/a Breezeline for the South High
Street Utility Burial – Phase 1 Project (19-030-CIP)
Background
As part of the Downtown Historic District beautification efforts, the City will be relocating the
existing overhead utility lines along South High Street through the South High Street Utility Burial -
Phase 1 Project (Project) by installing underground electric (AEP) and telecommunication utilities
(Spectrum, AT&T, Breezeline, and Dublink) to service the affected parcels. The Project consists of
two phases as requested by AEP. The Phase 1 Project area includes Franklin Street south of West
Bridge Street and the west side of South High Street between West Bridge Street and Short Street.
The Phase 2 area includes the east side of South High Street and Blacksmith Lane between West
Bridge Street and Short Street. A location map is provided on page two of this memo. At the
completion of the Project, all overhead utility lines and poles along South High Street will be
removed between West Bridge Street and Short Street.
Presently, this Project is anticipated to be complete by the summer of 2023. The Phase 1
underground improvements are scheduled to be performed in advance of the Franklin Street
Improvements Project, which includes road reconstruction, sidewalks, curb ramps, and street trees
on Franklin Street between Sells Alley and Waterford Drive.
Summary
Beginning in 2019, and after the initial coordination with American Electric Power (AEP), City Staff
has been coordinating extensively with Cogeco US (OH), LLC (Breezeline) to determine the scope
of work and develop the construction drawings necessary to bury their existing overhead
telecommunication facilities for the Project. As a part of this Project, through this Letter of
Agreement, Breezeline will remove all existing overhead telecommunication facilities and install
new underground telecommunication facilities (wires, cables, and connections) in the Phase 1
Project area. Breezeline will receive reimbursement from the City for the cost of removing the
existing overhead facilities and installing the underground telecommunication facilities. The City’s
underground telecommunication conduit contractor is responsible for installing the
telecommunications conduit including all above ground items for the telecommunication utilities.
The City is responsible for the difference in the total construction costs less Breezeline’s
enhancement costs. Breezeline has not identified any specific enhancements at this time, but the
letter of agreement ensures the City is not responsible for the cost of any enhancements
Office of the City Manager
5555 Perimeter Drive • Dublin, OH 43017
Phone: 614.410.4400 Memo
Memo re. Resolution 02-23 – Authorizing the City Manager to Enter into a Letter of Agreement with Cogeco
US (OH), LLC d/b/a Breezeline for the South High Street Utility Burial – Phase 1 Project (19-030-CIP)
January 3, 2023
Page 2 of 3
Breezeline may choose to install as part of their work on the Project. Therefore, the City is
responsible for a cost of $37,548.38. The Project is funded in the 2022-2026 Capital Improvements
Program (CIP) from the South High Street Utility Burial, Phase 1 (ET203) in the amount of $1.825
million and funded further through Ordinance 19-22 with an additional $2.32 million.
In order to complete the burial of the utilities as part of the Project, including the
telecommunication work, the following agreement will be brought forward for Council
consideration at a future City Council meeting:
• Funding agreement with Charter/Spectrum for the burial and installation of their
infrastructure. The costs associated with that agreement is separate from the costs
associated with this agreement. The cost and contractual language associated with that
agreement is currently being finalized.
Recommendation
Staff recommends approval of Resolution 02-23, authorizing the City Manager to enter into a
Letter of Agreement with Cogeco US (OH), LLC d/b/a Breezeline for the South High Street Utility
Burial – Phase 1 Project.
Memo re. Resolution 02-23 – Authorizing the City Manager to Enter into a Letter of Agreement with Cogeco
US (OH), LLC d/b/a Breezeline for the South High Street Utility Burial – Phase 1 Project (19-030-CIP)
January 3, 2023
Page 3 of 3
Project Location Map
Letter of Agreement
City of Dublin – South High Street Utility Burial – Phase 1 Project
This Letter of Agreement is entered into as of this ___ day of _____, 2022 (the “Effective Date”),
between the City of Dublin, Ohio, an Ohio municipal corporation whose tax mailing address is 5555
Perimeter Drive, Dublin, Ohio 43017 (“the City”) and Cogeco US (OH), LLC d/b/a Breezeline,
Delaware limited liability company whose primary place of business is located at 3 Batterymarch Park,
Suite 200, Quincy, Massachusetts 02169 (“Breezeline”). The City or Breezeline may be referred to
herein as “Party” or collectively as “Parties.”
