HomeMy WebLinkAboutResolution 060-16RECORD OF RESOLUTIONS Dayton Legal Blank, Inc., Form No. 30045 Resolution No. 60-16 Passed , 20 A RESOLUTION AUTHORIZING THE CITY MANAGER TO ENTER INTO A REIMBURSEMENT AGREEMENT WITH EDWARD A. POLLINA CONSTRUCTION, LLC. FOR A PUBLIC SANITARY SEWER EXTENSION (7100 AVERY ROAD) WHEREAS, the City of Dublin desires to implement the Public Water Utility and Sanitary Sewer Utility Extensions to Existing Developed Properly Policy C"Policy'�; and WHEREAS, the "Policy" identified Area 14 with the need for an 8 -inch sanitary sewer extension to the North Fork Indian Run sanitary sewer system; and WHEREAS, the 8 -inch Public Sanitary Sewer Extension is contemplated at this time to provide benefits to the community in terms of protecting the environment, public health, and public utility systems; and WHEREAS, the City of Dublin and Edward A. Pollina Construction, LLC. have agreed to plan and construct the sanitary sewer improvements. NO , THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, of its elected members concurring, that: Section 1. The City Manager is hereby authorized to enter into a Reimbursement Agreement with Edward A. Pollina Construction LLC. for a public sanitary sewer extension (7100 Avery Road). Section 2. This resolutio shall take effect upon passage in accordance with Section 4.04(a) of the Revi� d Charter. this LS-t djof : O L) e-N/L/�. 2016. Mayor - Presidi ATTEST: 'Mal jig Clerk of Council C ityof Dublin it OMce of the Cloty Manager 5200 Emerald Parkway # Dublin, OH 43017-109# Phone: 614-410-4400 9 Fax.: 614-410-4490 late.,v November 17, 2011 Re: Resolution 60-16 - Authorizing the City Manager to Enter into a Reimbursement Agreement with Edward A,. PoIllina Construction., LLC, for a Public Sanitary Sewer Extension (7100 Avery Road) Since the adoption of the Policy, 7136 Avery Road which is located in Area 14, has connected to public sanitary sewer service. This leaves three remaining properties in Area 14 needing public ;anitary sewer access, with 7100 Avery Road being one of them, A- 'taff was contacted by Edward A. Pollina Construction, LLC. ("Developer), in late 2015, who i.= building a new home at 7100 Avery Road, which would require an 8-inch sanitary sewer extension Memo re. Res 60-16 — Reimbursement Agreement with Edward A. Pollina Construction C. for a Public Sanitary Sewer Extension (7100 Avery Road) November 17, 2016 Page 2 of 2 The Developer plans to begin work upon execution of this agreement, obtaining City of Columbus approval of the construction plans and approval of an Ohio Environmental Protection Agency Perm it-to-Insta I I. Connection to the public sanitary sewer system will be required for 7100 Avery Road and an HSTS will not be permitted on this property. r4 Staff recommends approval of Resolution 60-16,, authorizing the City Manager to enter into a Reimbursement Agreement with Edward A. Pollina Construction, LLC. for a Public Sanitary Sewer Extension (7100 Avery Road). This agreement is in furtherance of Council's goal to protect the public health, safety, and welfare of the Dublin community and minimize the potential threat to public health and welfare that may be associated with a private FISTS. This Reimbursement Agreement (the "Agreement ") dated , 2016, is entered into by the CITY OF DUBLIN, OHIO ( "Dublin "), a munici al corporation duly organized and validly existing under the Constitution and laws of the State of Ohio and its Charter and EDWARD A. POLLINA CONSTRUCTION, LLC. ( "Developer" and collectively with Dublin, the "Parties "). WHEREAS, the Developer is presently engaged in the improvement of certain land in the City of Dublin, Ohio, specifically the construction of a single - family home at 7100 Avery Road (the "Development "); and WHEREAS, the Development requires the extension and of a public 8 -inch a sanitary sewer; and WHEREAS, the sanitary sewer extension will consist of the design and construction of an 8 -inch sanitary sewer, 3 manholes, and appurtenances commencing from an existing manhole located along the south side of Manteo Drive and west of Avery Road, then extending east through Reserve "B" of Wexford Estates, Section 1, then extending east beneath Avery Road, and lastly extending south along the eastern right -of -way line of Avery Road, including a sanitary sewer service connection to the Development (the "Sanitary Seiner Extension "); and WHEREAS, the Sanitary Sewer Extension is contemplated at this time to realize additional benefits to the sanitary sewer system in terms of providing service to two additional properties (7050 and 7070 Avery Road) located immediately south of the Development; and WHEREAS, the Developer is willing to design and construct the Sanitary Sewer Extension and Dublin has agreed to reimburse the Developer a proportionate share of the design cost (the total of which is presently estimated at $9,458.00) and construction cost (the total of which is presently estimated at $58,854.40) as provided below. NOW THEREFORE, the Parties covenant, agree and obligate themselves as follows: 1. Developer commits to: • Create construction plans and specifications (the "Design ") for the Sanitary Sewer Extension to the Development and submit for Dublin's review and approval, and fund the Design. • Create the deeds, legal descriptions and exhibits for the necessary temporary construction and permanent sanitary sewer easements. • Obtain necessary approvals from the City of Columbus and the Ohio Environmental Protection Agency (OEPA) • Obtain Notice of Intent, if applicable. • Solicit for bids, fund and manage the construction (the "Construction ") of the Sanitary Sewer Extension. {H2111532.2 } • Use best efforts to commence Construction of the Sanitary Sewer Extension in 2016. • Restore properties after Construction to the same or better condition as existed prior to Construction. • Provide an invoice for reimbursement for the actual cost of Design of Construction. • Provide necessary temporary construction and permanent sanitary sewer easements on the Development property prior to the commencement of construction of the Sanitary Sewer Extension. • The cost of any design modifications and construction change orders immediately being brought to Dublin's attention. 2. The Dublin commits to: • Record the permanent sanitary sewer easement(s) at the Franklin County Recorder's Office. • Reimburse to the Developer fifty percent (50 %) of the actual Design cost of the Sanitary Sewer Extension, presently resulting in an estimated reimbursement amount of $4,729.00. • Reimburse to the Developer sixty -seven (67 %) of the actual Construction cost of the portion of the Sanitary Sewer Extension from the existing manhole located along the south side of Manteo Drive and west of Avery Road, extending east through Reserve `B" of Wexford Estates, Section 1, and extending east beneath Avery Road to the northwest corner of the Development, presently resulting in an estimated reimbursement amount of $25,833.48. • Inspect the construction of the Sanitary Sewer Extension. • Make reimbursement to the Developer within thirty days of the Developer providing both as -built construction drawings and an invoice for reimbursement to Dublin. 3. Indemnification and Hold Harmless. The Developer agrees to defend, indemnify, protect and hold harmless Dublin, its elected officials, officers, employees, agents, and volunteers from and against any liability for all actions, claims, losses, damages, costs and /or expenses (including reasonable attorney's fees) to the extent that such actions, claims, losses, damages, costs and /or expenses arise out or are in any way caused by the performance or non- performance of this Agreement, either directly or indirectly, irrespective of whether such actions, claims, losses, damages, costs and /or expenses are caused by the acts, omissions or conduct of the Developer or its employees, agents and representatives. 4. Notices. Except as otherwise specifically set forth in this Agreement, notices, demands, requests, consents or approvals given, required or permitted to be given hereunder shall be in writing and shall be deemed sufficiently given if actually received or if hand - delivered or sent by recognized, overnight delivery service or by certified mail, postage prepaid and return receipt requested, addressed to the other Parties at the addresses set forth in this Agreement or any addendum to or counterpart of this Agreement, or to such other addresses as the recipients shall have previously notified the sender of in writing, {H2111532.2 }2 and shall be deemed received upon actual receipt, unless sent by certified mail, in which event such notice shall be deemed to have been received when the return receipt is signed or refused. A duplicate copy of each notice, certificate, request or other communication given hereunder to the Parties shall be given also to the others. The Parties, by notice given hereunder, may designate any further or different addresses to which subsequent notices, certificate, requests or other communications shall be sent. (a) As to Dublin: City of Dublin, Ohio Attention: Paul A. Hammersmith, P.E., Director of Engineering/ City Engineer 5800 Shier -Rings Road Dublin, Ohio 43016 -7295 (b) As to Developer: Edward A. Pollina Construction, LLC. Attention: Edward A. Pollina 4301 Reynolds Drive Hilliard, Ohio 43026 5. Extent of Provisions Regarding the Parties; No Personal Liability. No representation, warranty, covenant, agreement, obligation or stipulation contained in this Agreement shall be deemed to constitute a representation, warranty, covenant, agreement, obligation or stipulation of any present or future trustee, member, officer, agent or employee of the Parties in an individual capacity, and to the extent authorized and permitted by applicable law, no official executing or approving the Parties' participation in this Agreement shall be liable personally under this Agreement or be subject to any personal liability or accountability by reason of the issuance thereof. 6. Binding Effect. This Agreement shall inure to the benefit of and shall be binding upon the Parties, and their respective permitted successors and assigns. The Parties will observe and perform faithfully at all times all covenants, agreements and obligations under this Agreement. 7. Governing LawNenue: This Agreement shall be governed by and construed in accordance with the laws of the State of Ohio, without giving effect to the principles thereof relating to conflicts or choice of laws. (H2111532.2 }3 Edward A. Po Construction, LLC. Edward A. Po ina City of Dublin, Ohio Dana L. McDaniel, City Manager Approved as to form: Jennifer D. Readler, Law Director (H2111532.2 )4 Date Date Date Water /Sewer Extension Areas Utility Extension Areas General Location Map =] Sewer Only August 3, 2015 � Sewer and Water City of Dublin =1 Water Only f 4� 0 ;, A .. 