Loading...
HomeMy WebLinkAboutResolution 066-16RECORD OF RESOLUTIONS Dayton Legal Blank, Inc., Form No. 30045 Resolution No. 66-16 Passed , 20 A RESOLUTION ACCEPTING THE LOWEST AND BEST BID FOR THE TUNNEL IMPROVEMENTS — CARNOUSTIE DRIVE AT PRESTON MILL WAY PROJECT WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Revised Charter and Chapter 37 of the Dublin Code, for the Tunnel Improvements — Carnoustie Drive at Preston Mill Way Project; and WHEREAS, Council has determined that the bid submitted by Complete General Construction Co. constitutes the lowest and best bid. NO_ v THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, of its elected members concurring, that: Section 1. The bid submitted by Complete General Construction Co. in the total amount of $380,742.65 is hereby accepted. Section 2. The City Manager is hereby authorized to enter into contracts with Complete General Construction Co. for performance and completion of the Tunnel Improvements — Carnoustie Drive at Preston Mill Way Project pursuant to the Advertisement, Proposal and Contract Documents for said project on file in the Office of the City Engineer. Section 3. This Council further hereby authorizes and directs the City Manager, the Director of Law, the Director of f=inance, the Clerk of Council, or other appropriate officers of the City to prepare and sign all other agreements and instruments and to take any other actions as may be necessary to implement this Resolution and complete the Project. Section 4. This Resolution shall take effect upon passage in accordance with Section 4.04(x) of the Devised Charter. PasVq'cl thiss�%' Z( Y of _U��',f�.✓�.t�, 2016. ayor - Presiding officer ATTEST: Clerk of Council AMIL Officae; of the City Manager 1200 Emerald Parkway* Dublin, OH 43017-1090 Citty of Dublin Phone: 614-410-4400 o Fax: 614-410-4490 Tol: Members of Dublin City Council From,,, Dana L. McDaniel, City Mana 11F i��w J11 Initiated By.,, Paul A. Hammersmith, P,,E,, Director of Engineering/City Engineer Kenneth B. Richardson, P.E., P.S., Senior Civil Engineer Rem, Resolution No. 66-16 - Tunnel Improvements — Carnoustie Drive ei Preston Mill Way - Bid Acceptance On November 22, 2016,, four (4) bids were received, publicly opened and read for the Tunnel Improvements — Carnoustie Drive at Preston Mill Way project. This project involves the removal of the existing stone clad slopes at each entrance to the existing 108-inch diameter tunnel and construction of a cast-in-place concrete retaining wall with synthetic stone facing at each entrance to the tunnel. New guardrail will replace the old guardrail on Carnoustle Drive. Complete General Construction Co. submitted the lowest and best bid of $380,742.65. Staff has reviewed all bids and a summary of the bids is listed below. Bidder Complete General Construction Co. Bid as Read Bid as Read Over or Under E aginmr's Estimate $380,742-65 -3.6% Corrected Bid Rig The titer Co., Inc. $386,f718.00 -21% Danbert, Inc. $422,468.80 +7.0% Shelly & Sands, Inc. $434,443-80 +10 00 0% FS For Council's reference and review, a reduced set of project construction drawings has been placed z �n the Council Planning Room. Staff anticipates the construction to commence in February 2017. Carnoustie Drive will remain open to traffic for the duration of the construction. The scheduled completion date for the project Res 66-16 - Tunnel Improvements — Carnoustie Drive at Preston Mill Way - Bid Acceptance December 1. 2016 Page 2 of 2 is May 19, 2017. The existing Muirfield Association"s path through the tunnel will be closed with appropriate barricades for the duration of the construction period.