A RESOLUTION ACCEPTING
THE LOWEST AND BEST BID FOR THE
2019 STREET MAINTENANCE PROGRAM — PHASE II
WHEREAS, formal advertising and competitive bidding procedures have been
conducted, pursuant to Section 8.04 of the Dublin Charter and Chapter 37 of
the Dublin Code, for the 2019 Street Maintenance Program — Phase II; and
WHEREAS, Council has determined that the bid submitted by Decker
Construction Company constitutes the lowest and best bid.
NOW THEREFORE, BE IT RESOLVED by the Council of the City of Dublin,
r7 of its elected members concurring, that:
if
Section 1. The bid submitted by Decker Construction Company in the total
amount of $3,324,160.26 is hereby accepted.
Section 2. That the City Manager is hereby authorized to enter into contracts
with Decker Construction Company for performance and completion of the
2019, Street Maintenance Program — Phase II pursuant to the Advertisement,
Proposal and Contract Documents for said project on file in the office of the
City Engineer.
S_ ectJon 3. This Council further hereby authorizes and directs the City
Manager, the Director of Law, the Director of Finance, the Clerk of Council, or
other appropriate officers of the City to prepare and sign all other agreements
and instruments and to take any other actions as may be necessary to
implement this Resolution and complete the Project.
Section 4. This Resolution shall take effect upon passage in accordance with
Section 4.04(a) of the Revised Charter.
Pass( this day of 12019.
yor - PrpXiding Officer
ATTEST:
Clerk
of Council
J
C ity of Dublin
it
Office of the CI*ty Manager
5200 Emerald Parkway * Dublin, OH 43017-1090
Phone: 614.410.4400,o Fax: 614.410.4490
To.1m Members of Dublin City Council
From: Dana L. McDaniel, City Manw
a
Date, April 30, 2019
Cnitiated By: Paul A. Hammersmith, PE, Director of Engineering/City Engineep
Barbara Cox, PE, Engineering Manager
John Henderson, PE, Civil Engineer II
Resolution 29-19 — Bid Acceptance for 2019 Street Maintenance
Program — Phase 11
On April 18, 2019, (4) bids were received, publicly opened, and read by Engineering staff for the 201
Street Maintenance Program — Phase II. A copy of the 2019 Street Maintenance Program — Phase II
construction drawings has been placed in the Council Planning Room for your reference and review. I
The Engineer's estimate for this project is $3,250,000. The budgeted funds for the Annual Street
Maintenance Program for 2019 in the 2019-2023 Capital Improvements Program are $6,850,000
(increased by $850,,000 per Ordinance No. 06-19) in account AT191. Phase I of this maintenance
program, which generally consists of streets without curb and gutter, was awarded to Kokosing
Construction for $2,,689,443.50 (Resolution No. 21-19).
Decker Construction Company submitted the lowest and best bid of $3,324,160.26. This makes the total
for the two phases $6,013,603.76, which is within the revised budget. Staff has reviewed all bids submitted
for Phase II and a summary of the bids received is listed below.
Bid as Read
Bidder Bid as Read Over (+) or Under Corrected Bid
Enaineer's Estimate
Decker Construction any $3,324,160.26 +2.3%
Strawser Paving Company, Inc. $3,332,905.92 +2.6%
Kokosing Construction $3,366,780.46 +3.6%
Columbus Asphalt Paving, Inc. $3f42lf428.48 +5.3%
Work included in the 2019 Street Maintenance Program — Phase II consists of roadway resurfacing and
reconstruction, base stabilization, spot repair, curb and gutter replacement, installation of ADA
(Americans with Disabilities Act) compliant curb ramps and other associated work. All work is planned t#
be complete by November 1, 2019.