1 � L an 3 2017 Sanitary Sewer Extension Area 14 Sewer Only 11/8/2016 City of Dublin w�e 1 inch = 100 feet ENGINEERING Legend V • Ex. San. Manholes • Prop. San. Manholes Ex. San. Lift Stations Prop. Lift Stations - - - - - -- Ex. San. Mains Prop. San. Mains + Ex.FH t Prop.FH • Ex. Valve • Prop. Valve — — Ex. WM Prop. WM — • Ex. Stm. Structures - - - - - -• Ex. Stm. Mains �i PROPERTY CONTACT EDWARD A. POLLINA CONSTRUCTION, LLC. EDWARD A. POLLINA 4301 REYNOLDS DRIVE HILLIARD, OHIO 43026 (614) 207 -6014 (C) BENCHMARKS (NAVD 88 REFERENCE BENCHMARK - O.D.O.T. "COLB ": THE STATION IS THE O.D.O.T. VRS RTK STATION "COLB ". LOCATED AT THE O.D.O.T. CENTRAL OFFICE GARAGE COMPLEX, CITY OF COLUMBUS, FRANKLIN COUNTY, OHIO. (LAT.39'57'35.11259N LONG: 83'02'44.74726W) ELEV.= 722.211 BM #1: IRON PIN SET 270' FEET SOUTHERLY ALONG THE CENTERLINE OF AVERY ROAD FROM THE INTERSECTION WITH MANTEO DRIVE AND 6.1 FEET EASTERLY FROM THE EASTERLY EDGE OF PAVEMENT. ELEV.= 920.35 BM #2: IRON PIN SET 99.5' NORTHEASTERLY FROM THE SOUTHWESTERLY CORNER OF RESERVE "B" IN WEXFORD ESTATES SECTION 1 AND 48.4' WESTERLY FROM THE WESTERLY EDGE OF THE EXISTING ASPHALT BIKEPATH. OHIO Utilities Protection SERVICE Call Before You Dig ELEV.= 918.87 UNDERGROUND UTILITIES CALL TWO WORKING DAYS BEFORE YOU DIG Call 800 - 362 -2764 (Toll Free) OHIO UTILITIES PROTECTION SERVICE NON— MEMBERS MUST BE CALLED DIRECTLY CITY OF DUBLIN, 2016 EXTENSION OHIO 10 \ UA G/$ i 7136 Avery Road \ , i PID: 2 73006 33 7 , Jeff R. Siefker J 0.893 Acres I.N. 201010010128978 0 g � C'G lr $ 1 / TOTAL TRIBUTARY \ BM #18 AREA 4.68 AC. to 7100 Avery Road _ — Reserve B" a P /D: 273000418 / 0.445 Acres III ' Vincent P. & Cynthia B. City of Dublin qm# � Lombardo Wexford Estates Sect. 1 l l I 30 2.30 Acres P.B. 77, Pg. 87 III _ — I.N. 201507280103271 - ll II I 7070 Avery Road — — 1 l l 9,4 l PID: 273000430 7055 AVERY ROAD II I Q Joseph D. Manchik I PID: 273001821 _ _ _ 1.35 Acres NORTHWEST ASSEMBLY I _ _ I.N. 200010260217213 OF GOD, INC. I I �-'I ' 6.000 ACRES — O. R. 14886 PG. E-01 III�� 7050 Avery Road PID: 273000443 , / 1 ' Gaylord E. Gardner, Jr. / 1.35 Acres I l.N. 200611220233486 Ogg y�o0 D 7" HILX DRI L —� �g VE INDEX /TRIBUTARY MAP SCALE: 1 " = 100' SHEET INDEX TITLE SHEET . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 GENERAL NOTES & ESTIMATE OF QUANTITIES . . . . . . . . . . . . . . . . . . . 2 SANITARY SEWER PLAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 SANITARY SEWER PROFILE . . . . . . . . . . . . . . . . . . . . . . . . . . 4 EROSION CONTROL PLAN . . . . . . . . . . . 5 G a� SITE M G r` } � w CITY OF DUBLIN LOCATION MAP SCALE: 1" = 1500' �o o co CD t co z �mav O• � a� a� � w U co tzb � V w W � O CV 0 co O U O O U V L b LO C\2 a W W T� V 1 APPROVALS SIGNATURES BELOW SIGNIFY ONLY CONCURRENCE WITH THE GENERAL PURPOSES AND W GENERAL LOCATION OF THE PROJECT AND DOES NOT CONSTITUTE ASSURANCE TO OPERATE I--1 AS INTENDED. ALL TECHNICAL DETAILS REMAIN THE RESPONSIBILITY OF THE PROFESSIONAL CIVIL ENGINEER PREPARING THE PLANS. CITY OF DUBLIN: CITY ENGINEER, CITY OF DUBLIN, OHIO DATE PAUL A. HAMMERSMITH, P.E. CITY OF COLUMBUS: APPROVAL ON THE PART OF THE CITY OF COLUMBUS IS GIVEN PURSUANT TO THE PROVISIONS OF THE SEWER SERVICE AGREEMENT WITH THE CITY OF DUBLIN, OHIO APRIL 13, 1993, ORD #2692 -92, AND ALL SUBSEQUENT AMENDMENTS THERE OF. THIS SANITARY SEWER MEETS OR EXCEEDS CITY OF COLUMBUS DESIGN STANDARDS (INCLUDING PER CAPITA FLOW, PEAKING FACTOR AND 1/1 ALLOWANCE) AND MATERIAL SPECIFICATIONS. ADMINISTRATOR, DIVISION OF SEWERAGE & DRAINAGE CITY OF COLUMBUS, OHIO DIRECTOR, DEPARTMENT OF PUBLIC UTILITIES CITY OF COLUMBUS, OHIO 10 tole] w0X1 to) z1 :1mDo tI IzIwwt? DATE DATE THIS IS TO CERTIFY THAT GOOD ENGINEERING PRACTICES HAVE BEEN UTILIZED IN THE DESIGN OF THIS PROJECT AND THAT ALL OF THE MINIMUM STANDARDS AS DELINEATED IN CITY OF DUBLIN ENGINEERING AND SURVEYING STANDARDS FOR SUBDIVISION DEVELOPMENT HAVE BEEN MET, INCLUDING THOSE STANDARDS GREATER THAN MINIMUM WHERE, IN MY OPINION, THEY ARE NEEDED TO PROTECT THE SAFETY OF THE PUBLIC. ANY VARIANCES TO THE ABOVE STANDARDS ARE CONSISTENT WITH SOUND ENGINEERING PRACTICE AND ARE NOT DETRIMENTAL TO THE PUBLIC SAFETY AND CONVENIENCE. PROFESSIONAL ENGINEER NO. DATE PM 735 16- 005 —RES DUBLIN CC -17537 z 0 z w Pq o o �o �z W�a 0 0 z P__4 O �4 P-1 1 REVISIONS 1 JOB NO. 2398 DRAWN BY TMW DESIGN BY TMW CHECKED BY CMT SHEET OF 5 1. City of Columbus and Ohio Department of Transportation Construction and Material Specifications, current editions, and any supplements thereto (hereafter referred to as Standard Specifications), shall govern all construction items unless otherwise noted. If a conflict between specifications is found, the more strict specification will apply as decided by the City Engineer. Item Numbers listed refer to City of Columbus Item Numbers unless otherwise noted. 2. The City Engineer will not be responsible for means, methods, procedures, techniques, or sequences of construction that are not specified herein. The City Engineer will not be responsible for safety on the work site, or for failure by the Contractor to perform work according to contract documents. 3. The Developer or Contractor shall be responsible to obtain all necessary permits including ut not limited to Ohio EPA Permits to Install PTI and Notices of Intent 9 (PTI) (NOI), Building Permits, etc. 4. The Contractor shall notify the City of Dublin Division of Engineering in writing at least 3 working days prior to beginning construction. 5. The Contractor shall be solely responsible for complying with all federal, state and local safety requirements including the Occupational Safety and Health Act of 1970. The Contractor shall exercise precaution always for the rotection of persons (including employees) and property. It shall also be the sole responsibility of the Contractor to initiate, maintain and supervise all safety requirements, precautions and programs in connection with the work, including the requirements for confined spaces per 29 CFR 1910.146. 6. Following completion of construction of the site improvements and before requesting occupancy, a proof survey shall be provided to the Division of Engineering that documents "as- built" elevations, dimensions, slopes and alignments of all elements of this project. The proof survey shall be prepared, signed and submitted by the Professional Engineer who sealed the constructions drawings. 7. The Contractor shall restrict construction activity to public right -of -way and areas defined as permanent and /or temporary construction easements, unless otherwise authorized by the City Engineer. 8. The Contractor shall carefully preserve benchmarks, property corners, reference points, stakes and other survey reference monuments or markers. In cases of willful or careless destruction the Contractor shall be responsible for restorations. Resetting of markers shall be performed by an Ohio Professional Surveyor as approved by the City Engineer. 9. Non - rubber tired vehicles shall not be moved on or across public streets or highways without the written permission of the City Engineer. 10. The Contractor shall restore all disturbed areas to equal or better condition than existed before construction. Drainage ditches or watercourses that are disturbed by construction shall be restored to the grades and cross - sections that existed before construction. 11. Tracking or spilling mud, dirt or debris upon streets, residential or commercial drives, sidewalks or bike paths is prohibited according to Section 97.38 of the Dublin Code of Ordinances. Any such occurrence shall be cleaned up immediately by the Contractor at no cost to the City. If the Contractor fails to remove said mud, dirt, debris, or spillage, the City reserves the right to remove these materials and clean affected areas, the cost of which shall be the responsibility of the Contractor. 12. Disposal of excess excavation within Special Flood Hazard Areas (100 -year floodplain) is not permitted. 13. All signs, landscaping, structures or other appurtenances within right-of-way disturbed or damaged during construction shall be replaced or repaired to the satisfaction of the City Engineer. The cost of this work shall be the responsibility of Y 9 P Y the Contractor. 14. All field tile broken or encountered during excavation shall be replaced or repaired and connected to the public storm sewer system as directed by the City Engineer. The cost of this work shall be the responsibility of the contractor. 15. All precast concrete products shall be inspected at the location of manufacture. Approved precast concrete products will be stamped or have such identification noting that inspection has been conducted by the City of Columbus. Precast concrete products without proof of inspection shall not be approved for installation. 16. Backfill within a 1:1 influence line of existing structures (houses, garages, etc.) or public infrastructure (pavement, curbs, sidewalks, bike paths, etc.) shall be compacted granular backfill according to Item 912 of the Standard Specifications or P 9 9 P Flowable CDF, Type III according to Item 636. Item 911 of the Standard Specifications shall be used elsewhere. 17. The Contractor shall submit a copy of the approved construction drawings and a list of proposed precast concrete product manufacturers to the City of Columbus Construction Inspection Division before commencing construction. Send the information to the following address: Construction Inspection Division City of Columbus 1800 East 17th Avenue Columbus, Ohio 43219 Send a copy of the transmittal letter to the following address: Division of Engineering City of Dublin 5800 Shier Rings Road Dublin, Ohio 43016 18. All trenches within public right -of -way shall be backfilled according to the approved construction drawings or securely plated during nonworking hours. Trenches outside these areas shall be backfilled or shall be protected by approved temporary fencing or barricades during nonworking hours. Clean up shall follow closely behind the trenching operation. 19. All trees within the construction area not specifically designated for removal shall be preserved, whether shown or not shown on the approved construction drawings. Trees to be preserved shall be protected with high visibility fencing placed a minimum 15 feet from the tree trunk. Trees 6 - inches or greater at DBH (Diameter Breast Height) must be protected with fencing placed at the critical root zone or 15 feet, whichever is greater. Trees not indicated on the approved construction drawings for removal may not be removed without prior approval of the Division of Engineering. 