Background Information
The City has worked with Breezeline to determine the scope of work and construction
drawings to bury Breezeline’s existing overhead telecommunication facilities as part of the
South High Street Utility Burial – Phase 1 Project (“the Project”).
As part of the Project, Breezeline is willing to remove all existing overhead
telecommunication facilities and install new underground telecommunication facilities as set
forth in the attached Exhibit A (the “Breezeline Work”)
Breezeline and/or its contractor will submit the Breezeline Work for any necessary permits
with the City. The City will waive the permit fee for the Breezeline Work as it relates to the
Project.
The City’s contractor is responsible for and shall install conduit, pedestals, hand holes, and
service lateral conduit for the existing residential customers and the commercial services as
depicted in the final construction drawings set forth in Exhibit C. Breezeline shall order and
deliver to the construction site all pedestals, and hand holes to be installed by City’s
contractor.
Breezeline understands and acknowledges that its facilities may be installed in a shared area
with other telecommunication and utility facilities.
Breezeline is responsible for any costs beyond the cost of removing and burying existing
facilities (e.g., any enhancements, additions, or upgrades to its facilities).
Breezeline is responsible for the supply installation and termination of all Breezeline’s
telecommunication wires, cables, and connections for the Project.
The City is responsible for the work and costs for the Breezeline Work, as outlined above and
as shown in the attached Exhibit B.
The Breezeline Work is estimated to be $37,548.38.
Statement of Agreement
The parties hereto acknowledge the accuracy of the above Background Information and agree as
follows:
1. The Project: The City and Breezeline shall proceed with the Project pursuant to the plans and
specifications included in Exhibit C. The City shall pay Breezeline the estimated costs of the
Breezeline Work of $37,548.38 within 30 days of the execution of this Agreement. At the
conclusion of the Project, the Parties shall ensure that the City has paid Breezeline the actual cost
of the Breezeline Work. The Parties shall provide each other with invoices of the respective
work within ten (10) days of completion of the project in order to determine the actual cost of the
work. The Parties shall provide the other Party with written n otice of final, actual costs of the
Breezeline Work within 30 days of the completion of the Project. Payment of these actual costs
shall be made by each Party within 30 days of receipt of the written notice subject to the terms
outlined in paragraph 7.
2. Notice. All notices given under this Agreement shall be in writing and delivered by (a) the
United States Postal Service, certified mail, return receipt requested, postage prepaid; (b)
personal delivery; (c) a nationally recognized overnight air courier service; or (d) scanned email
or facsimile; in each case sent, delivered, emailed or faxed to the Parties as listed below. Each
notice shall be deemed given upon the date sent. The lawyer for any Party is entitled to give
notice under the terms hereof. Any Party may change at any time its notice address by delivering
a change of address notice using the foregoing notice procedures.
To Breezeline: Cogeco US (OH), LLC d/b/a Breezeline
3 Batterymarch Park, Suite 200
Quincy, Massachusetts 02169
legal@breezeline.com
To the City: Megan D. O’Callaghan, City Manager
5555 Perimeter Drive
Dublin, Ohio 43017
mocallaghan@dublin.oh.us
With a copy to: Jennifer D. Readler
Frost Brown Todd LLC
10 W Broad Street, Suite 2300
Columbus, Ohio 43215
jreadler@fbtlaw.com
3. Supervision of Contactors. The City shall supervise the City’s Contractors installing the conduit
and equipment pursuant to the Project. Breezeline shall supervise the installation of the wires,
cables and connections work.
4. Contractor Warranties. The City shall be responsible for obtaining any warranties with its
Contractor for Breezeline Work. Breezeline shall be responsible for any warranties with
regarding to the wires, cables and connections work. Breezeline will accept the City installed
conduits prior to installing wiring and equipment.
5. Title to the Breezeline Work Facilities. Upon completion of the Project, Breezeline shall be the
owner of the Breezeline telecommunication facilities installed as part of the Project, including all
conduit, equipment, wires, cables and connections, and shall have the right to access, maintain,
repair, replace and remove its telecommunication facilities. It will be Breezeline’s responsibility
to ensure that any and all Contractors release any and all liens associated with the Project.
