Loading...
HomeMy WebLinkAboutResolution 065-17RECORD OF RESOLUTIONS Dayton Legal Blank, Inc., Form No. 30045 Resolution No. 65-17 Passed A RESOLUTION ACCEPTING THE LOWEST AND BEST BID FOR THE BRIDGE MAINTENANCE — DUBLIN RECREATION CENTER AND MUIRFIELD DRIVE AT DUBLINSHIRE DRIVE PROJECT WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Revised Charter and Chapter 37 of the Dublin Code, for the Bridge Maintenance — Dublin Recreation Center and Muirfield Drive at Dublinshire Drive Project; and WHEREAS, Council has determined that the bid submitted by Complete General Construction Company constitutes the lowest and best bid. 20, NOW THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, T / of its elected members concurring, that: Section 1. The bid submitted by Complete General Construction Company in the total amount of $255,673.00 is hereby accepted. Section 2. The City Manager is hereby authorized to enter into contracts with Complete General Construction Company for performance and completion of the Bridge Maintenance — Dublin Recreation Center and Muirfield Drive at Dublinshire Drive Project, pursuant to the Advertisement, Proposal and Contract Documents for said project on file in the office of the City Engineer. Section 3. This Council further hereby authorizes and directs the City Manager, the Director of Law, the Director of Finance, the Clerk of Council, or other appropriate officers of the City to prepare and sign all other agreements and instruments and to take any other actions as may be necessary to implement this Ordinance and complete the Project. Section 4. This Resolrse n shall take effect upon passage in accordance with Sec o 4.04(a) of the d Charter. P s d this - ay of ��2017. ayor - PreVi�Jing Officer ATTEST: Clerk of Council From: Dana L. McDaniel, City Manag R711 Initiated Bys, Paul A. Hammersmith, P.E., Director of Engineering/City Engineer Kenneth B. Richardson, P.E., P.S., Senior Civil Engineer Re,: Resolut'l'on No., 65-17 Bri*dger Mal'ontenance — Dubfin Recreatl"on Center and Muirfield Drive at Dubl"Inshl"re Drl'"ve Bid Acceptance The Engineer's estimate Is $240,000.00. The budgeted funds for this construction project are from the 2017 Capital Improvement Program (CIP) AT17C Annual Bridge Maintenance and total $405,000.00. Complete General Construction Company submitted the lowest and best bid of $255,673.00. Staff has reviewed all bids and a summary of the bids is listed below. Mid as Read Bidder Wid as Read Over (+) or Under (-) I Corrected Bid Enaineer"s Estimate 1 Complete General Construction t'oTpa $255f673-00 py_ ------ Double Z Construction any $262,252.51 +9.3% For Council-s reference and review, a reduced set of project construction drawings has been placed in the Council Planning Room. The higher bids above our Engineer"s estimate can be attributed to the stone veneer work exceeding our estimate by over $17,000. The need to minimize the time of the tunnel and bridge closure likely caused a premium to the bid. We believe Complete General Construction Company's bid for the stone veneer work is reasonable. Bridge Maintenance — Dublin Recreation Center and Muirfield Drive at Dublinshire Drive Bid Acceptance September 7., 2017 Page 2 of 2 Staff has thoroughly reviewed the bid from Complete General Construction Company. Previous experience with Complete General Construction Company has been very favorable, including these recent projects: SR 161/Riverside Drive Roundabout (Part 1) and Riverside Drive Realignment North High Street Widening; and Tunnel Improvements — Carnoustie Drive at Preston Mill Way. Staff recommends Council approval of Resolution No. 65-17, accepting as lowest and best the bid of Complete General Construction Company in the amount of $255,,673.00 and authorizing the City Manager to enter into a contract with Complete General Construction Company for this project.