Additionally, the traffic signal pedestrian controls and curb ramps will be upgraded at the Emerald
Parkway/Hard Road and Hard Road/Claddaugh Lane intersections to meet current ADA standards. It is
required that adjacent pedestrian facilities are brought into ADA compliance when significant
maintenance activities occur on any street or roadway, which includes resurfacing,
Resolution 29-19 - Bid Acceptance for 2019 Street Maintenance Program — Phase II
April 30, 2019
Page 2 of 3
11111111'rl I[IM71JIM PIC 1 !114 111 1111��1111 11111pq III
__JjI I
The 2019 program includes resurfacing on City streets as depicted on the attached City map. The streets
to be improved are as follows:
Summit View Road
Pinneyhill Lane
Angeles Drive
S. Blacksmith Lane
Manteo Drive
Wing Hill
Lido Court
North Street
Wyler Drive
Stoneridge Lane
Wyler Court
Shamrock Boulevard
Wynwrigtht Drive
Macbeth Drive
Wynwright Court
Macduff Way
Keiler Court
Hard Road
Literary Lane
Bryson Cove Circle
Pilar Court
Clover Park Way
Kilimanjaro Court
Loch Dunne Place
Carrick Court
Inverurie Drive West
Ernest Way
Caithness Drive
Great Novel Court
Dunskeath Court
Starkeys Court
Monifieth Court
Nature Drive
Abbotsford Drive
Forest Run Court
Castle bay Drive
T'Imberview Drive
Taller Ridge Road
S. High Street
Brand Road
All work will be performed while maintaining traffic where possible with efforts being taken to minimize
o
interruptions to motorists, provide access for emergency servi , ces, maintain access to driveways and
adjacent streets as much as possible, and consistently provide a safe work area for motorists and
workers.
liq
- =1L., #
The followinq communication methods will be used to communicate construction information with the
residents and motorists throughout the duration of this project.
Resolution 29-19 - Bid Acceptance for 2019 Street Maintenance Program — Phase II
April 30, 2019
Page 3 of 3
• Due to the short notification time period for driveway closures, Dublin Engineering staff makes
adjustments to the construction schedule to accommodate resident needs on a case-by-case
basis.
• The typical City of Dublin social is channels are used to communicate timely construction
updates.
I
Staff has thoroughly reviewed the bid submitted by Decker Construction Company. Previous
experience with Decker Construction Company has been favorable, including these recent projects:
2018 Shared -Use Path Maintenance Program, 2015 Street Maintenance Program - Part 1 and Dublin
Road Shared Use Path - Phase 2 (2013). Decker Construction Company has also been a sub -contractor
for concrete work on past Street Maintenance Programs.
Staff recommends Council approval of Resolution No. 29-19 accepting as lowest and best the bid of
Decker Construction Company in the amount of $3,324,160.26 and authorizing the City Manager to
enter into a contract with Decker Construction Company for this project.
J.F..e11�
4
E
9
tla i)i
�e4rtaR
L.K^Lr
MAP INDEX
TITLE SHEET
Fs�P
w�er�
p
� g �
PWn Rnry
!!S
d
LJ.P,naP
coPeA
J.F..e11�
4
E
9
tla i)i
�e4rtaR
L.K^Lr
2019 CITY OF DUBLIN STREET
MAP INDEX
TITLE SHEET
Fs�P
w�er�
p
� g �
�e�a
1
2019 CITY OF DUBLIN STREET
of
4
,rwu1 R
MAINTENANCE PROGRAM
u.ew.p Ri iRpELQbJ QO
eF1„p $ ry'eln�
1]J Lee�p 4
�.w �WierNWp
P
PUWIn �StlYm Bargtl
pMlebrp _ (yry Wry
d � weep
R b 4 af ey s°"Pn
n 3f
p+YwJe camtr.
wPowi Pe wPwwu Pu d
flo mea
M4 LI6ertY T'rFl d �'
Iso
4
MAP INDEX
TITLE SHEET
MAP NO.
w�er�
p
� g �
Ss%
a
PLAN SHEETS
d
LJ.P,naP
coPeA
TRAFFIC SIGNAL NOTES
wraW^p a
e�"
TRAFFIC SIGNAL PLAN SHEETS
+�
ywePn P+e �o
d
WYLER DR. - WYLER CT.
