Loading...
HomeMy WebLinkAboutResolution 048-16RECORD OF RESOLUTIONS aexxerrsvmxms- o�rrau omo Resoluton No. 46 -16 A RESOLUTION ACCEPTING THE LOWEST AND BEST BID FOR THE BOARDWALK IMPROVEMENTS — S.R. 161 AT SHAWAN FALLS PROJECT WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Revised Charter and Chapter 37 of the Dublin Code, for the Boardwalk Improvements — S.R. 161 at Shawan Falls Project; and WHEREAS, Council has determined that the bid submitted by B K Layer LLC constitutes the lowest and best bid. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, T of its elected members concurring, that: Section 1. The bid submitted by B K Layer LLC in the total amount of $106,619.50 is hereby accepted. Section 2. The City Manager is hereby authorized to enter into contracts with B K Layer LLC for performance and completion of the Boardwalk Improvements — S.R. 161 at Shawan Falls, pursuant to the Advertisement, Proposal and Contract Documents for said project on file in the office of the City Engineer. Section 3. This Council further hereby authorizes and directs the City Manager, the Director of Law, the Director of Finance, the Clerk of Council, or other appropriate officers of the City to prepare and sign all other agreements and instruments and to take any other actions as may be necessary to implement this Resolution and complete the Project. Section 4. This Resolution shall take effect upon passage in accordance with Section 4.04(a) of the Revised Charter. Clerk of Council 2016. �ssoi Office of the City Manager • 5200 Emerald Parkway # Dublin, OH 430171090 of Dublin Phone, 614 -410 -4400 e Fax; 614 - 410-4490 To: Members of Dublin City Council From; Dana L, McDaniel, City Manag��/ �`"�`� r Date, September 8, 2016 Initiated Bye Paul A, Hammersmith, P,E,, Director of Engineering/City Engineer Kenneth B, Richardson, P.E,, P.S., Senior Civil Engineer Re; Resolution No, 48 -16 - Boardwalk Improvements -- 5R, iGl at Shawan Falls -Bid Acceptance Summary On August 31, 2016, three (3) bids were received, publicly opened and read for the Boardwalk Improvements — S,R,161 at Shawan Falls project, This project involves the rehabilitation of 462 feet of boardwalk shared -use path along the north side of S.R. 161 between Post Road and Shawan Falls Drive. The existing timber deck will be replaced with composite decking, The existing wood railing will be replaced with treated wood railing, The Engineer's estimate is $110,000, The funds for this project are included in the 2016 Capital Improvements Program (CIP) - AT1612 (Bridge Maintenance) budget in the amount of $180,0000 B K Layer LLC submitted the lowest and best bid of $1Q6,619,50. Staff has reviewed all bids and a summary of the bids is listed below, For Council's reference and review, a reduced set of project construction drawings has been placed in the Council Planning Raam, Staff anticipates the construction to commence the last week of September 2016, S,R.161will remain open to traffic far the duration of the construction. The entire project is within the Limited Access Right - of�Way far I -270 along S,R.161, A permit has been submitted to ODOT for closing the curb lane an S,R,161 adjacent to the boardwalk between the hours of 9 a.m. and 330 p,m., Monday through Friday, as needed. The scheduled completion date far the project is December 16, 2016, The existing boardwalk path will be closed with appropriate barricades far the duration of the construction period, Recommendation Staff has thoroughly reviewed the bid from B K Layer LLC. Previous experience with B K Layer LLC has been favorable with this recent project, Darree Fields Pump Station Upgrades and Faur -Inch Farce Main Project Staff recommends Council approval of Resolution 48 -16, accepting as lowest and best the bid of B K Layer LLC in the amount of $106,619,50 and authorizing the City Manager to enter into a contract with B K Layer LLC for this project, Bid as Read Bidder � Bid as Read Over (+) or unaer t -� Corrected Bid Central Ohio Building Company, II � Inc, I $108,857,60 -1.0% For Council's reference and review, a reduced set of project construction drawings has been placed in the Council Planning Raam, Staff anticipates the construction to commence the last week of September 2016, S,R.161will remain open to traffic far the duration of the construction. The entire project is within the Limited Access Right - of�Way far I -270 along S,R.161, A permit has been submitted to ODOT for closing the curb lane an S,R,161 adjacent to the boardwalk between the hours of 9 a.m. and 330 p,m., Monday through Friday, as needed. The scheduled completion date far the project is December 16, 2016, The existing boardwalk path will be closed with appropriate barricades far the duration of the construction period, Recommendation Staff has thoroughly reviewed the bid from B K Layer LLC. Previous experience with B K Layer LLC has been favorable with this recent project, Darree Fields Pump Station Upgrades and Faur -Inch Farce Main Project Staff recommends Council approval of Resolution 48 -16, accepting as lowest and best the bid of B K Layer LLC in the amount of $106,619,50 and authorizing the City Manager to enter into a contract with B K Layer LLC for this project,