20. Conduit must be directionally bored across streets instead of open cut, unless specifically approved by the City Engineer. Use of pneumatic air ram devices is not permitted. Permits to construct in the right -of -way of existing streets must be obtained from the City of Dublin Division of Engineering before commencing construction. Should open cutting of existing pavement be permitted, Controlled Density Backfill (Type III) shall be used in place of compacted granular backfill, according to Item 636 of the Standard Specifications. 21. The Contractor shall be responsible for the condition of trenches within the right -of -way and public easements for a period of one year from the final acceptance of the work, and shall make any necessary repairs at no cost to the City. 22. Pavements shall be cut in neat, straight lines the full depth of the existing pavement, or as required by the City Engineer. Pavement replacement shall be conducted according to City of Columbus Standard Drawing 1441 Dr. A and applicable City of Dublin standard drawings. The replacement of driveways, handicapped ramps, sidewalks, bike paths, parking lot pavement, etc. shall be provided according to the approved construction drawings and City of Dublin standard construction drawings. 23. Tree trimming within the construction zone is to be completed by a certified Arborist. At the completion of the project, the Arborist is to return and trim an P P J � Y broken branches as needed. 24. Any modification to the work shown on drawings must have prior written approval by the City Engineer, City of Dublin. 25. All inlets shall be channelized. 26. Park areas shall be fine - graded and seeded with the following mixture: Improved Kentucky Bluegrass: 40% of weight (2 varieties in equal parts) Improved Perennial Rye: 60% of weight (2 varieties in equal parts) Germination Rate: 85% Application Rate: 7 Ibs per 1000 sq ft or as directed by the Division of Parks and Recreation, City of Dublin, Ohio. 27. Traffic control and other regulatory signs shall be Type S with a square post anchor base installation and meet all requirements of ODOT TC -41.20 and applicable City of Dublin specifications. 28. Street signs shall meet all City of Dublin specifications with lettering colored in white displayed over a brown background. Sign tubing shall be brown in color and conform with the Type S, square post anchor base installation requirements of ODOT TC- 41.20. 1. The following utilities are known to be located within the limits of this project: Water - City of Columbus AEP Division of Water Columbus Division 910 Dublin Road C 850 Tech Center Drive Columbus, Ohio 43215 (614) 645 -7788 (614) Ohio 43230 (614) 833 3 -6803 Storm and Sanitary - City of Dublin 5800 Shier Rings Road Dublin, Ohio 43016 (614) 410 -4600 SBC -ATT 11 North 4th St., Rm 802 Columbus, Ohio 43215 (614) 223 -7162 2. The Contractor shall give notice of intent to construct to Ohio Utilities Protection Service (telephone number 800 - 362 - 2764), Producers Underground Protection Service (telephone number 614 - 587 - 0486), and to owners of underground utilities that are not members of a registered underground protection service. Notice shall be given at least 2 working days before start of construction. 3. The identity and locations of existing underground utilities in the construction area have been shown on the approved construction drawings as accurately as provided by the owner of the underground utility. The City of Dublin and the City Engineer assumes no responsibility for the accuracy or depths of underground facilities shown on the approved construction drawings. If damage is caused, the Contractor shall be responsible for repair of the same and for any resulting contingent damage. 4. Location, support, protection and restoration of all existing utilities and appurtenances, whether shown or not shown on the approved construction drawings, shall be the responsibility of the Contractor. 5. When unknown or incorrectly located underground utilities are encountered during construction, the Contractor shall immediately notify the owner and the City Engineer. 6. Public street lighting may be in the vicinity of this project. Contact the City of Dublin, Division of Engineering at 410 -4637, two days prior to beginning work. 1. Traffic control shall be furnished, erected, maintained, and removed by the Contractor according to Ohio Manual of Uniform Traffic Control Devices (OMUTCD), current edition. 2. All traffic lanes of public roadways shall be fully open to traffic from 7:00 AM to 9:00 AM and from 4:00 PM to 6:00 PM unless authorized differently by the City Engineer. At all other hours the Contractor shall maintain minimum one -lane two -way traffic. Uniformed, off -duty police officers shall replace flagmen designated by the OMUTCD, and shall be present whenever one -lane, two -way traffic control is in effect. Police cruisers may be required as directed by the City Engineer. 3. If the City Engineer determines that the Contractor is not providing proper provisions for traffic control, the City Engineer shall assign uniformed, off -duty police officers to the project at no cost to the City. 4. Steady - burning, Type "C" lights shall be required on all barricades, drums, and similar traffic control devices in use at night. 5. Access from public roadways to all adjoining properties for existing residents or businesses shall be maintained throughout the duration of the project for mail, public water and sanitary sewer service, and emergency vehicles. The Contractor shall provide a traffic control plan detailing the proposed maintenance of traffic procedures. The traffic control plan must incorporate any traffic control details contained herein. The traffic control plan proposed by the Contractor must be approved by the City Engineer prior to construction. EROSION AND SEDIMENT CONTROL 1. The Contractor or Developer is responsible for submitting a Notice of Intent (N01) to be reviewed and approved by the Ohio EPA. The NOI must be submitted to OEPA 45 days prior to the start of construction and may entitle coverage under the Ohio EPA General Permit for Stormwater Discharges associated with construction activity. A project location map must be submitted with the NOI. A sediment and erosion control plan must be submitted to the City Engineer for approval if a sediment and erosion control plan has not already been included with the approved construction drawings. This plan must be made available at the project site at all times. The design of erosion control systems shall follow the requirements of Ohio EPA, Item 207 of Ohio Department of Transportation Standard Specifications, and the City Engineer. An individual NPDES Stormwater Discharge Permit may be required. The Contractor shall be considered the permittee. 2. The Contractor shall provide sediment control at all points where storm water runoff leaves the project, including waterways, overland sheet flow, and storm sewers. 3. Accepted methods of providing erosion /sediment control include but are not limited to: sediment basins, silt filter fence, aggregate check dams, and temporary ground cover. Hay or straw bales are not permitted. 4. The Contractor shall provide adequate drainage of the work area at all times consistent with erosion control practices. 5. Disturbed areas that will remain unworked for 30 days or more shall be seeded or protected within seven calendar days of the disturbance. Other sediment controls that are installed shall be maintained until vegetative growth has been established. The Contractor shall be responsible for the removal of all temporary sediment devices at the conclusion of construction but not before growth of permanent ground cover. 1. The Contractor must obtain a blasting permit from Washington Township Fire Department prior to blasting for rock excavation. The Contractor shall submit blasting reports upon completion of blasting to the City Engineer, the Owner, and the Owners engineer. Top of rock elevations shall be shown on "as- built" construction drawings. 1. Connections to the sanitary sewer will be permitted upon receiving an OEPA Permit to Install (PTI), and upon receiving a satisfactory letter from the design engineer stating that the project has been constructed as per the plans, and all of the conditions of the PTI have been met. The developer is responsible for obtaining all P P 9 required Ohio EPA approvals and paying review fees. 2. Sanitary sewage collection systems shall be constructed in accordance with the rules, regulations, standards and specifications of the City of Dublin, Ohio EPA, Ohio Department of Health and the current edition of the Great Lakes -Upper Mississippi River Board Ten States - Recommended Standards for Wastewater Facilities. 3. The minimum requirements for sanitary sewer pipe with diameters 15 inches and smaller shall be PVC sewer � i e ASTM D3034 SDR 35. Pie for 6 -inch diameter PP P house service lines shall be PVC � i e ASTM D3034 SDR 35. PVC pipe e shall not be PP P used at depths greater than 28 feet. Pipe materials and related structures shall be shop tested in accordance with City of Columbus Construction Inspection Division quality control requirements. 4. The minimum requirements for sanitary sewer pipes with diameters greater than 15 inches shall be reinforced concrete pipe ASTM C76 with Class designation specified in the approved construction drawings. 5. All in -line Wye and tee connections in concrete sewers, 18 -inch diameter and larger, shall be either Kor -N -Tee or Kor -N -Seal connections conforming to the manufacturer's recommendations. 6. Granular backfill shall be compacted granular material according to Item 912 of the Standard Specifications or Controlled Density Backfill according to Item 636, Type III of the Standard Specifications as directed by the City Engineer. 7. All manhole lids shall be provided with continuous self - sealing gaskets. The approved construction drawings shall show where bolt -down lids are required. Sanitary sewer manholes shall be precast concrete or as approved by the City Engineer and conform to the City of Dublin sanitary manhole standard drawing. Manhole lids shall include City of Dublin logo. 8. All PVC sewer pipes shall be deflection tested no less than 60 days after completion of backfilling operations. All other requirements shall be according to Item 901.21 of the Standard Specifications. 