20-21
g`
h
J � �
i C fi YI. Phu Fawr PE
$x
i '.�
CdNJTnAp
24
qa R PWn+aaEp
LITERARY LN. - PILAR CT.
.YrPopa Ln 1WroP pd
� `L.jlt4� $
8
wresPJ
27-28
1'i
ERNEST WAY - GREAT NOVEL CT.
p'�$$
9re"Cm+b y rtnu or. az-
i
rurbpgnPe � mw
y3�pe�Ct]OOSS`iZd
OeYr�
Ri
is �APFPN F 3�
R F
obi Y
� I�-p,
STONERIDGE LN. - SHAMROCK BLVD.
e
R ewo'n gywq aE
Idl.p
MACBETH DR. - MACDUFF WAY
�
Q°"P'F°i"p
�P 9wNnWry P.e Lf �P
`vd
e,Cel Rp
ei P»T��I�
er+°
d
�Efin Q �AM,wn
of
4
,rwu1 R
MAINTENANCE PROGRAM
u.ew.p Ri iRpELQbJ QO
eF1„p $ ry'eln�
1]J Lee�p 4
�.w �WierNWp
P
PUWIn �StlYm Bargtl
pMlebrp _ (yry Wry
d � weep
R b 4 af ey s°"Pn
n 3f
p+YwJe camtr.
wPowi Pe wPwwu Pu d
flo mea
M4 LI6ertY T'rFl d �'
Iso
4
MAP INDEX
TITLE SHEET
MAP NO.
w�er�
p
� g �
Ss%
a
PLAN SHEETS
d
.s R
yvw- AN wiii�
TRAFFIC SIGNAL NOTES
wraW^p a
e�"
TRAFFIC SIGNAL PLAN SHEETS
+�
ywePn P+e �o
d
WYLER DR. - WYLER CT.
20-21
g`
_ d
.
"�
i C fi YI. Phu Fawr PE
$x
i '.�
Py � y {b
mnwwPa
CPmp
24
qa R PWn+aaEp
LITERARY LN. - PILAR CT.
.YrPopa Ln 1WroP pd
� `L.jlt4� $
8
wresPJ
27-28
1'i
ERNEST WAY - GREAT NOVEL CT.
F`Y'
9re"Cm+b y rtnu or. az-
i
±
WPJj° `'°°'fid g •�
® ® 8 8f 1
9'*v LYwPi
VmuFp RP
fi b
1 ' +y) • �tbl
j 151
P R.PoR riQ 1"= qm Al.iM
LOCATION MAP
NTS
PHASE II
19-001-C I P
SHEET INDEX
MAP INDEX
TITLE SHEET
MAP NO.
w�er�
� g �
d-62
PLAN SHEETS
d
Oi �• � @ Rp $ �� �
8
TRAFFIC SIGNAL NOTES
TRAFFIC SIGNAL PLAN SHEETS
64-71
WYLER DR. - WYLER CT.
20-21
g`
WYNWRIGHT DR. - WYNWRIGHT CT.
22-23
3
Y spa f'
I "' a
24
7
LITERARY LN. - PILAR CT.
.YrPopa Ln 1WroP pd
� `L.jlt4� $
8
wresPJ
27-28
5
ERNEST WAY - GREAT NOVEL CT.
29-30
10
frr
$$ weu r-_PFw
� �
b
OeYr�
S. HIGH ST. - PINNEYHILL LN. - S. BLACKSMITH LN. - WING HILL - NORTH. ST.
is �APFPN F 3�
R F
obi Y
12
STONERIDGE LN. - SHAMROCK BLVD.
urK`Pa ��brL� g eeeR'rP ye."Pwaema ts' rA
1Ww'sbulnw weawnio- E. iq
-+5,
Idl.p
MACBETH DR. - MACDUFF WAY
yJ�O }�,nrM91
Q°"P'F°i"p
�P 9wNnWry P.e Lf �P
`vd
e,Cel Rp
43-45
er+°
GRXJI)):F� PW""� `r�� g a^� cwep
v
46-48
16
wy,ryFW m
a Y9
,MrPe
ABBOTSFORD DR. - CASTLEBAY DR.
p
9 � ^rt)r �' `yry. � SNre CowM
TULLER RIDGE RD.
