Loading...
HomeMy WebLinkAboutResolution 050-16RECORD OF RESOLUTIONS a.�xxenenonnxs. uuran a�w Resolution No. 50.16 A RESOLUTION ALLOWING THE CITY MANAGER TO ENTER INTO A COOPERATIVE CONTRIBUTION AGREEMENT WITH THE CITY OF COLUMBUS FOR ARTERIAL STREET REHABILITATION — SAWMILL CORRIDOR WHEREAS, Dublin has initiated a study to investigate intersection improvement alternatives for the Sawmill Road /Snuffer Road intersection; and WHEREAS, Columbus has requested that Dublin expand the limits of the Sawmill Road /Snuffer Road Intersection Alternatives Analysis study, by combining a prior Columbus study of Sawmill Road from I -270 to Hard Road, with Dublin's initial Sawmill Road /Snuffer Road Intersection Alternatives Analysis study, and extending to the south to SR 161 (the Project); and WHEREAS, the expanded study will include determining conceptual intersection layouts that will meet Columbus Level of Service criteria for the Sawmill Road /SR 161, Sawmill Road /Banker Drive, Sawmill Road /Federated Boulevard, and incorporate previous study results for the Sawmill Road /Billingsley Road, Sawmill Road /Bright Road /Sawbury Boulevard, and Caine Road /Snouffer Road intersections In the study area, and investigate a corridor concept that includes a third through lane in each direction, including through the I- 270 /Sawmill Road interchange; and WHEREAS, Dublin agrees to accept a deposit of funds from Columbus in the amount of $98,350.00 for the base services, up to $40,135.00 for "If Authorized Services," and an additional $11,335.00 for "Contingency services," for a total study cost not to exceed $150,000 for the Columbus portion of the project; and WHEREAS, Dublin and Columbus recognize the benefit that these public improvements will have on their citizens and that it is in the best interests of Dublin and Columbus to enter into a Contribution Agreement. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, Iz— of its elected members concurring, that Section 1. The City Manager is hereby authorized to enter into an Contribution Agreement with Columbus to expand the limits of the Sawmill Road /Snouffer Road Intersection Alternatives Analysis from SR 161 to Hard Road, in substantially the same form as attached, With changes not inconsistent with this Resolution and not substantially adverse to this City and which shall be approved by the City Manager and Director of Finance. The approval of changes thereto by those officials, and their character as not being substantially adverse to the City, shall be evidenced conclusively by their execution thereof. Section 2. This Council hereby authorizes and directs the City Manager, the Clerk of Council, the Director of Law, the Director of Finance, or other appropriate officers of the City to prepare and sign all agreements and Instruments and to take any other actions as may be appropriate to implement this Resolution. This Council further authorizes the City Manager and the Director of Finance, for and in the name of the City, to execute any amendments to the Contribution Agreement, which amendments are not inconsistent with this Resolution and not substantially adverse to this City. Section 3. This Resolution shall take effect upon adoption in accordance with Section 4.04(4) of the Revised Chkg. Pa this d o ° CY 2016. Mayor - Pr idin icer ATTEST. p �.� Clerk of Council Office of the City Manager 5200 Emerald Parkway # Dublin, OH 43017.1090 City of Dublin Phone'. 614410.4900 � Faz: 614.410 -4490 To; Members of Dublin City Caundl Memo From; Dana L, McDaniel, City Mans �ar� Date; September 8, 2016 Initiated By, Paul A. Hammersmith, PE, Director of Engineering�Gty Engineer Jean•Ellen M, Willis, PE, Engineering Manager— TranspoHation Re; Resolution 50.16 • Authorizing the City Manager to Enter into a Cooperative Contribution Agreement with the City of Columbus for Rrterial Street Rehabilitation — Sawmill Corridor Summary As described in the 2016 — 2020 Capital Improvements v Program, the intersection of Sawmill Road and aaim s BmuXar R Snouffer Road is being evaluated, Dublin requested er�19Ra r proposals and interviews from consulting firms, and swau selected CH2M to lead the study at the end of 2019 In the early stages, Columbus was engaged, as portions of this intersection are within the City of Columbus, and a partnership was farmed that resulted In a comprehensive corntlor study for Sawmill Road, �y' Columbus requested to expand the study limits along Sawmill Road to Include the inersections from SR 161 to Hard Road, The resultant work combines Dublin's initial study with the Columbus Sawmill Road Third Southbound Lane Study, from I.210 to Hard Road, and expands the limits south to SR 161, as shown in Figure 1. The expanded study will include debermining conceptual intersection layouts that will meet Level of Ser�Are criteria for the Sawmill Road and SR 161; ,� r Sawmill Road and Banker Drive; Sawmill Road and ` Ullage Parkway�Federatetl Boulevard intersections, _ "i��ae Previous study resuRs will be incorporated for the ,� Sawmill Road and Billingsley Road; Sawmill Roatl and ,�' Bright Road�Sawbury Boulevard; and Caine Road and eunee� Snouffer Roatl intersections. The study will investigate a comdor concept that expands the newly consWctetl saa third noltbound lane (from 1.210 to Hard Road) to a third through lane in each direction, including ihmugh the I.2701Sawmill Road Interchange and south to SR "�;,� ,. 