Loading...
HomeMy WebLinkAboutResolution 23-21 To: Members of Dublin City Council From: Dana L. McDaniel, City Manager Date: April 20, 2021 Initiated By: Paul A. Hammersmith, PE, Director of Engineering/City Engineer Michael S. Sweder, PE, Interim Deputy Director of Engineering Re: Resolution 23-21 – Accepting the Lowest and Best Bid for the SR 161 / Cosgray Road Roundabout Project Summary On April 6, 2021, seven (7) bids were received, publicly opened and read by Engineering staff for the State Route (SR) 161 / Cosgray Road Roundabout project (the “Project”) as identified in the adopted 2017-2021 Capital Improvements Program (CIP). Work included in the Project consists of the construction of a modern roundabout including asphalt paving, storm sewer, curb and gutter, straight curb, truck apron, brick pavers, sidewalk, shared-use path, street lights, signing, pavement markings and landscaping. Being located at the intersection of SR 161 and Cosgray Road, the Project is within three separate jurisdictions, the City of Dublin (the “City”), Union County and Franklin County. All three jurisdictions (collectively, the “Project Partners”) have been working together to construct this Project. The Project Partners entered into a Cooperative Construction Agreement on June 28, 2016 for the intersection improvements. In accordance with the Agreement, the City was the main point of contact regarding the property acquisition necessary for the Project, but Union County was responsible for costs of purchasing or acquiring those property interests from the various property owners. The Engineer’s estimate for this project is $3,500,000. In accordance with the Agreement, the City previously contributed $937,500 towards the project to Union County. In addition to the City’s contribution, Franklin County and the Developer were also obligated to make financial contributions towards the Project. Along with the financial contribution, the City agreed to perform property acquisitions, coordinate utility relocations, oversee plan preparation and manage construction and inspection for the Project. Union County is to finance the remaining costs of the Project and pay all invoices. George J. Igel & Company, Inc. submitted the lowest and best bid of $3,073,309.83. Staff has reviewed all bids and a summary of the bids received is listed below. Bidder Bid as Read Bid as Read Corrected Bid Over (+) or Under (-) Engineer’s Estimate George J. Igel & Company, Inc. $3,073,309.83 -12.2% Strawser Paving Company, Inc. $3,074,245.90 -12.2% Trucco Construction Company $3,213,800.00 -8.2% Double Z Construction $3,244,845.34 -7.3% Office of the City Manager 5555 Perimeter Drive • Dublin, OH 43017-1090 Phone: 614.410.4400 • Fax: 614.410.4490 Memo Resolution 23-21 – Accepting the Lowest and Best Bid for the SR 161 / Cosgray Road Roundabout Project April 20, 2021 Page 2 of 2 Bidder Bid as Read Bid as Read Corrected Bid Over (+) or Under (-) Engineer’s Estimate Complete General Construction Company $3,264,017.86 -6.7% Shelly & Sands, Inc. $3,411,944.95 -2.5% Columbus Asphalt Paving, Inc. $3,590,438.95 2.6% Construction of this Project is anticipated to commence in May 2021 and the intersection will remain open to traffic during construction while being constructed in phases. The Project is required to be substantially complete and open to traffic in August 2021. The final completion date for the project is September 30, 2021. The typical and customary communication methods will be used to convey construction information with the residents, business owners and motorists throughout the duration of this Project. The City will have a designated Engineering Project Inspector assigned to the work for this Project who will provide coordination, be available to answer any questions and manage access needs at adjacent businesses and residences throughout the performance of the work. Recommendation Staff has thoroughly reviewed the bid submitted by George J. Igel & Company, Inc. Previous experience with George J. Igel & Company, Inc. has been favorable, including these projects: Smart Parking Lot Construction (2017/2018); Retaining Wall Maintenance (2018); and Sanitary Sewer Extension – Areas 11 A/B and Limerick Lane Storm Sewer (2018). Staff is confident George J. Igel & Company, Inc. will perform well on this project. Staff recommends Council approval of Resolution No. 23-21 accepting as lowest and best the bid of George J. Igel & Company, Inc. in the amount of $3,073,309.83 and authorizing the City Manager to enter into a contract with George J. Igel & Company, Inc. for the Project.