Loading...
HomeMy WebLinkAboutResolution 18-21 To: Members of Dublin City Council From: Dana L. McDaniel, City Manager Date: March 16, 2021 Initiated By: Paul A. Hammersmith, PE, Director of Engineering/City Engineer Michael S. Sweder, PE, Interim Deputy Director of Engineering Kenneth B. Richardson, PE, PS, Senior Civil Engineer Re: Resolution 18-21 – Accepting the Lowest and Best Bid for the Muirfield Drive at Brand Road Bridge Replacement Project Summary On March 2, 2021, eight (8) bids were received, publicly opened and read by Engineering staff for the Muirfield Drive at Brand Road Bridge Replacement project (the “Project”). This Project will replace the existing twin bridge structures with new twin bridge structures similar in appearance and size to the two existing bridges. A copy of the Muirfield Drive at Brand Road Bridge Replacement construction drawings has been provided for review in the BoardPaq packet for the March 22, 2021 meeting, or a hard copy is available for review upon request. The Engineer’s estimate for this project is $1,300,000. The budgeted funds in the 2021-2025 Capital Improvements Program (CIP) for the Muirfield Drive at Brand Road Bridge Replacement project are $1,275,000 in account AT21C - Annual Vehicular Bridge Maintenance. Complete General Construction Company submitted the lowest and best bid of $1,291,231.20. Staff has reviewed all bids and a summary of the bids is listed below. Bidder Bid as Read Bid as Read Corrected Bid Over (+) or Under (-) Engineer’s Estimate Complete General Construction Company $1,291,231.20 -0.7% n/a George J. Igel & Co., Inc. $1,320,435.40 1.6% n/a The Righter Co., Inc. $1,384,076.09 6.5% n/a Double Z Construction Company $1,398,095.85 7.6% n/a Shelly & Sands, Inc. $1,429,990.35 10.0% n/a Eagle Bridge Co. $1,488,800.10 14.5% n/a Sunesis Construction Co. $1,499,090.42 15.3% n/a Crawford Construction Co., Inc. $1,516,949.11 16.7% $1,516,958.83 Office of the City Manager 5555 Perimeter Drive • Dublin, OH 43017-1090 Phone: 614-410-4400 • Fax: 614-410-4490 Memo Resolution 18-21 – Accepting the Lowest and Best Bid for the Muirfield Drive at Brand Road Bridge Replacement Project March 16, 2021 Page 2 of 2 As is typical annually with the CIP implementation, there are a number of other projects that are transportation related to be performed in 2021. Given the lowest and best bid of $1,291,231.20, this overall project would exceed the budgeted funds after inclusion of the $122,350.26 design contract. Staff anticipates being able to cover the shortage using unencumbered funds carried over from the 2020 Annual Vehicular Bridge Maintenance program. Construction of this Project is to commence in mid-June 2021 after the conclusion of the Memorial Tournament. Muirfield Drive will remain open to traffic in both directions for the duration of the construction. A temporary paved median crossover will be constructed north of the Muirfield Drive/Brand Road roundabout to maintain one lane of traffic in each direction on one Muirfield Drive bridge while the adjacent twin bridge is under construction. The Muirfield Association entrance sign and the adjacent pedestrian bridges will not be disturbed during the construction. The completion date for this project is November 20, 2021. The typical and customary communication methods will be used to convey construction information with the residents and motorists throughout the duration of this project. Additionally, staff will communicate directly with the Memorial Tournament staff and the Muirfield Association prior to any construction activities so the upcoming construction activities are clearly communicated and understood. Recommendation Staff has thoroughly reviewed the bid submitted by Complete General Construction Company. Previous experience with Complete General Construction Company has been favorable, including these recent projects: 2019 Vehicular Bridge Maintenance – Frantz Road at Cosgray Creek; North High Street Widening. Staff is confident Complete General Construction Company will perform well on this project. Staff recommends Council approval of Resolution 18-21 accepting as lowest and best the bid of Complete General Construction Company in the amount of $1,291,231.20 and authorizing the City Manager to enter into a contract with Complete General Construction Company for the Project. Location Map Twin Bridge Location