161. Having all of these elements in one cohesive study for the entire rorridor is beneficial for both agentles. figure 1. Study Area Res. 60.16 - Cooperative Contribution Agreement — Sawmill Road September 8, 2016 Page 2 of 2 There is money programmed for design in the 2016 -2020 CIP for the Sawmill Road Third Southbound Lane study, in the event a design project resulted from the Columbus work, Based on thane study results, however, Columbus has not determined what their final solution is far this corridor to date, Columbus has, instead, asked to partner with Dublin to examine the corridor for a more holistic approach, understanding these intersections operate as a system, Dublin has allocated $107,652 of the currently programmed money to expand the study even further to analyze Bright Road, its intersection with Sawmill Road, and lead a public involvement process The added study scope was 1=Nnalized in June 2016, Traffic counts have been conducted, A public meeting regarding study progress for the Bright Road Area will be held cater this year. The study is scheduled for completion in late spring of 2017, Coordination will occur with the Bright Road Area Plan update The attached agreement outlines the responsibilities of Dublin and Columbus for study, Columbus is advancing $98,350 in basic services, and contributing up to a maximum of $150,000, Table 1 below details the studies, casts and work to be completed for each, Table 1, StudvDefails I Agency Study Name Sawmill Road and Cast Description j Sawmill Road and Snouffer Dublin ; Snauffer Road $147,470 Road intersection conceptual alternatives development Sawmill Corridor � $98,350 Basic Services ;Conceptual intersection Columbus (Arterial Street +$40,135 If Authorized layouts, and study of Sawmill Rehabilitation} � +$11,335 Contingency Road third through lane $107 652 Develop unconventional Dublin i Bright Road and ! (includes $69,388 for intersection solutions far � Sawmill Raad � public involvement) � Sawmill Road and Bright Road and public involvement Dublin Total ! $255,122 Grand Total r � $353,472 - $405,122 Recommendation Staff recommends approval of Resolution 50 -16, authorizing the City Manager to enter a Cooperative Contribution Agreement with the City of Columbus for Arterial Street Rehabilitation - 5awmlllCorridor, CAPITAL IMPROVEMENTS PROJECT CONTRIBUTION AGREEMENT BETWEEN CITY OF COLUMBUS, OHIO AND CITY OF DUBLIN, OHIO FOR ARTERIAL STREET REHABILITATION — SAWMILL CORRIDOR CAPITAL IMPROVEMENT PROTECT 530103- 100047 This Contribution Agreement (the "AGREEMENT "), made and entered into this day of , 2016 (the "Effective Date "), by and between the City of Columbus, Ohio acting through its Director of Public Service, hereinafter designated as COLUMBUS, pursuant to and under the authority of Ordinance No. 1639 -2016, passed by the City Council of the City of Columbus on the 11th day of July 2016, and the City of Dublin, an Ohio municipal corporation, with its offices at 5200 Emerald Parkway, Dublin, Ohio 43017, hereafter designated DUBLIN, collectively referred to as the "Parties"; and WHEREAS, DUBLIN recently initiated a traffic analysis of the Sawmill Road corridor, including the Sawmill Road at Snouffer Road intersection, in relation to its Bridge Street District Vision Plan; and WHEREAS, COLUMBUS has requested that DUBLIN expand the limits of its traffic analysis to provide a holistic study, as detailed in Exhibit A, of the Sawmill Road corridor from W. Dublin - Granville Road to Hard Road combining a prior study by COLUMBUS of Sawmill Road from I -270 to Hard Road with DUBLIN's original study area and extending south to W. Dublin - Granville Road to adjoin a separate study of the W. Dublin - Granville Road corridor (the "Project'); and WHEREAS, COLUMBUS recognizes the benefit that that effort will have on its citizens and understands that it is in the best interests of COLUMBUS and DUBLIN to enter into a Contribution Agreement for that purpose; and WHEREAS, Ordinance 1639 -2016 authorized COLUMBUS to enter into agreements with DUBLIN whereby COLUMBUS agrees to contribute funds toward the traffic analysis being performed by DUBLIN; NOW THEREFORE, for and in consideration of the mutual covenants herein contained, and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the parties hereto do hereby covenant and agree, as follows: 1. DEFINITIONS: A. "Contract Documents" shall mean this Agreement including any attachments /exhibits thereto. B. "Contribution" is defined as the total consideration paid to DUBLIN for COLUMBUS' share of the Work to be performed by DUBLIN pursuant to Section 2 herein. C. "Maximum Cost' shall not exceed $150,000.00 payable to DUBLIN by COLUMBUS, unless and until additional amounts are appropriated by City Council and certified available by the City Auditor, and an appropriate modification of this Agreement is entered into by the Parties. D. "Work" means the completion of a traffic study. 