9. Temporary bulkheads shall be placed in pipes at locations shown on the approved construction drawings and shall remain in place until the Permit to Install (PTI) has been issued by the OEPA and the sewers have been approved for use by the City Engineer. The cost for furnishing, installing, maintaining, and removing bulkheads shall be included in the contract unit bid rice for the various sanitary sewer items. P Y 10. All sanitary sewers including sanitary sewer service lines shall be subjected to and pass infiltration or exfiltration tests according to Item 901 of the Standard Specifications and must be approved for use by the City Engineer before any service connections are tapped into sewers. 11. For sanitary sewer infiltration, leakage through joints shall not exceed 100 gallons per inch of tributary sewer diameter per 24 hours per mile of length or the computed equivalent. All sanitary sewers shall be tested. 12. At the determination of the City Engineer, the Contractor may be required to perform a TV inspection of the sanitary sewer system prior to final acceptance by the City. This work shall be completed by the Contractor at his expense. 13. Visible leaks or other defects observed or discovered during TV inspection shall be repaired to the satisfaction of the Engineer. 14. Roof drains, foundation drains, field tile or other clean water connections to the sanitary sewer system are strictly prohibited according to Section 51.23 of the Dublin Code of Ordinances. 15. All water lines shall be located at least 10 feet horizontally and 18 inches vertically, from sanitary sewers and storm sewers, to the greatest extent practicable. Where sanitary sewers cross water mains or other sewers or other utilities, trench backfill shall be placed between the pipes crossing and shall be compacted granular material according to Item 912 of the Standard Specifications. In the event that a water line must cross within 18 inches of a sanitary sewer, the sanitary sewer shall be concrete encased or consist of ductile iron pipe material. 16. Service risers shall be installed where the depth from wyes to proposed ground elevation exceeds 10 feet. Tops of risers shall be no less than 9 feet below proposed ground elevation if basement service is intended. 17. Where service risers are not installed, a minimum 5 -foot length of sanitary sewer service pipe of the same size as the Wye opening shall be installed. 18. The Contractor shall furnish and place, as directed, approved Wye poles made of 2 inches x 2 inches lumber at all Wye locations, ends of extended services, or at the end of each riser where risers are required. Wye poles shall be visible before acceptance by the City. The cost of these poles shall be included in the contract unit price for the various sewer items. 19. Existing sanitary sewer flows shall be maintained at all times. Costs for pumping and bypassing shall be included in the Contractors unit price bid for the related items. 20. The Contractor shall furnish all material, equipment, and labor to make connections to existing manholes. The sewer pipe to manhole connections for all sanitary sewers shall be flexible and watertight. All holes shall be neatly cored. The sewer pipe barrel at the s rin line shall not extend more than 1 inch beyond the inside face P 9 Yo of the manhole. To maintain flexibility in the connection, a 1 -inch space shall be left between the end of the pipe inside the manhole and the concrete channel; this space shall be filled with a waterproof flexible joint filler. Any metal that is used shall be Type 300 Series Stainless Steel. The connection may be any of the following types: A. Rubber sleeve with stainless steel banding. 1) Kor -N -Seal as manufactured by National Pollution Control Systems, Inc. 2) Lock Joint Flexible Manhole Sleeve as manufactured by Interpace Corporation. 3) Or equal as approved by the City Engineer. B. Rubber gasket compression. 1) Press Wedge II as manufactured by Press -Seal Gasket Corporation. 2) Dura Seal III as manufactured by Dura Tech, Inc. 3) Link -Seal as manufactured by Thunderline Corporation. 4) Or equal as approved by the City Engineer. The cost for this work along with a new channelized base for the manhole shall be included in the unit bid price for the related items of work. 1. All water line materials shall be provided and installed according to current specifications of the City of Columbus Division of Water. 2. All public water pipe with a diameter 3 inches to 8 inches shall be Ductile Iron, Class 53. Public water pipe 12 inches in diameter or larger shall be Ductile Iron, Class 54. Public water pipe 20 inches in diameter or larger may be prestressed concrete pipe. Private water pipe shall meet the approval of the City of Columbus Division of Water prior to approval of the construction drawings. 3. Only fire hydrants conforming to City of Columbus standards will be approved for use. 4. Public water lines shall be disinfected by the City of Columbus Division of Water. Requests for water line chlorination shall be made through the City of Dublin Division of Engineering. The cost for chlorination shall be paid for by the Contractor. 5. All water lines shall be disinfected according to Item 801.13 of the Standard specifications. Special attention is directed to applicable sections of American Water Works Association specification C -651, particularly for flushing (Section 5) and for chlorinating valves and fire hydrants (Section 7). Pressure testing shall be performed in accordance with Section 801.12 of the City of Columbus Construction and Material Specifications. When water lines are ready for disinfection, the City of » » Dublin shall submit two 2 sets of as -built Ions and a letter stating that the () plans, 9 water lines have been pressure tested and need to be disinfected, to the City of Columbus, Division of Water. The Contractor shall be responsible for all costs associated with the disinfection of all water lines construction per this plan. Pressure testing shall be performed in accordance with Section 801.12 of the City of Columbus Construction and Material Specifications. 6. The Contractor shall paint all fire hydrants according to City of Dublin standards. The cost of painting fire hydrants shall be included in the contract unit price for fire hydrants. 7. No water taps or service connections (e.g., to curb stops or meter pits) may be issued until adjacent public water lines serving the construction site have been disinfected by the City of Columbus Division of Water and have been accepted by the City Engineer. A tap permit for each water service must be obtained from the City of Dublin and the City of Columbus Division of Water before making any taps into public water lines. 8. The Contractor shall notify the City of Columbus Division of Water at 645 -7788 and the City of Dublin Division of Engineering at least 24 hours before tapping into existing water lines. 9. All water main stationing hall be based on street centerline stationing. 9 9 10. All bends, joint deflections and fittings shall be backed with concrete per City of Columbus standards. 11. The Contractor shall give written notice to all affected property owners at least 1 working day but not more than 3 working days prior to any temporary interruption of water service. Interruption of water service shall be minimized and must be approved by the City Engineer. 12. Water meters shall be installed inside proposed structures unless a meter pit installation is approved by the City of Columbus Division of Water. Meter pits must conform to standard drawings L -7103, A &B for 5/8" through 1" meters or L -6317, A. B. C &D for 1 -1/2" or larger meters. 13. Water lines to be installed in embankment areas shall be placed after the embankment has been placed and compacted according to the Standard Specifications. 14. Curb stop boxes shall be located at least 1 foot inside the right -of -way and set at finished grade. 15. If the top of the operating nut of any valve is greater than 36 inches below finished grade, an extension stem shall be furnished to bring the top of the operating nut to within 24 inches of finished grade elevation. 16. All water lines shall be placed at a minimum depth of 4 feet measured from top of finished grade to top of water line. Water lines shall be set deeper at all points where necessary to clear existing or proposed utility lines or other underground restrictions by a minimum of 18 inches. 17. Two '/ inch taps shall be installed within 2 feet of the end of the line on all dead -end water lines. 1. All storm water detention and retention areas and major flood routing swales shall be constructed to finish grade and hydro- seeded and hydro- mulched according to Items 203 and 659 of the Standard Specifications. 2. Where private storm sewers connect to public storm sewers, the last run of private storm sewer connecting to the public storm sewer shall be Reinforced Concrete Pipe conforming to ASTM Designation C76, Wall B. Class IV for pipe diameters 12 inches to 15 inches, Class III for 18 inches to 24 inch pipes, and 27 inches and larger pipe shall be Class II, unless otherwise shown on the approved construction drawings. Inspection is required by the City of Dublin's Division of Engineering. 3. Granular backfill shall be compacted granular material according to Item 912 of the Standard Specifications or Controlled Density Backfill according to Item 636, Type III of the Standard Specifications as directed by the City Engineer. 4. All storm sewers shall be Reinforced Concrete Pipe conforming to ASTM Designation C76 Wall B Class IV for P i P e diameters 12 inches to 15 inches Class III for 18 inches to 24 inch pipes, and 27 inches and larger pipe shall be Class II, unless otherwise shown on the approved construction drawings. 5. Headwalls and endwalls shall be required at all storm sewer inlets or outlets to and from stormwater management facilities. Natural stone and /or brick approved by the City Engineer shall be provided on all visible headwalls and /or endwalls surfaces. 6. Storm inlets or catch basins shall be channelized and have bicycle safe grates. Manhole lids shall include City of Dublin logo and all curb inlet and catch basin grates shall indluce engraved lettering: 'DUMP NO WASTE; DRAINS TO RIVER." 7. Storm sewer outlets greater than 18 inches in diameter accessible from stormwater management facilities or watercourses shall be provided with safety grates, as approved by the City Engineer. MAIL DELIVERY 1. The Contractor shall be responsible to ensure that US Mail delivery within the project limits is not disrupted by construction operations. This responsibility is limited to relocation of mailboxes to a temporary location that will allow the completion of the work and shall also include the restoration of mailboxes to their original location or approved new location. Any relocation of mailbox services must be first coordinated with the US Postal Service and the homeowner. 