78-08 ResolutionRECORD OF RESOLUTIONS Dayton Legal Blank, Inc.. Form No. 30045 78-08 Resolution No. Passes( 7Q A RESOLUTION ACCEPTING THE LOWEST AND BEST BID FOR THE AVERY PARK PHASE III RENOVATIONS PROJECT, AND AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT FOR SAID SERVICES. WHEREAS, formal advertising and competitive bidding procedures have been conducted pursuant to Section 8.04 of the Dublin Charter for the Avery Park Phase III Renovations Project; and WHEREAS, Council has determined that the base bid submitted by At Grade, Inc. in the amount of $440,460.00 constitutes the lowest and best bid; and WHEREAS, this is an approved 2008 Capital Improvements Project. NOW, THEREF~BE IT RESOLVED by the Council of the City of Dublin, State of Ohio, of the elected members concurring, that: Section 1. The base bid submitted by At Grade Inc. in the amount of $440,460.00, bid alternate addition #2 (with alternate deduct #2) for a net amount of $99,500.00, bid alternate #5 in the amount of $3,348.00, and bid alternate #6 in the amount of $1,150.00 are hereby accepted. Section 2. The City Manager is hereby authorized to enter into a contract for said project as specified within the bid proposal and the City's bid documents on file in the Division of Parks & Open Space. Section 3. This Resolution shall take effect and be in force upon passage in accordance with Section 4.04(a) of the Revised Charter. Passed this ~~ day of ~~ O ~~~ , 2008 Mayor -Presiding Officer Attest: Clerk of Council CITY OF DUBLIN_ Office of the City Manager 5200 Emerald Parkway • Dublin, OH 43017-1090 Phone: 614-410-4400 • Fax: 614-410-4490 TO: Members of Dublin City Council FROM: Marsha Grigsby, Interim City Manager /~}'Y1,~CCj~ DATE: October 16, 2008 INITIATED BY: Fred Hahn, Director of Parks & Open Space RE: Resolution 78-08, Avery Park Phase III Renovations Project Memo Summary On Thursday, October 16, 2008, the bids were opened for the Avery Park Phase III Renovations Project. The remaining balance for this phased project is $578,624. The funds for this phase are included in the 2008 Capital Improvements Program. The base bid estimate for this project was $467,643.00. Four (4) bids were received (attached are the complete bid results including all bid alternates): Base Bid George J. Igel $699,752.00 McDaniel's Construction Corp, Inc. $529,029.04 Strawser Paving Inc. $515,800.00 At Grade Inc. $440,460.00 This project consists of all materials and labor necessary to install a playground, lit tennis courts, lit walkways, associated earthwork and landscaping. The bid alternates consist of the following: • Bid alternate add #1 is for additional trees/shrubs (Deduct #1 is for the removal of seed at shrub areas if add #1 is taken) • Bid alternate add #2 is rubberized play surface (Deduct #2 is removal of fibar play surfacing if add #2 is taken) • Bid alternate add #3 is for concrete seat wall (Deduct #3 is to eliminate flush concrete band at playground border at concrete seat wall if add #3 is accepted) • Bid alternate #4 is for ornamental grasses at outfield • Bid alternate #5 is for concrete curb at bikepath • Bid alternate #6 is for storm inlet relocation • Bid alternate #7 is for paver crosswalk. (Complete construction details are available for review in the Council Planning room.) At Grade Inc. has done work for the City of Dublin in the past and staff has found their work to be most satisfactory. Recommendation Staff is recommending approval of Resolution 78-08 accepting At Grade Inc.'s base bid of $440,460; the acceptance of bid alternate add #2 ($115,000) with deduct #2 (-$15,500) for a net addition of $99,500; acceptance of bid alternate # 5 in the amount of $3,348; and acceptance of bid alternate #6 in the amount of $1,150. The total project cost including these alternates is $544,458.00. Bid Opening Results for AVERY PARK PHASE THREE RENOVATIONS-REBID October 16, 2008 Base Bid Add. Alt Ded. Alt Add. Alt Ded. Alt Add. Alt Ded. Alt Add. Alt Add. Alt Add. Alt Add. Alt as read #7 #7 #2 #2 #3 #3 #4 #5 #6 #7 $529,029. 00 $24,645.00 ($255.00) $129,050.00 (526,954.00) $27,815.00 ($5,250.00) $6,900. 00 $39,880.00 $2,500.00 $14,197.00 $515,800. 00 $22,675.00 ($330.00) $117,750.00 (519,350.00) $29,700.00 ($1,700.00) $6,350. 00 $3,200.00 $1,260.00 $17,900.00 $699,752. 00 $24,000.00 ($200.00) $117,580.00 (58,960.00) $24,125.00 ($2,295.00} $6,720. 00 $2,695.00 $4,150.00 $11,000.00 $440,460. 00 $28,924.00 ($430.00) $115,000.00 (515,500.00) $7,935.00 ($1,000.00} $6,900. 00 $3,348.00 $1,150.00 $23,863.00