HomeMy WebLinkAbout07-15-21 Public Services Com. MinutesDublin City Council
Public Services Committee
Wednesday, September 15, 2021 - 5:00 p.m.
5555 Perimeter Drive
Ms. Fox called the September 15, 2021 Public Services Committee meeting t*
*rder at 5:03 p.m.
Staff present: Mr. Ranc, Mr. Stanford, Ms. Nardecchia, Mr. Taylor, Mr. Plouck,
Mr. Earman, M
Approval of Minutes
Ms. Fox asked that a notation regarding the cost of tapping into City services be
added to the mitutes.
Vice Mayor De Rosa moved to approve the minutes of the August 23, 2021
Public Services Committee meeting as amended.
Mr. Reiner seconded the motion.
Facilities & Fleet
Mr. Ashford provided an update to the Committee including the organizational
chart.
Facilities Management
Mr. Ashford explained that the department is a work order -based department
.2,nd he shared a summary of work orders from January through August. He
shared a custodial quality control report and an overview of custodial
inspections.
Ms. Fox asked if custodial inspections of contract workers is new within the las','m
year or has it been enlarged. Mr. Ashford stated that when the quality control
position was approved, that allowed them to oversee that contract better. The
person in this position oversees the 3rd shift contract and does inspections.
ON
malm-mr-min
Public Services Committee
Septemb-
"`, s
ePage 2 of 7
that they are doing disinfectant spraying of sensitive areas and disinfecting high -
touch areas and that will continue until further notice. Vice Mayor De Rosa stated
that she has heard positive -things from residentsi , - - I
471 MUCc-A I 'I) Inat
produces 50-60% of electricity used by the rec: center. It is a partnership with
IGS who has had some issues keeping their equipment running and due to the
ongoing pandemic, they have not been able to bring technicians from Germany
to fix the issues. The lease agreement is a 15 -year agreement. They are
supposed to produce a certain number of kilowatt hours and if they fall short,
the City receives a credit. He reviewed sustainability projects like lighting
conversions and HVAC installations and associated AEP rebates.
Fleet Management
Mr. Ashford provided the Committee an update on green vehicle fleet. The goal
is to keep the vehicles available for the departments to use. Mr. Ashford providevi
an update on the City's green fleet. Of the City's 191 cars and light trucks, 45 are
CNG, 10 are electric, and 11 are hybrid (gas and CNG) so 35% of vehicles and
light trucks are green. The City has 27 dump trucks and 8 are CNG or 30%. The
City has 43 pursuit vehicles and 8 are hybrid/electric. Mr. Ashford applauded the
fleet manager John Hyatt because all future pursuit vehicles will be hybrid/
electric because it allows the engine to shut off while the computer and radio
continues to function which can saves 1200 gallons of gas each year for one
hybrid vehicle.
Ms. Fox asked about goal regarding a timeline moving to green fleet. Mr. Ashford
stated that he appreciates Council being willing to support green vehicles.
Making a dump truck CNG is a $20k upgrade. It appears that engines will last a
lot longer than a diesel engine and if we find the engines last longer like they
appear to, then we can make the economic case as well as the sustainability
argument for green vehicles. Ms. Fox stated that is worth bringing back to
Council.
Mr. Ashford shared that looking forward, they are looking for ways to increase
clean or renewable sources in the City's upcoming energy contract. Mr. Ranc
stated that Nick Plouck has found a company that will help us compare the cost
of clean and/or renewable energy sources in order to see how we can do in
terms of making consumption more sustainable from a City perspective. Counct'i
will be seeing that analysis.
13FY RET
Page 3 of 7
Vice Mayor De Rosa asked if it would be feasible to put together what it would
take to have a 100% all -electric or -hybrid fleet by 2030. Mr. Ranc answered that
they could do that.
Vice Mayor De Rosa asked if the electric vehicle charging stations are free. Mr.