2. Before relocating any mailboxes, the Contractor shall contact the U.S. Postal Service and relocate mailboxes according to the requirements of the Postal Service. 1. The Contractor shall make proper arrangements with the Dublin Service Department and the Columbus Division of Water for the use of fire hydrants when used for work performed under this contract and provide the city of Dublin a copy of the Hydrant Usage Permit obtained from the City of Columbus. The Contractor shall also send a copies of permits obtained from Dublin and Columbus to the Washington and /or Perry Township Fire Department. Permits shall be kept at the construction site at all times. 2. Before the final estimate is paid, the Contractor shall submit a letter from the City of Columbus Division of Water to the City Engineer stating that the Contractor has returned the Siamese Valve to the City of Columbus and has paid all costs arising from the use of the fire hydrants. ESTIMATE OF QUANTITIES Time Warner Cable Columbia Gas Colu Colu 3760 Interchange Road Dublin Road Columbus, Ohio 43204 Columbus, Ohio 43215 (614) 481 -5262 (614) 481 -1058 CURB & GUTTER INLET SEDIMENT FILTER 452 8 WOW PORTLAND CEMENT CONCRETE PAVEMENT 6" DRIVEWAY APPROACH Frontier Communications 3675 Coorporate Drive 500 Lancaster Pike Columbus, Ohio 43231 Circleville, Ohio 43113 (614) 948 -4616 740 474 -7197 1 EA 2. The Contractor shall give notice of intent to construct to Ohio Utilities Protection Service (telephone number 800 - 362 - 2764), Producers Underground Protection Service (telephone number 614 - 587 - 0486), and to owners of underground utilities that are not members of a registered underground protection service. Notice shall be given at least 2 working days before start of construction. 3. The identity and locations of existing underground utilities in the construction area have been shown on the approved construction drawings as accurately as provided by the owner of the underground utility. The City of Dublin and the City Engineer assumes no responsibility for the accuracy or depths of underground facilities shown on the approved construction drawings. If damage is caused, the Contractor shall be responsible for repair of the same and for any resulting contingent damage. 4. Location, support, protection and restoration of all existing utilities and appurtenances, whether shown or not shown on the approved construction drawings, shall be the responsibility of the Contractor. 5. When unknown or incorrectly located underground utilities are encountered during construction, the Contractor shall immediately notify the owner and the City Engineer. 6. Public street lighting may be in the vicinity of this project. Contact the City of Dublin, Division of Engineering at 410 -4637, two days prior to beginning work. 1. Traffic control shall be furnished, erected, maintained, and removed by the Contractor according to Ohio Manual of Uniform Traffic Control Devices (OMUTCD), current edition. 2. All traffic lanes of public roadways shall be fully open to traffic from 7:00 AM to 9:00 AM and from 4:00 PM to 6:00 PM unless authorized differently by the City Engineer. At all other hours the Contractor shall maintain minimum one -lane two -way traffic. Uniformed, off -duty police officers shall replace flagmen designated by the OMUTCD, and shall be present whenever one -lane, two -way traffic control is in effect. Police cruisers may be required as directed by the City Engineer. 3. If the City Engineer determines that the Contractor is not providing proper provisions for traffic control, the City Engineer shall assign uniformed, off -duty police officers to the project at no cost to the City. 4. Steady - burning, Type "C" lights shall be required on all barricades, drums, and similar traffic control devices in use at night. 5. Access from public roadways to all adjoining properties for existing residents or businesses shall be maintained throughout the duration of the project for mail, public water and sanitary sewer service, and emergency vehicles. The Contractor shall provide a traffic control plan detailing the proposed maintenance of traffic procedures. The traffic control plan must incorporate any traffic control details contained herein. The traffic control plan proposed by the Contractor must be approved by the City Engineer prior to construction. EROSION AND SEDIMENT CONTROL 1. The Contractor or Developer is responsible for submitting a Notice of Intent (N01) to be reviewed and approved by the Ohio EPA. The NOI must be submitted to OEPA 45 days prior to the start of construction and may entitle coverage under the Ohio EPA General Permit for Stormwater Discharges associated with construction activity. A project location map must be submitted with the NOI. A sediment and erosion control plan must be submitted to the City Engineer for approval if a sediment and erosion control plan has not already been included with the approved construction drawings. This plan must be made available at the project site at all times. The design of erosion control systems shall follow the requirements of Ohio EPA, Item 207 of Ohio Department of Transportation Standard Specifications, and the City Engineer. An individual NPDES Stormwater Discharge Permit may be required. The Contractor shall be considered the permittee. 2. The Contractor shall provide sediment control at all points where storm water runoff leaves the project, including waterways, overland sheet flow, and storm sewers. 3. Accepted methods of providing erosion /sediment control include but are not limited to: sediment basins, silt filter fence, aggregate check dams, and temporary ground cover. Hay or straw bales are not permitted. 4. The Contractor shall provide adequate drainage of the work area at all times consistent with erosion control practices. 5. Disturbed areas that will remain unworked for 30 days or more shall be seeded or protected within seven calendar days of the disturbance. Other sediment controls that are installed shall be maintained until vegetative growth has been established. The Contractor shall be responsible for the removal of all temporary sediment devices at the conclusion of construction but not before growth of permanent ground cover. 1. The Contractor must obtain a blasting permit from Washington Township Fire Department prior to blasting for rock excavation. The Contractor shall submit blasting reports upon completion of blasting to the City Engineer, the Owner, and the Owners engineer. Top of rock elevations shall be shown on "as- built" construction drawings. 1. Connections to the sanitary sewer will be permitted upon receiving an OEPA Permit to Install (PTI), and upon receiving a satisfactory letter from the design engineer stating that the project has been constructed as per the plans, and all of the conditions of the PTI have been met. The developer is responsible for obtaining all P P 9 required Ohio EPA approvals and paying review fees. 2. Sanitary sewage collection systems shall be constructed in accordance with the rules, regulations, standards and specifications of the City of Dublin, Ohio EPA, Ohio Department of Health and the current edition of the Great Lakes -Upper Mississippi River Board Ten States - Recommended Standards for Wastewater Facilities. 3. The minimum requirements for sanitary sewer pipe with diameters 15 inches and smaller shall be PVC sewer � i e ASTM D3034 SDR 35. Pie for 6 -inch diameter PP P house service lines shall be PVC � i e ASTM D3034 SDR 35. PVC pipe e shall not be PP P used at depths greater than 28 feet. Pipe materials and related structures shall be shop tested in accordance with City of Columbus Construction Inspection Division quality control requirements. 4. The minimum requirements for sanitary sewer pipes with diameters greater than 15 inches shall be reinforced concrete pipe ASTM C76 with Class designation specified in the approved construction drawings. 5. All in -line Wye and tee connections in concrete sewers, 18 -inch diameter and larger, shall be either Kor -N -Tee or Kor -N -Seal connections conforming to the manufacturer's recommendations. 6. Granular backfill shall be compacted granular material according to Item 912 of the Standard Specifications or Controlled Density Backfill according to Item 636, Type III of the Standard Specifications as directed by the City Engineer. 7. All manhole lids shall be provided with continuous self - sealing gaskets. The approved construction drawings shall show where bolt -down lids are required. Sanitary sewer manholes shall be precast concrete or as approved by the City Engineer and conform to the City of Dublin sanitary manhole standard drawing. Manhole lids shall include City of Dublin logo. 8. All PVC sewer pipes shall be deflection tested no less than 60 days after completion of backfilling operations. All other requirements shall be according to Item 901.21 of the Standard Specifications. 9. Temporary bulkheads shall be placed in pipes at locations shown on the approved construction drawings and shall remain in place until the Permit to Install (PTI) has been issued by the OEPA and the sewers have been approved for use by the City Engineer. The cost for furnishing, installing, maintaining, and removing bulkheads shall be included in the contract unit bid rice for the various sanitary sewer items. P Y 10. All sanitary sewers including sanitary sewer service lines shall be subjected to and pass infiltration or exfiltration tests according to Item 901 of the Standard Specifications and must be approved for use by the City Engineer before any service connections are tapped into sewers. 11. For sanitary sewer infiltration, leakage through joints shall not exceed 100 gallons per inch of tributary sewer diameter per 24 hours per mile of length or the computed equivalent. All sanitary sewers shall be tested. 12. At the determination of the City Engineer, the Contractor may be required to perform a TV inspection of the sanitary sewer system prior to final acceptance by the City. This work shall be completed by the Contractor at his expense. 13. Visible leaks or other defects observed or discovered during TV inspection shall be repaired to the satisfaction of the Engineer. 14. Roof drains, foundation drains, field tile or other clean water connections to the sanitary sewer system are strictly prohibited according to Section 51.23 of the Dublin Code of Ordinances. 