6. Indemnification. Breezeline agrees to indemnify, defend, and hold harmless the City from and
against any and all losses, liabilities, claims and damages, costs and expenses (including
reasonable attorneys’ fees and costs) arising from Breezeline’s work, construction, operation,
maintenance, repair, and/or replacement of its facilities as part of the Project, unless caused by
the City’s gross negligence or willful misconduct. Breezeline further agrees to cover the City’s
fees and costs associated with the City’s efforts to release any liens associated with the Project
should Breezeline fail to comply with the requirements in paragraph 5.
7. Cost Overruns. Final costs will be reviewed and agreed between the City and Breezeline for
Project accounting. Any difference in final costs will be paid by the responsible party within
thirty (30) days of agreed final Project accounting. Breezeline Ohio shall be responsible for cost
increases over the agreed upon total unless changes are specifically for the Breezeline Work,
which exclude Breezeline Enhancement’s. Changes to the City’s costs will only occur upon
review and acceptance by the City in writing, executed by the parties hereto and as they make
reference to this Letter of Agreement.
8. Jurisdiction. This Letter of Agreement shall be governed by the laws of Ohio. Any disputes
arising herein shall be adjudicated at the Court of Common Pleas of Franklin County, Ohio.
This Letter of Agreement is accepted by the parties hereto and executed as of the date set forth
above.
COGECO US (OH), LLC d/b/a BREEZELINE
By:
Title:
CITY OF DUBLIN, OHIO
By:
Megan D. O’Callaghan
Title: City Manager
Approved as to Form:
_____________________________
Jennifer D. Readler, Law Director
Certificate of Availability of Funds
PHASE 1SOUTH HIGH STREET UTILITY BURIAL 19-030 CIP
PHASE 1 AREA
BREEZELINE AGREEMENT - EXHIBIT A
R/WR/WR/WR/WR/WR/WR/W
R/W
R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W R/W
R/
W
R/
W
R/
W
⅊R/WShort Street (32' Wide)Inst. 195809110016062 - 3.5' StripInst. 195104230140030 - 20' StripInst. 197404220008250 - 33' for High Street
Inst. 200909170135161 - 40' for High Street
Elind Sells Addition
to the Town of Dublin
PB 1, PG 347
Inst. 201909260126205 - 33' for High Street
Lot 1
Lot 2
Lot 10
Lot 7Lot 13
R/WR/WLot 6
Lot 5
Lot 4
Lot 2
Lot 3
Lot 1
Lot 135
⅊
Elind Sells Addition
to the Town of Dublin
PB 1, PG 347
Sells Alley (16.5' Wide)Lot 7Lot 8
Lot 9
Lot 10
Lot 11
Lot 6
Lot 6
Lot 5
Lot 4
Lot 3
Lot 8
Lot 12
Lot 15 Lot 9Lot 11
Lot 14Lot 16
Lot 143
Lot 142Lot 141
Lot 140Lot 139
Lot 138
Lot 137Lot 136Lot 134Lot 3Lot 5 Lot 4 Lot 2
Lot 1
Lot 7
Lot 4
Lot 3
Lot 2
Lot 1
Lot 80
Lot 79
Spring Hill (16.5' Wide)Eberly Hill (16.5' Wide)Pinney Hill Lane (16.5' Wide)John Wright Lane (16.5' Wide)Waterford Drive(Width Varies)Franklin Street (50' Wide)
Mill Lane (22' Wide)Davis Alley(27.5' Wide)Franklin Street (50' Wide)Franklin Street (66' Wide)West Bridge Street(OH-161) (US-33) (60' Wide)S. High Street (66' Wide)S. High Street (66' Wide)S. High Street (73' Wide)
R/W R/W R/W R/W R/W
R/W R/W
R/W R/W R/W R/W R/W
R/W R/W R/W R/W
R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W R/W R/W R/W R/W R/W R/W R/W R/W R/WR/WCivic Addition
PB 21, PG 27
Civic Addition
PB 21, PG 27CivicAddition
PB 21,
PG 27
Civic AdditionPB 21, PG 27
Daniel Wright's Addition
to DublinPB 21, PG 27Daniel Wright's Addition
to Dublin
PB 21, PG 27
Plat of Dublin
PB 3, PG 199
Plat ofDublin
PB 3, PG
199
Plat of Dublin
PB 3, PG 199
Plat of
Dublin
PB 3, PG199The Historic
Dublin OfficeCondominium
CB 238, PG
69
Old Dublin Town
Center II
CB 182, PG 42
Bridge Street OfficeCondominium
41 Bridge Street
CB 231, PG 1
Christian Bailey
171 Franklin StreetPID: 273-000145
Inst. 199605080115694
Christopher L. Miles
155 Franklin Street
PID: 273-000173
Inst. 201206010077324
Hal Stuart Mueller
141 Franklin Street
PID: 273-000140
Inst. 201507160096835
Daniel G. Emmenegger, Jr.