Ashford stated that they are free. He explained that anyone who has an app ca
see where they are and whether they are fee or free. They are free right now.
Vice Mayor De Rosa would like to see usage reports on those. Mr. Ashford stat 1i
'i
that engineering is installing some fast chargers but he is not sure those will be
al
free. Mr. snc stated that Staff is looking into a grant from AEP to install those'.
Ms. Fox stated that as the country moves to electric vehicles in the next 15
years, if the City has free charging stations, that will attract more people and W
require more charging stations. She asked what the anticipated need of chargi
stations will be in the future and what Staffs thoughts are on free versus
charging for them. Vice Mayor De Rosa noted that there will be different
a
technologies like charging pavement. Mr. Ranc stated that sounds wonderful I]
he will get with the transportation team and look into that.
Mr. Reiner asked if the Bridge Street chargers are fee or free. Mr. Ashford
answered that they are free. Ms. Fox stated that she would be curious to see
how much the charging stations in Bridge Park are used. Mr. Ashford stated thali
they are used a lot. Ms. Fox asked what it would cost to charge a car. Mr.
Ashford stated that he can get that information. It is tied to the grant from AEP
and separate meters were installed so that can be tracked.
Asset Management & Support Services
Mr. Taylor gave an update on asset management and support services including
sharing the organizational chart.
Inventn
Mr. Taylor stated that GIS had a really good inventory when he started with the
City and he has continued to build upon that. Dubscovery gives a comprehensive
view of everything the City has. GIS houses the static features of all assets and
Cityworks houses the dynamic data. He shared a dashboard example showing
streets inventory.
Inspections
Mr. Taylor shared a list of assets that are currently inspected (bridges, tunnels,
etc.). This list has grown every year.
Ms. Fox asked about historic properties that the City owns but that are not weli
maintained i.e., buildings, landscapes, stone walls. Mr. Taylor stated that they
Public Services Committee
September 15, 2021 Minutes
Page 4 of 7
are part of the asset listing and Staff is creating a comprehensive inspection
process for that. Ms. Fox asked where asset management control is. She stated
that she was toldr a lot of public art and parks -maintenance pieces- will be moving
under the general asset management umbrella. She is concerned about the
maintenance of these assets that are in parks. Mr. Taylor stated that they are
working with Parks currently. Parks has their own process. He anticipates that by
the end of the year, they will be able to bring selected parks assets into the
program. Ms. Fox asked how a determination is made as to what assets will be
placed under the asset management umbrella. Mr. Taylor stated sidewalks were
not included because they do not have an annual inspection program. He
explained that they will start with assets like shelter houses, structures, ball
diamonds, fields, playgrounds while still trying to determine if items like park
benches will be included.
Mr. Ranc stated those historical properties will absolutely be part of this and will
give us opportunity to have a proactive plan. Ms. Fox stated that one of the
benefits of this is that if there is an understanding of the costs of maintaining a
historic property, Staff would be able to better determine whether or not
Ilemolition of a historic property is really cost effective. Mr. Taylor stated that all
inspections and work are tied to specific estimates with costs in Cityworks.
Mr. Taylor provided a snapshot of what the inspector sees in the field. He also
showed an inspection schedule.
Assessment
Mr. Taylor shared the assessment tool — Tableau. This can be used to search all
of the inspection data that has now been compiled and generate average
conditions course for assets.
Mr. Reiner asked if there is enough staffing to take care of these inspections.
Taylor stated that for now we have one inspector doing all of these inspections
Staff will be looking at additional options as decisions are made about inspectio
schedules and incorporating different items. He shared that college interns (civi
engineering students) help with ADA ramp inspections.
Planning Work — Maintenance or CIP
Mr. Taylor explained that the first step of planning work is deciding if it is
maintenance or a capital project. Some work that cannot be done in house oft
becomes capital work. He shared an example of the dashboard and work plans
The dashboard gives an overall snapshot of work planned on the asset. Mr.