54-55
19
fh"- } W ybWPs P yyelwen
56
g p
_ wvEenM'M"v&o
a Y
��"�Pyixew FA is H�
AA - S134
MT - 110.10
g
�P i VIMaTPe�
t./ g
0�p
�r CfSYj,
Mwe7ti
X21 '2iJ ggeyMi
AA - S159
�q MlN ws
C�-,n l:l
— Phase II r
LOCATION MAP
NTS
PHASE II
19-001-C I P
SHEET INDEX
MAP INDEX
TITLE SHEET
MAP NO.
GENERALNOTES
GENERAL SUMMARY
d-62
PLAN SHEETS
CURB RAMP IMPROVEMENTS
TRAFFIC SIGNAL NOTES
TRAFFIC SIGNAL PLAN SHEETS
64-71
STANDARD CONSTRUCTION DRAWINGS
MAP INDEX
MAP NO.
LOCATION
SHEET NO.
1
SUMMIT VIEW RD.
15
2
ANGELES DR. - MANTEO DR.
16-18
3
LIDO CT.
19
4
WYLER DR. - WYLER CT.
20-21
5
WYNWRIGHT DR. - WYNWRIGHT CT.
22-23
6
KEILER CT.
24
7
LITERARY LN. - PILAR CT.
25-26
8
KILIMANJARO CT. - CARRICK CT.
27-28
9
ERNEST WAY - GREAT NOVEL CT.
29-30
10
STARKEYS CT. - NATURE DR. - FOREST RUN CT. - TIMBERVIEW DR.
31-34
11
S. HIGH ST. - PINNEYHILL LN. - S. BLACKSMITH LN. - WING HILL - NORTH. ST.
35-37
12
STONERIDGE LN. - SHAMROCK BLVD.
38-40
13
MACBETH DR. - MACDUFF WAY
41-42
14
HARD RD.
43-45
15
BRYSON COVE CIR. - CLOVER PARKWAY - LOCH DUNNE PL.
46-48
16
INVERURIE DR. W. - CAITHNESS DR. - DUNSKEATH CT. - MONIFIETH CT.
49-51
17
ABBOTSFORD DR. - CASTLEBAY DR.
52-53
18
TULLER RIDGE RD.
54-55
19
BRAND RD.
56
STANDARD CONSTRUCTION DRAWINGS
CITY OF DUBLIN
CITY OF COLUMBUS
ODOT
SUPPLEMENTAL
MD -05
RD -01
AA -5120
MT -95.30
BP -3.1
SPECIFICATIONS
PD -02
RD -02
AA -5121
MT -95.31
ODOT 800
PD -03
RD -03
AA -5123
MT -95.32
HL -30.11
ODOT 816
PD -04
RD -05
AA-S125A
MT -97.10
HL -30.22
ODOT 907
PD -05
RD -06
AA -5126
MT -97.11
ODOT 916
PD -06
RD -07
AA -5129
MT -97.12
TC -41.20
PD -07
RD -11
AA-S133A
MT -99.20
TC -42.20
PD -08
AA-S133B
MT -105.10
TC -82.10
AA - S134
MT - 110.10
TC - 83.20
AA - S142
AA - S159
City of Dublin
OHIO, USA
PROJECT DESCRIPTION
PAVEMENT RESURFACING, PAVEMENT RECONSTRUCTION,
CURB RECONSTRUCTION, SIDEWALK RECONSTRUCTION, AND
PEDESTRIAN SIGNAL RECONSTRUCTION OF VARIOUS CITY ROADS.
�r r4l I�
-
\
v Before You Dlg
GPD GROUPe
3IPu; Pylq ikh...L Berra; W OP l Inc
201 Watermark Drive, Sutter 210
Lolunbi Ohio 93215
6142100751 Fax 614 210