140 Franklin Street
PID: 273-000142
Inst. 201411030145476Harry G. Hirth, Trustees
150 Franklin Street
PID: 273-000120
Inst. 200605040084846
Evelyn H. Wirchainski, Trustees
160 Franklin Street
PID: 273-000174
Inst. 200010130208849
Diana L. Tout
172 Franklin Street
PID: 273-000172
Inst. 201106130073767
Timothy Bergwall
181 South High Street
PID: 273-000083Inst. 201707060091892
Robert C. Karrer Jr., Trustee
167 South High Street
PID: 273-000046Inst. 200207260183614
Eric Pickering
Franklin StreetPID: 273-000135
Inst. 201412120165414
Village of Dublin129 South High Street
PID: 273-000043
Inst. 196701130000508 U Crew Holdings LLC123 South High StreetPID: 273-002075Inst. 202009090133985Gemlaw Properties
109 South High Street
PID: 273-000070
Inst. 201511020155169 91 S High St LLC91 South High StreetPID: 273-000104Inst. 201507230101032Hospel Holdings LLC87 South High StreetPID: 273-000005Inst. 200907170105163Philip S. Renaud II
83 South High Street
PID: 273-000007
Inst. 201910170138370
63 South High LLC
63 South High StreetPID: 273-000092
Inst. 201811090153256
Stephanie Allespach, Trustee
55 South High Street
PID: 273-000093
Inst. 201203140035252
Richard J. Toberen119 South High StreetPID: 273-000075Inst. 201805140063816DPG Properties III, LLC
75 South High Street
PID: 273-000035
Inst. 201701100004667
Stephanie Allespach,
Trustee
South High Street
PID: 273-000094
Inst. 201203140035252
City of Dublin
25 South High StreetPID: 273-000037
Inst. 198804050081481
City of Dublin27-29 South HighStreetPID: 273-000062Inst.198804050081481City of Dublin
25 South High Street
PID: 273-009979Inst. 199902090034313
Old Dublin TC LLC
25 South High Street
PID: 273-000022
Inst. 201808070105467
Rayne Schultheis
40-42 Franklin Street
PID: 273-000109
Inst. 201410020130141
Dublin Bridge Street
Firehouse Investments LLC
37 West Bridge Street
PID: 273-000088
Inst. 201407010083570
Andrew Christensen
56 Franklin StreetPID: 273-000121
Civic Addition, Lot 1
Jeffrey P. Bolyard
60 Franklin StreetPID: 273-000123
Civic Addition, Lot 3
Alan P. Szuter
80 Franklin Street
PID: 273-000125
Civic Addition, Lot 5
Andrew Wages, Trustee
86 Franklin Street
PID: 273-000127
Civic Addition, Lot 7
Shannon Marie Crone
94 Franklin Street
PID: 273-000129
Civic Addition, Lot 9Ruth Moffitt, Trustee
100 Franklin Street
PID: 273-000131Civic Addition, Lot 11
Eric Pickering
126 Franklin Street
PID: 273-000133
Inst. 200912080177310
Inst. 200912080177311
R/W R/W
R/W R/W
R/WR/WR/WJenkins Dublin LLC
6 South High Street
PID: 273-000051
Inst. 200704020055964
37 Darby Co. Ltd.
14-18 South High
Street
PID: 273-000040
Inst.