15. All water lines shall be located at least 10 feet horizontally and 18 inches vertically, from sanitary sewers and storm sewers, to the greatest extent practicable. Where sanitary sewers cross water mains or other sewers or other utilities, trench backfill shall be placed between the pipes crossing and shall be compacted granular material according to Item 912 of the Standard Specifications. In the event that a water line must cross within 18 inches of a sanitary sewer, the sanitary sewer shall be concrete encased or consist of ductile iron pipe material. 16. Service risers shall be installed where the depth from wyes to proposed ground elevation exceeds 10 feet. Tops of risers shall be no less than 9 feet below proposed ground elevation if basement service is intended. 17. Where service risers are not installed, a minimum 5 -foot length of sanitary sewer service pipe of the same size as the Wye opening shall be installed. 18. The Contractor shall furnish and place, as directed, approved Wye poles made of 2 inches x 2 inches lumber at all Wye locations, ends of extended services, or at the end of each riser where risers are required. Wye poles shall be visible before acceptance by the City. The cost of these poles shall be included in the contract unit price for the various sewer items. 19. Existing sanitary sewer flows shall be maintained at all times. Costs for pumping and bypassing shall be included in the Contractors unit price bid for the related items. 20. The Contractor shall furnish all material, equipment, and labor to make connections to existing manholes. The sewer pipe to manhole connections for all sanitary sewers shall be flexible and watertight. All holes shall be neatly cored. The sewer pipe barrel at the s rin line shall not extend more than 1 inch beyond the inside face P 9 Yo of the manhole. To maintain flexibility in the connection, a 1 -inch space shall be left between the end of the pipe inside the manhole and the concrete channel; this space shall be filled with a waterproof flexible joint filler. Any metal that is used shall be Type 300 Series Stainless Steel. The connection may be any of the following types: A. Rubber sleeve with stainless steel banding. 1) Kor -N -Seal as manufactured by National Pollution Control Systems, Inc. 2) Lock Joint Flexible Manhole Sleeve as manufactured by Interpace Corporation. 3) Or equal as approved by the City Engineer. B. Rubber gasket compression. 1) Press Wedge II as manufactured by Press -Seal Gasket Corporation. 2) Dura Seal III as manufactured by Dura Tech, Inc. 3) Link -Seal as manufactured by Thunderline Corporation. 4) Or equal as approved by the City Engineer. The cost for this work along with a new channelized base for the manhole shall be included in the unit bid price for the related items of work. 1. All water line materials shall be provided and installed according to current specifications of the City of Columbus Division of Water. 2. All public water pipe with a diameter 3 inches to 8 inches shall be Ductile Iron, Class 53. Public water pipe 12 inches in diameter or larger shall be Ductile Iron, Class 54. Public water pipe 20 inches in diameter or larger may be prestressed concrete pipe. Private water pipe shall meet the approval of the City of Columbus Division of Water prior to approval of the construction drawings. 3. Only fire hydrants conforming to City of Columbus standards will be approved for use. 4. Public water lines shall be disinfected by the City of Columbus Division of Water. Requests for water line chlorination shall be made through the City of Dublin Division of Engineering. The cost for chlorination shall be paid for by the Contractor. 5. All water lines shall be disinfected according to Item 801.13 of the Standard specifications. Special attention is directed to applicable sections of American Water Works Association specification C -651, particularly for flushing (Section 5) and for chlorinating valves and fire hydrants (Section 7). Pressure testing shall be performed in accordance with Section 801.12 of the City of Columbus Construction and Material Specifications. When water lines are ready for disinfection, the City of » » Dublin shall submit two 2 sets of as -built Ions and a letter stating that the () plans, 9 water lines have been pressure tested and need to be disinfected, to the City of Columbus, Division of Water. The Contractor shall be responsible for all costs associated with the disinfection of all water lines construction per this plan. Pressure testing shall be performed in accordance with Section 801.12 of the City of Columbus Construction and Material Specifications. 6. The Contractor shall paint all fire hydrants according to City of Dublin standards. The cost of painting fire hydrants shall be included in the contract unit price for fire hydrants. 7. No water taps or service connections (e.g., to curb stops or meter pits) may be issued until adjacent public water lines serving the construction site have been disinfected by the City of Columbus Division of Water and have been accepted by the City Engineer. A tap permit for each water service must be obtained from the City of Dublin and the City of Columbus Division of Water before making any taps into public water lines. 8. The Contractor shall notify the City of Columbus Division of Water at 645 -7788 and the City of Dublin Division of Engineering at least 24 hours before tapping into existing water lines. 9. All water main stationing hall be based on street centerline stationing. 9 9 10. All bends, joint deflections and fittings shall be backed with concrete per City of Columbus standards. 11. The Contractor shall give written notice to all affected property owners at least 1 working day but not more than 3 working days prior to any temporary interruption of water service. Interruption of water service shall be minimized and must be approved by the City Engineer. 12. Water meters shall be installed inside proposed structures unless a meter pit installation is approved by the City of Columbus Division of Water. Meter pits must conform to standard drawings L -7103, A &B for 5/8" through 1" meters or L -6317, A. B. C &D for 1 -1/2" or larger meters. 13. Water lines to be installed in embankment areas shall be placed after the embankment has been placed and compacted according to the Standard Specifications. 14. Curb stop boxes shall be located at least 1 foot inside the right -of -way and set at finished grade. 15. If the top of the operating nut of any valve is greater than 36 inches below finished grade, an extension stem shall be furnished to bring the top of the operating nut to within 24 inches of finished grade elevation. 16. All water lines shall be placed at a minimum depth of 4 feet measured from top of finished grade to top of water line. Water lines shall be set deeper at all points where necessary to clear existing or proposed utility lines or other underground restrictions by a minimum of 18 inches. 17. Two '/ inch taps shall be installed within 2 feet of the end of the line on all dead -end water lines. 1. All storm water detention and retention areas and major flood routing swales shall be constructed to finish grade and hydro- seeded and hydro- mulched according to Items 203 and 659 of the Standard Specifications. 2. Where private storm sewers connect to public storm sewers, the last run of private storm sewer connecting to the public storm sewer shall be Reinforced Concrete Pipe conforming to ASTM Designation C76, Wall B. Class IV for pipe diameters 12 inches to 15 inches, Class III for 18 inches to 24 inch pipes, and 27 inches and larger pipe shall be Class II, unless otherwise shown on the approved construction drawings. Inspection is required by the City of Dublin's Division of Engineering. 3. Granular backfill shall be compacted granular material according to Item 912 of the Standard Specifications or Controlled Density Backfill according to Item 636, Type III of the Standard Specifications as directed by the City Engineer. 4. All storm sewers shall be Reinforced Concrete Pipe conforming to ASTM Designation C76 Wall B Class IV for P i P e diameters 12 inches to 15 inches Class III for 18 inches to 24 inch pipes, and 27 inches and larger pipe shall be Class II, unless otherwise shown on the approved construction drawings. 5. Headwalls and endwalls shall be required at all storm sewer inlets or outlets to and from stormwater management facilities. Natural stone and /or brick approved by the City Engineer shall be provided on all visible headwalls and /or endwalls surfaces. 6. Storm inlets or catch basins shall be channelized and have bicycle safe grates. Manhole lids shall include City of Dublin logo and all curb inlet and catch basin grates shall indluce engraved lettering: 'DUMP NO WASTE; DRAINS TO RIVER." 7. Storm sewer outlets greater than 18 inches in diameter accessible from stormwater management facilities or watercourses shall be provided with safety grates, as approved by the City Engineer. MAIL DELIVERY 1. The Contractor shall be responsible to ensure that US Mail delivery within the project limits is not disrupted by construction operations. This responsibility is limited to relocation of mailboxes to a temporary location that will allow the completion of the work and shall also include the restoration of mailboxes to their original location or approved new location. Any relocation of mailbox services must be first coordinated with the US Postal Service and the homeowner. 2. Before relocating any mailboxes, the Contractor shall contact the U.S. Postal Service and relocate mailboxes according to the requirements of the Postal Service. 1. The Contractor shall make proper arrangements with the Dublin Service Department and the Columbus Division of Water for the use of fire hydrants when used for work performed under this contract and provide the city of Dublin a copy of the Hydrant Usage Permit obtained from the City of Columbus. The Contractor shall also send a copies of permits obtained from Dublin and Columbus to the Washington and /or Perry Township Fire Department. Permits shall be kept at the construction site at all times. 