Tay or stated that they take the data do the assessment an cr
wanted. Mr. Taylor stated that Staff could make sure Council has access to th
dashboard. Ms. Fox sated that this is data that they need. Vice Mayor De Ros
stated that some,of that is out,t.here today. Mr. Taylor stated, thatsidewalka
street maintenance is out there today. Right now the Hub is internal facing b
could be made external if that is decided. Mr. Taylor noted that those plans
change, It is a five-year plan. I
Mr. Taylor closed by stating that we are in a great position where we're doing 17.
lot more planned work instead of reactive work.
Ms. Fox stated that • a better handle on data, there can be a better handle ♦"
the manpower. This provides a clear picture of whether or not we have enough
people.
Mr. Taylor stated that GoDublin is also part of the Asset Management program.
It was brought online in 2019. A lot of data has been added since then. This
allows the residents to be able to speak to us easily and allows us to respond.
This year Staff has responded with a specific crew that addresses these requests.
This has gone off better than expected. The crews love the work; they love the
variety. Ms. Fox asked if the team sees the compliments and comments from
residents. Mr. Taylor stated that he doesn't see a lot but they tell him that they
hear a • from the field.
Ms. Fox stated • the GoDublin app `♦ her it and asked how the
experience was. Mr. Taylor stated that the app developer started gathering that
recently.
111 �1711111 IN 11 ma_
Off MINIM 1 P� 111
Mr Reiner explained t1Jat 17e has a mandatory course and excused himself from
the dais at 5.56
W
Public Services Committee
September 15, 2021 Minutes
Page 6 of 7
allow communication. She loves that code enforcement is included because
people get nervous calling in. Ms. Fox stated that she loves getting feedback on
"Ahe service reqbecomes a two-way street. She stated that -it has -
built wonderful trust in the community.
Mr. Taylor stated that there is a 3rd phase of how we are going to handle the
"everything else" questions. Staff will be working with Communication and Publ
Information on those. `1
Outreach & Engagement
Ms. Nardecchia provided a quick update on outreach and engagement. She
shared their organizational chart and their goal of matching people to their
purpose. She explained that they are supporting city services; they are in 98% of
city divisions/departments, most recently supporting code enforcement. They
spend most of their time connecting people to things they need. She shared the
four "buckets" or categories into which they divide their work (Ongoing Volunteer
Programs, One -Time Event Support, Projects, Initiatives & Support, Nature
Education).
Ms. Nardeccia shared the outreach done last year and how it changed due to the
pandemic. They developed instructional materials and began weekly
meetings/check-ins with senior facilities. She stated that sometimes people still
do call the City and staff will take the information and enter it into GoDublin for
folks that are less comfortable using an app. Her group partnered with
organizations to get needs met via home deliveries. She explained Dublin Cares
as a group of organizations of which the City is a convener. Forever Dublin has
been a struggle because people cannot get together in person. Staff is
considering how that will continue into 2022. In 2022, the focus will be on
retention and re-engagement; the assessment of Dublin Cares; the re-
engagement of Forever Dublin; and the impact of Nature Education.
Tice Mayor De Rosa extended her thanks. It has been a tough year and she
sincerely appreciates this work. It is easy to measure input; output is harder to
summarize. Placing the focus on impacts is exactly right. There is a much
stronger coordination between different groups and she appreciates that.
Ms. Fox stated that the division should be renamed "outreach and well-being".
The work being done is holistic community well-being and how to create policies
or services that create life-long well-being. She expressed admiration for the
organizational strategy used.
Page 7 of 7
soon there will be an unveiling of "work, learn, engage"' on the City's website
that will be clearer. Right now, the way we organize our work may not make the
most -sense to the resident but- you will see that very r soon.,
There being no further business to come before the Committee, the meeti
adjourned at 6:23 pm. I
--v-, AL , -) ) / , (1 01)