200708020135136J & E Price LLC24 South High StreetPID: 273-000056Inst. 20151202016949822 South HighStreetPID: 273-000102BluebirdConsulting GroupLLC30 South HighStreetPID: 273-000008Inst.201710270151355BluebirdConsulting GroupLLC32 South HighStreetPID: 273-000089Inst.198211100105897Lucky Duck Investments32 South High StreetPID: 273-000072Inst. 201203140035264201203140035265, &201301160008627Lot 125Lot 124
Lot 123Lot 122Lot 121Lot 120Lot 119Lot 118Lot 117Lot 116 Spring Hill (16.5' Wide)Eberly Hill (16.5' Wide)Pinney Hill Lane(48' Wide)Providential Properties
48-52 South High Street
PID: 273-000087
Inst. 20140502005389354S High LLC54 South High StreetPID: 273-000097Inst. 202008210123954South High StreetPID: 273-000259Karmi Capital LLC58 South High StreetPID: 273-000014Inst. 2020200814011935466 South High StreetPID: 273-000074Bavelis Family LLC
76-82 South High StreetPID: 273-000061
Inst. 201811280160756
Robert E. Benson86 South High StreetPID: 273-0000886Inst. 199207170153926Multiplex Realty LLC
90 South High StreetPID: 273-000052
Inst. 200711090194927
ODIG LTD106 South High Street
PID: 273-001978
Inst. 199812020309694Allan D. Staub
114 South High Street
PID: 273-000066Inst. 200003200053736
Whats the Point?126 South High Street
PID: 273-000085
Inst. 200708220148032
M & D Partners LLC
138 South High StreetPID: 273-000063
Inst. 201908120100972
Deborah S. Steele
South High Street
PID: 273-013083
Inst. 201908120100974
Amy Elizabeth
Bechert, Trustee
156 South HighStreet
PID: 273-000066
Inst.202006090080379
Karen L. Strauss
158 South High Street
PID: 273-000067
Inst. 201912180170226
Lot 1Lot 2Lot 3 R/WR/WR/WR/WR/WR/WR/W R/W R/W R/W
E
EEERyan Dammann
140 Waterford Drive
PID: 273-000798
Inst. 201805290070416
Neil W. Mathias
162 Waterford Drive
PID: 273-000801
Inst. 201009030115035
Joshua M. Manning
195 Franklin Street
PID: 273-000800
Inst. 200503170049454
Pamela K. Mitchell
183 Franklin StreetPID: 273-000799
Inst. 199712260175611
Amy Jo Hall
123 Franklin Street
PID: 273-000136Inst. 198707220151310
Pauline C. Johnson
105 Franklin Street
PID: 273-000132
& 273-000134
Inst. 197009010018108
Arfan Midani95 Franklin Street
PID: 273-000130
Inst. 201012010163117 Aaron J. Frank
85 Franklin Street
PID: 273-000128
Inst. 200403010043758
Michael J. Streng
75Franklin StreetPID: 273-000126
Inst. 201406190077209 The Congregational
Church of Dublin, Ohio
Franklin StreetPID: 273-000113
Inst. 196008110014094
Davis Alley (27.5' Wide) (Vacated byOrd. 57-77)Davis Alley (27.5' Wide)(Vacated by Ord. 57-77)The Congregational
Church of Dublin, Ohio
Franklin Street
PID: 273-000096Inst. 196008110014094
The Congregational
Church of Dublin, Ohio
Franklin Street
PID: 273-000077
Inst. 196004120005679
8"San 8"San 8"San8"San 8"San 8"San8"San 8"San
8"
S
a
n
8"San 8"San 8"San 8"San 8"San 8"San 8"San 8"San 8"San 8"San 8"San 8"San 8"San
8"San
8"San8"San8"San18"Stm12"Stm12"Stm 12"Stm 12"Stm 12"Stm12"Stm12"Stm12"S
tm10"Stm8"Stm 8"Stm 8"Stm 8"Stm
12"Stm
1
2
"
S
tm
1
2
"
S
tm
18"Stm 18"Stm 18"Stm 12"Stm 12"Stm
18"Stm 15"Stm 12"Stm12"Stm18"Stm 18"Stm