2. Before the final estimate is paid, the Contractor shall submit a letter from the City of Columbus Division of Water to the City Engineer stating that the Contractor has returned the Siamese Valve to the City of Columbus and has paid all costs arising from the use of the fire hydrants. ESTIMATE OF QUANTITIES ITEM QUANT UNIT DESCRIPTION 207 1 EA CATCH BASIN SEDIMENT FILTER 207 1 EA CURB & GUTTER INLET SEDIMENT FILTER 452 8 SY PORTLAND CEMENT CONCRETE PAVEMENT 6" DRIVEWAY APPROACH 604 3 EA MANHOLE, TYPE "C" AS PER AA -5102 901 361 LF 8" SANITARY SEWER WITH TYPE I BEDDING (8" PVC, SDR 35) 915 1 EA 8" X 6" DIAMETER WYE FITTING 918 10 LF 6" DIAMETER PIPE, SANITARY HOUSE CONNECTION SERVICE (TO R/W OR EASEMENT) 918 100 LF JACK CASING PIPE ( *) SPEC 1 EA TREE REPLACEMENT, AS PER PLAN SPEC 70 LF TREE PROTECTION FENCE QUANTITIES SHOWN ARE LISTED FOR INFORMATION AND ARE ESTIMATES ONLY. THE CONTRACTOR SHALL CONSTRUCT THE PROJECT IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS AND SHALL NOT TOTALLY RELY ON QUANTITIES LISTED OR NOT LISTED HEREON. NOTE: ESTIMATE OF QUANTITIES DOES NOT INCLUDE FUTURE SANITARY IMPROVEMENTS. ( *) CASING PIPE CAN BE ELIMINATED IF THE SANITARY SEWER UNDER AVERY ROAD IS HORIZONTALLY DIRECTIONALLY DRILLED IN PLACE OF JACK AND BORE. PM 735 16- 005 -RES DUBLIN CC -17537 O* ^;-+ V W rO VJ O 4111! rno Y) 0 W lI- I WZ Z I� C W o m I U3 m cc z Its 03 cc w W W tt �ACQ to o � U �o m U C° L a 0 LO a CQ w 1 REVISIONS 1 JOB NO. 1 2398 DRAWN BY TMW DESIGN BY TMW CHECKED BY CMT SHEET 2 OF 5 0 w /� !0 O W O - E �11 �I Z I! I� I� H �M W I--+ I--I U) L 1­4 Z E-1 OI- Z U U) 14 1W Z rw V n� 1 REVISIONS 1 JOB NO. 1 2398 DRAWN BY TMW DESIGN BY TMW CHECKED BY CMT SHEET 2 OF 5 y i i i i \ 1 i g1 \ j I _ � I F � I 1 _ / t� v \ v 0� z I I I I I I I I I I I I I I I I \ 1 I \ I \ \ I WELL \� \\ o 7100 AVERY ROAD RID: 273000418 \ VINCENT P. & CYNTHIA B. LOMBARDO I 2.30 ACRES 7070 AVERY ROAD I.N. 2015 0 72801032 71 oz I RID: 273000430 V A / JOSEPH 7.35A ACRES \ 7136 AVERY ROAD \ \ \ \ I.N. 200010260217213 DID: 337 R. 5B JEFF R. SIEFKER 0.893 ACRES \ PROP. RECEIVING PIT LOT --,-/--,PROP. m N. 201010010128978 BLI �V r EC 0' DuNSHIRE SECT. 1, PH. i \ \ 1 TREE �%� PROP. 25' � r� P.B. 79, PG. 64 \ PROTECTION �� EASEMENT 8 -���� — — \ V �9 1 ` 130' " — SAN. 2 LR HD R/w \ N RAW CONCRETE BM #2 / ^v EX. 12" WTR .., , - - - -- 9Ea - - - -` \ �- - - -- - - - -- - - -- 1Tlcl r r RESERVE 'A° 0.617 ACRES WEXFORD ESTATES SECT 1 P.B. 77, PG. 87 LOT 31 \ - 6250 MANTEO DRIVE \ WEXFORD ESTATES SECT 1 P. B. 77, PG. 87 \ - -- — — — — — —� - - -tee - -- — — _ _— — — - -- R a ' AVERY ROAD (60' R /W) --- - - § - -_ - -- -tee - - - - - -- - - -- - - -- - - -- )HE I OHE � _ - --- - - -OHE - - - -- - - -- - -- - - -- - -- - 0 - -- -- ----- - - - - -- - r ASPHALT BIKEPATH TONE J ,< 0 I \\ I _ - -- -- 92a------ - - - - -- -- 0D / --9' WALL - -- ° U O I U I I � f I I I I I 11I \ \ m \ I \� I I 1 BM 1 / U 7055 AVERY ROAD PID: 273001821 PROP. DRILL PIT `� NORTHWEST ASSEMBLY OF GOD, INC. T' / 5 / I A f 6.000 ACRES PROP. 20' EASEMENT \ \ O.R. 14886 PG. E -01 1 / RESERVE "B" \ \ 0.445 ACRES \ CITY OF DUBLIN \RESTORA N NOTES: / WEXFORD ESTATES SECT 1 1� THE C% TRACTOR SHALL SEED AND P.B. 77, PG. 87 Ma CH ALL pISTURBED AREAS AND RESTORE *R TO b�RIGINAL CONDITIONS. — (2 Y, SIDEWALKS, CURB, PAVEMENT, 8i EX. 25' EASEMENT \ BIKEPATTH, ETC... DISTURBED DURING THE \ \ CONSTR CTION THIS PROJECT SHALL BE f \ RESTOR AT THHE EXPENSE OF THIS LOT 1 \ PROJECT. \ \ o N 6249 MANTEO DRIVE WEXFORD ESTATES SECT 1 \ \ P.B. 77, PG. 87 \ \ \ SANITARY PLAN VIEW SCALE: 1" = 30' 30' 15' 0 30' 60' L FF= 920.63 I 7050 AVERY ROAD PID.* 273000443 GAYLORD E. GARDNER, JR. 1.35 ACRES I.N. 200611220233486 I o T RA J Q wTs m --- - - - - -- --921— ----- - - - - -- s-- ----- - - - - -- e — -- OHE -/- -- os� � R W ----- - - - - -- � I I I Q I I I I I PROPOSED SANITARY ALIGNMENT TABLE DESCRIPTION LENGTH BEARING EX MH - MH 1 115.00' 538'34'15 "E MH 1 - MH 2 116.00' S73'09'1 0'E MH 2 - MH 3 130.00' S10'02'18 "W WYE AND RISER TABLE ADDRESS SERVED FROM DOWNSTREAM M.H. # WYE DISTANCE FROM DOWNSTEAM MH RISER (FT) SERVICE LENGTH SERVICE INVERT (AT R/W OR ESMT) 2 -3 7100 2 15'(L) 1 0 10.0 908.43 FUTURE 3 -F1 (BY OTHERS) 7070 3 33'(L) 0 10.0 909.20 7050 3 175'(L) 0 10.0 909.85 LEGEND cM - GAS METER = DECIDUOUS TREE 0 - TELEPHONE PEDESTAL CONIFEROUS TREE ® - WATER VALVE KO = AIR CONDITIONER i7 = FIRE HYDRANT ® = CABLE TV PEDESTAL = POWER POLE ® - ELECTRIC TRANSFORMER = LIGHT POLE m - ELECTRIC PEDESTAL -❑ - SITE LIGHT POLE 4 = YARD LIGHT - GUY WARE MB = MAILBOX f i = CURB INLET ❑ = CATCH BASIN O = MANHOLE - SIGN —X —X— - FENCE w - WATER LINE S7 = STORM SEWER LINE SA = SANITARY SEWER LINE TEL = TELEPHONE LINE OHE - ELECTRIC LINES, OVERHEAD —CAS- - GAS LINE ELEC = ELECTRIC LINE, UNDERGROUND PROPOSED SANITARY CROSSING UNDER PUBLIC F1 ROADWAYS IS TO BE JACK AND BORED. SEE DETAIL, SEE SHEET 4. - DRIVEWAY PAVEMENT REPLACEMENT, TYPE III B - (CONCRETE), AS PER STD. 2160. TREE TO BE REMOVED AND REPLACED *R – 4" TREE TO BE REMOVED AND REPLACED WITH 2" CALIPER TREE. CONTRACTOR TO COORDINATE SPECIES TO BE USED IN REPLACEMENT WITH CITY OF DUBLIN ARBORIST. NOTE: IN LIEU OF JACKING AND BORING THE LINE UNDER AVERY ROAD THE CONTRACTOR CAN HORIZONTALLY DIRECTIONALLY DRILL THE SANITARY SEWER FROM MANHOLE #1 TO MANHOLE #2. IF THE CONTRACTOR USES DIRECTIONAL DRILLING, THE SEGMENT OF PIPE FROM MANHOLE #1 TO #2 SHALL BE CERTA –LOK YELOMINE PVC PIPE (OR APPROVED EQUAL). THE CONTRACTOR SHALL PROVIDE A DIRECTIONAL DRILLING PLAN TO THE DESIGN ENGINEER AND CITY PRIOR TO THE START OF CONSTRUCTION. STATE PLANE COORDINATES (OHIO SOUTH ZONE) AS -BUILT PROJECT # DESCRIPTION NORTHING EASTING NORTHING EASTING EX EXISTING MANHOLE 771441.7975 1784229.0158 MH 1 PROPOSED MANHOLE 771351.8862 1784300.7163 MH 2 PROPOSED MANHOLE 771320.0062 1784405.9953 MH 3 PROPOSED MANHOLE 771191.9963 1784383.3353 PM 735 16- 005 —RES I DUBLIN CC -17537 O* ;-+ V Q O O a0! o m 1 cv it cc ko z co Q0 Q w C � �W W .0 � oco U � .�i rn o m U V k q k 7 w z �O �V 1 z W W O 0 Q; O O -4 z�0C V 1 E-1 F-1 Z L_ 1­4 T�i U V ) M� W a 1 REVISIONS 1 JOB NO. 1 2398 DRAWN BY TMW DESIGN BY TMW CHECKED BY CMT SHEET 3 OF 5 6" PIPE FOR CONTROLLED DENSITY MATERIAL 10 MASONRY PLUG �8 0 m rn U ro 0 rn W O 2 2 g I I. 0 +00 ------------------ 115.00' � 8" SAN. O 0.45% STEEL ENCASEMENT PIPE P 000 as BEDDING MATERIAL A DENSITY NOTE MATERIAL WELD ALL ENCASEMENT PIPE JOINTS. 1 +00 1) r I i4 0 AVERY RD. rn F H - - - -EX BIKE PATH - - -- - EX. 72" 116.00' - 8" SAN. O 0.45% WATER 0 v u�i �n 0 4m 1 O1 CASING PIPE CONCRETE ENCASE FROM END OF CASING PIPE TO MANHOLES. 0 2 <1 ` <1 (J (.7 Ld s s 0 0 61 <I O O Lff 2 +00 SANITARY SEWER PROFILE 4" VENT PIPE B MASONRY PLUG n E BEDDING MATERIAL 7 v v 7 000,0' SPECIAL NOTES RE: TUNNEL /JACKING CONSTRUCTION 1. ACCESS TO THE TUNNEL /JACKING SITE SHALL BE WITHIN THE CONSTRUCTION EASEMENT FOR THE TUNNEL WORK ALONG AVERY ROAD. ACCESS TO THE JACKING/RECEIVING PITS ALONG AVERY ROAD SHALL BE FROM AVERY ROAD. VEHICLE STOPPING, PARKING, MATERIAL DELIVERY OR STORAGE OF MATERIAL SHALL NOT BE PERMITTED WITHIN THE RIGHT -OF -WAY OF AVERY ROAD EXCEPT FOR DELIVERY TO THE SITE. 2. GROUND SURFACES SHALL BE RESTORED TO EXISTING CONDITIONS IN ACCORDANCE WITH 901.18 OF THE SPECIFICATIONS. RESTORATION OF THE SURFACE SHALL BE TO THE COMPLETE SATISFACTION OF THE PROPERTY OWNER, CITY OF DUBLIN ENGINEER OR THEIR RESPECTIVE REPRESENTATIVES. INCLUDE COSTS FOR RESTORATION IN VARIOUS TUNNEL /SEWER ITEMS. 3. INSTALLATION OF TUNNEL SHAFTS, JACKING PIT, TUNNEL OR LINER SHALL BE IN ACCORDANCE WITH ITEMS 908, 909 & 920 RESPECTIVELY OF THE CITY OF COLUMBUS SPECIFICATIONS. 4. THE CONTRACTOR SHALL SUBMIT A DEWATERING PLAN TO THE CITY OF DUBLIN ENGINEER AT THE PRE - CONSTRUCTION MEETING FOR REVIEW AND APPROVAL. THE PLAN MUST CONTAIN DETAILED INFORMATION DESCRIBING FULLY MEANS, METHODS, SCHEDULES, ETC. THE DEWATERING PLAN MUST BE SIGNED BY AN OHIO REGISTERED PROFESSIONAL ENGINEER. BEFORE SUBMITTING TO THE CITY OF DUBLIN ENGINEER, THE DEWATERING PLAN MUST BE REVIEWED AND APPROVED BY THE DEVELOPER'S GEOTECHNICAL ENGINEER. 5. WELL PITS OR TUNNELING BORING PITS LEFT OPEN AFTER WORKING HOURS MUST BE FENCED TO THE SATISFACTION OF THE CITY OF DUBLIN ENGINEER. BORING DETAIL -NO SCALE- 0 O DRIVEN F' EX. GROUND — — — — — — — — — — — — - -IT 130.00' — Sr SAN. O 0.45% n 0 rn 0 rn I <1 (.7 W 0 O z O t0 3 +00 NOTE: CASING PIPE CAN BE ELIMINATED IF THE SANITARY SEWER UNDER AVERY ROAD IS HORIZONTALLY DIRECTIONALLY DRILLED IN PLACE OF JACK AND BORE. CONTROLLED DENSITY FILL MATERIAL SECTION A —A 18'0 - 0.312 "THK WALL STEEL CASING PIPE JACKED IN PLACE AS PER ITEM 909.04. REATED WOOD BLOCKING STRAPPED TO SEWER LINE CONSTRUCT MASONRY BULKHEAD AT EACH END. COST. TO BE INCLUDED IN THE PRICE BID FOR JACKED TUNNEL LINER AS PER ITEM 909. NOTES: 1• TREATED WOOD BLOCKING TO BE 6 INCHES LONG BANDED TO EACH LENGTH OF PIPE, 6' -0" MAX. C /C. ALLOW 1 INCH MAX. CLEARANCE BETWEEN BLOCKS AND CASING PIPE. 2. FILL SPACE BETWEEN SEWER PIPE AND LINER WITH 1:5 GROUT OR CLASS "A" CONCRETE. COST OF GROUT OR CONCRETE FILL MATERIAL TO BE INCLUDED IN THE PRICE BID FOR JACKED TUNNEL LINER AS PER ITEM 909. JACK CASING DETAIL -NO SCALE- PM 735 16- 005 -RES DUBLIN CC -17537 0* ;0-+ V QO O 40! I U3 to co cc � z Its co cc N4 w �W �AcQ tt �I �co U �O m U V C q L N z 0 V 1 z W W 0 0 a4 0 H4 0 rl H E-1 Z V U) V m� 1� n� 1� 1 REVISIONS 1 JOB NO. 1 2398 DRAWN BY TMW DESIGN BY TMW CHECKED BY CMT SHEET 1! OF 5 1.) SET THE STAKES. 2 "x2" PENCIL SHARPENED 48 "MIN LONG POST / /c 3.) STAPLE FILTER MATERIAL TO STAKES AND EXTEND IT INTO THE TRENCH. i 2.) EXCAVATE A 4 "x4" TRENCH UPSLOPE ALONG THE LINE STAKES. . / 4.) BACKFILL AND COMPACT THE EXCAVATED SOIL. SEDIMENT FENCE DETAIL CONTRACTOR SHALL PLACE SEDIMENT FENCE AS LOCATED ON THIS SHEET PRIOR TO CONSTRUCTION. THE HEIGHT OF A SILT FENCE SHALL NOT EXCEED 36 INCHES (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE TO THE STRUCTURE). THE FILTER FABRIC SHALL BE PURCHASED IN A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID THE USE OF JOINTS. WHEN JOINTS ARE NECESSARY FILTER CLOTH SHALL BE SPLICED TOGETHER ONLY AT A SUPPORT POST WITH A MINIMUM 6 -INCH OVERLAP AND SECURELY SEALED. POSTS SHALL BE SPACED A MAXIMUM OF 6 FEET APART AT THE BARRIER LOCATION AND DRIVEN SECURELY INTO THE GROUND (MINIMUM OF 12 INCHES). EXTRA STRENGTH FABRIC SHALL BE USED. A TRENCH SHALL BE EXCAVATED APPROXIMATELY 4 INCHES WIDE AND 4 INCHES DEEP ALONG THE LINE OF POSTS AND UPSLOPE FROM THE BARRIER. THE FABRIC SHALL BE STAPLED OR WIRED TO THE FENCE AND 8 INCHES OF THE FABRIC SHALL BE EXTENDED INTO THE TRENCH. THE FABRIC SHALL NOT EXTEND MORE THAN 36 INCHES ABOVE THE ORIGINAL GROUND SURFACE. FILTER FABRIC SHALL NOT BE STAPLED TO EXISTING TREES. 117I�1:7�Ra7��7I\�� ] �: laT�73yI����la1 �U][. Yi3I�d�3bl7C�I��Z�15� :i17I�yI�1�:�Ya1:3:7[ IT MAY BECOME NECESSARY TO REMOVE PORTIONS OF THE SEDIMENT FENCE DURING CONSTRUCTION TO FACILITATE THE GRADING OPERATIONS IN CERTAIN AREAS. HOWEVER, THE SEDIMENT FENCE SHALL BE IN PLACE IN THE EVENING OR DURING ANY INCLEMENT WEATHER. SILT FENCES AND FILTER BARRIERS SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. SHOULD THE FABRIC ON A SILT FENCE OR FILTER BARRIER DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER IS STILL NECESSARY THE FABRIC SHALL BE REPLACE PROMPTLY. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM EVENT. THEY MUST BE REMOVED WHEN DEPOSITS REACH APPROXIMATELY ONE -HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE OR FILTER BARRIER IS NO LONGER REQUIRED SHALL BE DRESSED TO CONFORM WITH THE EXISTING GRADE PREPARED AND SEEDED. SILT FENCES SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFUL PURPOSE BUT NOT BEFORE THE UPSLOPE AREA HAS BEEN PERMANENTLY STABILIZED. SOIL PROTECTION CHART ALL SEEDING ITEMS ARE COVERED FAX NUMBER BMP INSTALLATION UNDER ODOT SPECIFICATIONS. STABILIZATION TALL FESCUE BMP MAINTENANCE TYPE JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC PERMANENT + + SEEDING AUGUST 15 1 POUND DORMANT + +� SEEDING 2 TONS OR STRAW TEMPORARY + _ SEEDING SITE GROUND COVER: 25 POUNDS OF SODDING + STORM WATER MULCHING + - SEDIMENT & EROSION CONTROL STANDARDS AND CRITERIA IN ORDER TO CONTROL SEDIMENT POLLUTION OF WATER RESOURCES THE OWNER OR PERSON RESPONSIBLE FOR THE DEVELOPMENT AREA SHALL USE CONSERVATION PLANNING AND PRACTICES TO MAINTAIN THE LEVEL OF CONSERVATION ESTABLISHED BY THE FOLLOWING STANDARDS: TIMING OF SEDIMENT - TAPPING PRACTICES. SEDIMENT CONTROL PRACTICES SHALL BE FUNCTIONAL THROUGHOUT EARTH - DISTURBING PERIMETER CONTROLS, AND OTHER PRACTICES INTENDED TO TRAP SEDIMENT SHALL BE IMPLEMENTED AS THE FIRST STEP OF GRADING AND WITHIN SEVEN DAYS FROM THE START OF GRUBBING. THEY SHALL CONTINUE TO FUNCTION UNTIL THE UPSLOPE DEVELOPMENT AREA IS RESTABILIZED. 2. STABILIZATION OF DENUDED AREA. DENUDED AREAS SHALL HAVE SOIL STABILIZATION APPLIED WITHIN SEVEN DAYS IF THEY ARE TO REMAIN DORMANT FOR MORE THAN FORTY -FIVE DAYS. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE, AND SHALL ALSO BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS WHICH MAY NOT BE AT FINAL GRADE, BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN FORTY -FIVE DAYS. 3. SEDIMENT BARRIER. STREET FLOW RUNOFF FROM DENUDED AREAS SHALL BE FILTERED. 4. STORM SEWER INLET PROTECTION. ALL STORM SEWER INLETS WHICH ACCEPT WATER RUNOFF FROM THE DEVELOPMENT AREA SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER WILL NOT ENTER THE STORM SEWER SYSTEM WITHOUT FIRST BEING FILTERED OR OTHER -WISE TREATED TO REMOVE SEDIMENT. 5. CONSTRUCTION ACCESS ROUTES. MEASURES SHALL BE TAKEN TO PREVENT SOIL TRANSPORT ONTO SURFACES WHERE RUNOFF IS NOT CHECKED BY SEDIMENT CONTROLS, OR ONTO PUBLIC ROADS. 6. CUT AND FILL SLOPES. CUT AND FILL SLOPES SHALL BE CONSTRUCTED IN A MANNER WHICH WILL MINIMIZE EROSION. CONSIDERATION SHALL BE GIVEN TO THE LENGTH AND STEEPNESS OF THE SLOPE, SOIL TYPE, UPSLOPE DRAINAGE AREA, GROUNDWATER CONDITIONS, AND SLOPE STABILIZATION. 7. ESTABLISHMENT OF PERMANENT VEGETATION. A PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL GROUND COVER IS ACHIEVED WHICH, IN THE OPINION OF THE APPROVING AGENCY, PROVIDES ADEQUATE COVER AND IS MATURE ENOUGH TO CONTROL SOIL EROSION SATISFACTORILY AND TO SURVIVE ADVERSE WEATHER CONDITIONS. 8. DISPOSITION OF TEMPORARY PRACTICES. ALL TEMPORARY EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE DISPOSED OF WITHIN THIRTY DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED OR AFTER THE TEMPORARY PRACTICES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE APPROVING AGENCY. TRAPPED SEDIMENT SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION. 9. MAINTENANCE. ALL TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE DESIGNED AND CONSTRUCTED TO MINIMIZE MAINTENANCE REQUIREMENTS. THEY SHALL BE MAINTAINED AND REPAIRED AS NEEDED TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. NOTE: THE ONSITE CONTACT /S RESPONSIBLE FOR SEDIMENT AND EROSION CONTROL ON THIS SITE ARE: TEMPORARY SEEDING & NAME PHONE NUMBER FAX NUMBER BMP INSTALLATION PER 1000 SQ FT PER ACRE TALL FESCUE BMP MAINTENANCE 1 POUND 40 POUNDS & SITE STABILIZA1ON AND BMP REMOVAL & & ANNUAL RYEGRASS TEMPORARY SEEDING & MULCHING FOR EROSION CONTROL TEMPORARY SEEDING SEED TYPE SEEDING DATES PER 1000 SQ FT PER ACRE TALL FESCUE MARCH 1 1 POUND 40 POUNDS & TO & & ANNUAL RYEGRASS AUGUST 15 1 POUND 40 POUNDS SMALL GRAIN SITE ACREAGE.• 90 POUNDS OR 2 TONS OR STRAW AVERAGE SLOPE.• 2 TO 3 BALES 75 BALES PROPOSED - APPROX. 2% SITE GROUND COVER: 25 POUNDS OF 1000 POUNDS OF FERTILIZER STORM WATER 12 -12 -12 OR THE 12 -12 -12 OR THE GRASSED/ LANDSCAPED AREAS TOWARDS EXISTING EQUIVALENT EQUIVALENT ANNUAL RYEGRASS AUGUST 16 CrA - CROSBY SILT LOAM, SOUTHERN OHIO TILL OR TO 3 POUNDS 2 BUSHELS WHEAT I OCTOBER 31 SUBJECT TO FIELD MODIFICATION AT THE DISCRETION SOIL PROTECTION SMALL GRAIN NOVEMBER 1 90 POUNDS OR 2 TONS OR STRAW MULCH TO 2 TO 3 BALES 75 BALES FEBRUARY 29 SEDIMENT & EROSION CONTROL NARRATIVE PLAN DESIGNER: POMEROY & ASSOCIATES, LTD. 7070 Avery Road DID : 2 730 0 0430 2550 CORPORATE EXCHANGE DRIVE, SUITE 10 Z' COLUMBUS, OHIO 43231 LY, PHONE: (614) 885 -2498 1. N. 20 0 0 7 02 6 021 7213 FAX: (614) 885 -2886 OWNER/DEVELOPER: EDWARD A. POLLINA CONSTRUCTION, LLC. t 4301 REYNOLDS DRIVE (SEE DETAIL BELOW) HILLIARD, OHIO 43026 , I1 ' PHONE: (614) 207 -6014 (C) DEVELOPMENT TYPE: RESIDENTIAL SITE ACREAGE.• 4.68 ACRES DISTURBED ACREAGE.• 0.21 ACRES AVERAGE SLOPE.• EXISTING - APPROX. 2% I, PROPOSED - APPROX. 2% SITE GROUND COVER: EXISTING - GRASSED /LANDSCAPED AREAS & PAVEMENT PROPOSED - GRASSED /LANDSCAPED AREAS & PAVEMENT STORM WATER RUNOFF WILL CONTINUE TO SHEET FLOW THROUGH MANAGEMENT GRASSED/ LANDSCAPED AREAS TOWARDS EXISTING ROADSIDE DITCH. SOILS: Ko - KOKOMO SILTY CLAY LOAM, 0 TO 2% SLOPES CrA - CROSBY SILT LOAM, SOUTHERN OHIO TILL PLAIN 2 TO 6% SLOPE ON SITE CONTACT TO BE NAMED ALL EROSION AND SEDIMENT CONTROL PRATICES ARE SUBJECT TO FIELD MODIFICATION AT THE DISCRETION OF THE CITY OF DUBLIN AND /OR THE OHIO EPA. SOIL EROSION NOTES Kt] �f. `11YCxYr�11Y[�1��.`h[�111�1�[N� 1. INSTALL PERIMETER SEDIMENT FENCE & STABILIZED CONSTRUCTION ENTRANCE. 2. GRADE AND STOCKPILE TOPSOIL A. SEDIMENT BARRIER AROUND STOCKPILE OR B. TEMPORARY SEEDING 3. VEGETATIVE COVER ALL AREAS TO BE EXPOSED LONGER THAN 45 DAYS (TEMPORARY SEEDING). 4. INSTALL UTILITIES A. INSTALL INLETS AND BASIN FILTERS AS SHOWN ON PLANS 5. INSTALL PAVEMENT SUBGRADE AND DITCHES INSTALL DITCH FILTERS AS SHOWN ON THE PLANS. 6. INSTALL IMPROVEMENTS AND FINAL GRADING. 7. PERFORM CONTINUING MAINTENANCE. 8. PERMANENT SEEDING AND MULCHING. 9. REMOVE SEDIMENT FILTER AFTER VEGETATION GROWTH IS ESTABLISHED. 10. ON SITE CONTACT. TO BE NAMED SIGN SILT FENCE x x x x x X SOIL BERM CONCRETEI WASHOUT AREA 4 "x4" POST x x x NOTE:_ THIS PLAN MUST BE POSTED ON -SITE. Al6o E �. i 1 I yl Reserve '$" j jl�i�gy �j CITY OF DUBLIN 0.445 Acres Wexford Estates Sect. I l iI�P P.B. 77, Pg. 87 VIII i i9 7100 Avery R6, _ PID: 27300041 VincefvP_& Cynthia B. 2y30 Acres \L/ I.N. 2015tjr128010 Fcwol O �(f I I � I I 7070 Avery Road DID : 2 730 0 0430 � J Z' 7136 Avery Road LY, DID. 2 730 0 6 33 7 1. N. 20 0 0 7 02 6 021 7213 Jeff R. Siefker ' 16.. 0.893 Acres t LN. 201010010128978 (SEE DETAIL BELOW) PID: 2 73 0 0 1821 , I1 ' I, ___ jr 7100 Avery R6, _ PID: 27300041 VincefvP_& Cynthia B. 2y30 Acres \L/ I.N. 2015tjr128010 Fcwol O �(f If 1 / 7070 Avery Road DID : 2 730 0 0430 = SEDIMENT FENCE Z' Joseph D. Monchik 1.35 Acres LY, i 1. N. 20 0 0 7 02 6 021 7213 � I 1' I O ' 16.. FM 7055 AVERY ROAD I O (SEE DETAIL BELOW) PID: 2 73 0 0 1821 NORTHWEST ASSEMBLY OF coo, INC 6.000 ACRES O.R. 14885 PG. E -01 1 f�jaa f ij 7050 Avery Rood 1 I 1 I� �' PID.' 2 7300 0 443 Gaylord E. Gardner, J 1 , 1.35 Acres �ii� LN. 200611220233486 11' � __/� EROSION CONTROL PLAN SCALE: 1" = 60' EXISTING ROADWAY STABILIZED CONSTRUCTION ENTRANCE AND DRIVE COMPACTED SUB BASE SECTION "B" - "B" HOLLOW OUT.-AREA 6 "•MINIMUM . (STAGING AREA PAVEMENT x AND FILL. 4 " -6' WIfiH' AGGREGATE' x COMPOSITION 6" THICK) (NO 57,- NO. 4 OR 'NO. 2) LO PLASTIC UNDERLINER REQUIRED x x x x x x x x x x 8' (MIN) 10' (MIN) CONCRETE WASHOUT NOTES 1.) CONTRACTOR IS RESPOSIBLE FOR MAINTAINING ALL PUBLIC ROADWAY SURFACES AND KEEPING ROADS CLEAN OF MUD AND DEBRIS. 2.) CONTRACTOR SHALL PROVIDE AND MAINTAIN A CONCRETE CLEAN -OFF ZONE AT THE POINT OF ACCESS TO THE CONSTRUCTION SITE. 3.) THE CONTRACTOR SHALL DETERMINE A SUITABLE SITE FOR THE CONCRETE WASHOUT AREA THAT IS APPROVED BY THE ENGINEER. 4.) THE USE OF A PORTABLE CONCRETE WASHOUT IS ENCOURAGED. CONCRETE WASHOUT AREA -NOT TO SCALE- STABILIZED CONSTRUCTION ENTRANCE AND DRIVE PLAN VIEW STABILIZED CONSTRUCTION ENTRANCE THE EARTHWORK CONTRACTOR SHALL INSTALL AND MAINTAIN THE CONSTRUCTION ENTRANCE AND STAGING AREA. THE EARTHWORK CONTRACTOR SHALL PERIODICALLY ADD CLEAN STONE AND MAINTAIN THE GRAVEL EDGES FOR THE DURATION OF THE PROJECT. WHEN THE CONSTRUCTION ENTRANCE AND DRIVE ARE NO LONGER NEEDED, THE EARTHWORK CONTRACTOR SHALL REMOVE THE GRAVEL AND RESTORE THE GROUND TO ITS ORIGINAL CONDITION. PM 735 16- 005 -RES I DUBLIN CC -17537 V W O O VJ co I Lm cc --Its z va cc .9w � o0 Wa 9 °°D° aACQ tt I 10 co U O m U V c q ko ra° C w z TO V 1 W Z W 0 I4 I--I 0.1p O O P' �4 FI-�q �00 C) � W z 1­4 W c� 0 U) V m�_4 I+I n� 1 REVISIONS 1 JOB NO. 2398 DRAWN BY TMW DESIGN BY TMW CHECKED BY CMT SHEET 5 of 5 LEGEND A A = SEDIMENT FENCE © = CONCRETE WASHOUT AREA = CATCH BASIN SEDIMENT FILTER = CURB & GUTTER INLET SEDIMENT FILTER FM = STABILIZED CONSTRUCTION ENTRANCE (SEE DETAIL BELOW) EXISTING ROADWAY STABILIZED CONSTRUCTION ENTRANCE AND DRIVE COMPACTED SUB BASE SECTION "B" - "B" HOLLOW OUT.-AREA 6 "•MINIMUM . (STAGING AREA PAVEMENT x AND FILL. 4 " -6' WIfiH' AGGREGATE' x COMPOSITION 6" THICK) (NO 57,- NO. 4 OR 'NO. 2) LO PLASTIC UNDERLINER REQUIRED x x x x x x x x x x 8' (MIN) 10' (MIN) CONCRETE WASHOUT NOTES 1.) CONTRACTOR IS RESPOSIBLE FOR MAINTAINING ALL PUBLIC ROADWAY SURFACES AND KEEPING ROADS CLEAN OF MUD AND DEBRIS. 2.) CONTRACTOR SHALL PROVIDE AND MAINTAIN A CONCRETE CLEAN -OFF ZONE AT THE POINT OF ACCESS TO THE CONSTRUCTION SITE. 3.) THE CONTRACTOR SHALL DETERMINE A SUITABLE SITE FOR THE CONCRETE WASHOUT AREA THAT IS APPROVED BY THE ENGINEER. 4.) THE USE OF A PORTABLE CONCRETE WASHOUT IS ENCOURAGED. CONCRETE WASHOUT AREA -NOT TO SCALE- STABILIZED CONSTRUCTION ENTRANCE AND DRIVE PLAN VIEW STABILIZED CONSTRUCTION ENTRANCE THE EARTHWORK CONTRACTOR SHALL INSTALL AND MAINTAIN THE CONSTRUCTION ENTRANCE AND STAGING AREA. THE EARTHWORK CONTRACTOR SHALL PERIODICALLY ADD CLEAN STONE AND MAINTAIN THE GRAVEL EDGES FOR THE DURATION OF THE PROJECT. WHEN THE CONSTRUCTION ENTRANCE AND DRIVE ARE NO LONGER NEEDED, THE EARTHWORK CONTRACTOR SHALL REMOVE THE GRAVEL AND RESTORE THE GROUND TO ITS ORIGINAL CONDITION. PM 735 16- 005 -RES I DUBLIN CC -17537 V W O O VJ co I Lm cc --Its z va cc .9w � o0 Wa 9 °°D° aACQ tt I 10 co U O m U V c q ko ra° C w z TO V 1 W Z W 0 I4 I--I 0.1p O O P' �4 FI-�q �00 C) � W z 1­4 W c� 0 U) V m�_4 I+I n� 1 REVISIONS 1 JOB NO. 2398 DRAWN BY TMW DESIGN BY TMW CHECKED BY CMT SHEET 5 of 5