6"Stm
12"Stm18"Stm18"Stm18"Stm 18"Stm 18"Stm 18"Stm6"Stm
12"Stm
8"Stm12"S
tm
12"S
tm 12"Stm12"Stm12"Stm 12"Stm
12"Stm12"St
m
18"Stm18"Stm18"Stm12"Stm
12"Stm12"Stm1
2
"S
tm
1
2
"S
tm
12
"
S
t
m
12
"
S
t
m
18"Stm 18"Stm
12"Stm18"Stm 18"Stm 18"Stm 15"Stm15"Stm12"StmWWWWW
WWWWW
WWW W W W W W W W W W W W W W W W W W W
WWWWWWWWW
W W W W W W W W W W
W
W W W
W
W
WWWW WWWW6"San6"
S
a
n
6"
S
a
nWWWWWWWWWWW
WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWR/WR/WEE2"G
2"G 2"G 2"G 2"G 2"G 2"G 2"G 2"G 2"G 2"G 2"G 2"G 2"G 2"G
2"G2"G2"G6"G6"G6"G6"G6"G6"G6"GGGGGEEEEE E E E E E E
WGMill Lane (30' Wide)
E
E
E E E E E E E E E E
R/W R/W R/W
R/W
R/WArea Under Construction
(Mud/Grass/Gravel)
EE
ACAC
AC
AC
AC
AC
AC
AC
ACAC
AC AC
AC AC
AC
AC
AC
ACAC AC
ACACAC
ACACACACAC
AC
AC
AC
AC
AC
AC
AC
AC
AC AC
AC
ACAC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC AC
AC
AC
AC
AC
ACAC
AC
Mill Lane (22' Wide)
City of Dublin, Ohio
34-36 Franklin Street
PID: 273-000111
Inst. 20021120029725024"San24"San24"San48"Stm24"San48"Stm48"Stm24"Stm24"Stm
30"Stm30"Stm30"Stm30"Stm30"Stm30"Stm30"Stm30"Stm
30"Stm30"Stm30"Stm30"Stm
30"Stm24"Stm24"Stm24"Stm24"Stm24"Stm24"Stm12"StmE EEEEEEE
E E E
EE
12"Stm
12"StmWWWW6"Stm 4"Stm6"Stm
12"Stm12"Stm12"Stm4"G 4"G 4"G 4"G 4"G 4"G 4"G
4"G 4"G 4"G 4"G 4"G 4"G4"G4"G 4"G 4"G 4"G 4"G 4"G 4"G 4"GGGGGGG
GGGGGGG⅊⅊⅊⅊⅊⅊
⅊
⅊
⅊
⅊⅊⅊⅊⅊⅊
⅊⅊⅊⅊
⅊⅊⅊⅊
⅊⅊⅊
⅊⅊⅊
⅊⅊⅊
⅊⅊⅊⅊
⅊⅊⅊⅊⅊⅊⅊
⅊⅊
⅊
⅊⅊
⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊
⅊⅊⅊⅊⅊
⅊
⅊⅊⅊⅊⅊⅊⅊⅊⅊
⅊⅊
⅊
Allan D. Staub
114 South HighStreet
PID: 273-000066
Inst.200003200053736
⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊⅊
Lance Schneier
143 South High Street
PID: 273-000015
Inst. 201912270173934
Elizabeth A. Whisler155 South High Street
PID: 273-000106
Inst. 201210040149094
18"Stm
U Crew Holdings LLC
113-115 South High
StreetPID: 273-000034
Inst. 201310160175201John Wright Lane (16.5' Wide)Wa
t
e
r
f
o
r
d
D
r
i
v
e
(Wi
d
t
h
V
a
r
i
e
s
)
⅊
City of Dublin
225 S. High Street
PID: 273-000143
Inst. 201003020024866
City of Dublin
225 S. High Street
PID: 273-000143Inst. 200604130069277
John Begley
& Lori Begley
6199 Dublin Road
81 Bridge Street
39 Bridge Street
AC
ACAC
E
AC E
⅊
G
TTT T
T
T
FO FO
FOLTRM
E
E E
EE
E
E
E
E
E
E
E
G
G
G
M
M
M
GV
GV GV
GV GV GV
GV
GV GV
GV
GV GV
GV GV GV
GV
GV
GV
GV
GV
GV
GV
GVGV
GV
GV
GV GV
GV
MB
MB
MB
MB
MB MB MB
MB MB MB MB
MB MB
MB
MB
MB MB
MB MB MB
MB MB MB
MBMB
T
T
TTT
T TTTT T
TTT
T
TTT
T
TT
TT
T
TT
T
TTT
T
T
T
T
T
TR
TR
TR
TR TR
TR
TR TRWW
M
M
MB
TTT T
TT
TYRRELLSTOWNENTERPRISES31 South HighStreetPID: 273-012386TYRRELLSTOWNENTERPRISES33 South HighStreetPID: 273-01238731TT
T T
T T TTTT
T
T
T TTT T
TT T
TTTTTTTTT
T
TTTT T T TTT T TT
TTTTTTTTTTTTTTTTTTTT T
TTEX UTILITY POLE SERVES141 UG & 123 OHDESIGNEDCHECKEDSOUTH HIGH STREET UTILITYBURIAL - PHASE 1 19-030CIP1MTS BMVAEP LETTER OF AGREEMENT EXHIBIT A1NOT TO SCALELEGEND
PROPOSED EASEMENT
PROPOSED TEMPORARY EASEMENT
PROPOSED UNDERGROUND TELECOM. MAIN LINE
PROPOSED UNDERGROUND ELECTRIC (AEP) PRIMARY
SPECTRUM EQUIPMENT
AT&T EQUIPMENT
WOW EQUIPMENT
DUBLINK EQUIPMENT
PROPOSED UNDERGROUND TELECOM. SERVICE
PROPOSED UNDERGROUND ELECTRIC SERVICE (AEP)
T
AT&T LETTER OF AGREEMENT - EXHIBIT ABREEZELINE LETTER OF AGREEMENT - EXHIBIT ALEGEND
BREEZELINE PROJECT
WORK
ENHANCEMENTS
BREEZELINE ENHANCEMENT MAP - EXHIBIT B
SOUTH HIGH STREET UTILITY BURIAL 19-030 CIP
PHASE 1 AREA
W BRIDGE ST
FRANKLIN STS HIGH STINDEX OF SHEETS
TITLE SHEET......................................................................................................................................1
SCHEMATIC PLAN.............................................................................................................................2
GENERAL NOTES..............................................................................................................................3
GENERAL NOTES & LEGEND..........................................................................................................4
GENERAL SUMMARY........................................................................................................................5
JOINT-USE DETAILS......................................................................................................................6-7
TELECOMMUNICATION SECTIONS............................................................................................8-12
PLAN AND PROFILE (INCLUDING SUB-SUMMARIES)............................................................13-24
PED LOCATION DETAILS..........................................................................................................25-31
LANDSCAPE DETAILS...............................................................................................................32-37
LOCATION MAP
SOUTH HIGH STREETUTILITY BURIAL - PHASE 1
19-030-CIP
PORTIONS TO BE IMPROVED:
STANDARD CONSTRUCTION DRAWINGS
CITY OF DUBLIN CITY OF COLUMBUS ODOT
NOT FOR CONSTRUCTION, 10/18/2022
PROJECT
LOCATION
1
0
GRAPHIC SCALE
SCALE IN FEET
500 1000 1500
SIGNATURES BELOW SIGNIFY CONCURRENCE WITH THE GENERAL PURPOSES AND
GENERAL LOCATION OF THE PROJECT ONLY AND DO NOT CONSTITUTE ASSURANCE TO
OPERATE AS INTENDED. ALL TECHNICAL DETAILS REMAIN THE RESPONSIBILITY OF THE
PROFESSIONAL CIVIL ENGINEER PREPARING THE PLANS.
DIRECTOR OF ENGINEERING/CITY ENGINEER
CITY OF DUBLIN, OHIO
PAUL A. HAMMERSMITH, P.E.
DATE
REGISTERED ENGINEER DATE
APPROVED:
37
PROJECT INCLUDES RELOCATION OF OVERHEAD TELECOMMUNICATION
UTILITIES IN THE DUBLIN AREA. EXISTING AERIAL FACILITIES WILL BE
RELOCATED UNDERGROUND STARTING FROM SHORT STREET, WEST ON
WATERFORD DRIVE, NORTH ON FRANKLIN STREET, SELLS ALLEY, MILL
LANE, AND NORTH TO BRIDGE STREET. A JOINT-USER DUCT BANK WILL BE
INSTALLED TO UNDERGROUND THE TELECOMMUNICATION UTILITIES.
PROJECT DESCRIPTION
THE CITY OF COLUMBUS CONSTRUCTION AND MATERIALS SPECIFICATIONS
(CMSC), 2018 EDITION INCLUDING ALL REVISIONS AND SUPPLEMENTS IN
EFFECT AT THE TIME OF SIGNATURE BY THE DIRECTOR OF PUBLIC SERVICE,
SHALL GOVERN ALL CONSTRUCTION ITEMS THAT ARE A PART OF THIS PLAN
UNLESS NOTED OTHERWISE.
2018 SPECIFICATIONS