2. TERM: This Agreement shall commence on the date of execution by COLUMBUS and shall terminate after the Work has been accepted by DUBLIN and COLUMBUS and all final accounting has been completed and payment or refund received. 3. GENERAL CONSIDERATIONS: In consideration of the promises of COLUMBUS set forth herein, DUBLIN agrees to perform, or cause to be performed, a traffic analysis encompassing the Sawmill Road corridor from West Dublin - Granville Road to Hard Road. 4. CONTRIBUTION: COLUMBUS shall contribute up to $150,000.00 to DUBLIN toward costs associated with the completion of the traffic analysis as delineated in the Cost Proposal prepared by CH2M dated May 16, 2016, attached hereto as Exhibit A, and as authorized by the Ordinance referenced in paragraph 1 of this Agreement, unless and until additional appropriations are approved by City Council and certified by the City Auditor, and an appropriate modification of this Agreement is entered into by the Parties. COLUMBUS' Contribution includes: Basic Services in the amount of $98,350.00; If Authorized Services in the amount of $40,135.00; and Contingency in the amount of $11,335.00, as detailed in Exhibit A. COLUMBUS shall disburse payment to DUBLIN for Basic Services in the amount of $98,350.00 within 30 days following the execution of this Agreement by the Parties. Payment shall be made out to and delivered to: City of Dublin Engineering 5800 Shier Rings Road Dublin, Ohio 43016 Attn: Jean-Ellen Willis COLUMBUS further agrees to disburse payments to DUBLIN for If Authorized Services and Contingency within 30 days following the authorization of said services as warranted to facilitate the completion of the Project. The monies DUBLIN receives from COLUMBUS shall be allocated to those items specifically delineated within Exhibit A. DUBLIN shall not render payment to CH2M, the Consultant contracted by DUBLIN to perform the Work, without first providing COLUMBUS with a copy of the Consultant' s invoice for review and concurrence. 5. FINAL ACCOUNTING: Upon completion of the Work, DUBLIN shall perform a final accounting to determine the final cost of the Work. Should the actual Cost of the Work amount to less than COLUMBUS' Contribution thereto, DUBLIN shall provide a refund to COLUMBUS within 90 days of the project being deemed complete by DUBLIN. 6. LEGAL JURISDICTION: All claims, counterclaims, disputes and other matters in question between COLUMBUS, its agents and employees, and DUBLIN, its contractors, subcontractors and agents arising out of or relating to this Agreement or its breach will be decided in a court of competent jurisdiction within the County of Franklin, State of Ohio. K ENTIRE AGREEMENT: This Agreement shall constitute the entire agreement between the parties and shall supersede all prior agreements, proposals, representations, negotiations and letters of intent, whether written or oral, pertaining to the Work. 8. ADDITIONAL DOCUMENTATION: The following document exhibits to be hereby incorporated into and made part of the Contract as though specifically rewritten herein: 8.1 Exhibit A: Cost proposal by CH2M, dated May 16, 2016 [Remainder ofpage intentionally, left blank] IN WITNESS WHEREOF, the parties have caused this Agreement to be executed by their duly authorized officers on the dates appearing below. CITY OF COLUMBUS By: Jennifer Gallagher, Director Department of Public Service Date: APPROVED AS TO FORM AND CORRECTNESS: Richard C. Pfeiffer, Jr. Columbus City Attorney CITY OF DUBLIN By: Dana McDaniel City Manager Date: APPROVED AS TO FORM AND CORRECTNESS: Jennifer D. Readler Law Director EXHIBIT A COST PROPOSAL BY CH2M, DATED MAY 16, 2016 QUIA Ch w�4�,mm ®, SUE too odurnbus OH 43229 �' May 16, 2016 lean£Ilen Willis, PE Engineering Manager Transportation City of Dublin, Ohio 5800 Shier Rings Road Dubl in, OH 4801E Subjea: Revised Sawmill Road eSnouRef Road Intersection Analysis -Modi radon Dear leannle Attached pl ease f und the Too add m4 pro posal to rthe mediflatlon to rthe Sawmi ll Road/Sno ITT er Road Imeaertlo n Study. The sco to has been revised per coo minable n and dlartlo n fro in the City of Columbus. This pro posal Isto rthe expanded study area from Ham Road to SR 161. The expanded study area Ind udes studying the seeing 51ane people and a ]lane people along Sawmill Road. Thank yo a to r the a ppo hunts to submit th a modif cap on pro to sal. if yo a have any quesho ns, or require additio nal Info neap on, please all Sharon Thompsonat 614 825E757. Sincerely, Poll HILL Engineers, Inc Andres We 1perf, PE Project Manager �U Shawn Thompson, PE, ME Vice President Table of Contents SCOPE OF SERVICES COST PROPOSAL SCHEDULE APPENDIX A- SUBCONSULTANT PROPOSAL SAWMILL ROAD STUDY - MODIFICATION 10 Modification to Original Scope of Services: City of Columbus requested additions to Sawmill /Snouffer Traffic Study Task 1.1 — Sawmill existing corridor review /data collection /traffic counts • Perform manual turning movement counts from 11:OOAM to 2:OOPM on a Saturday for the following intersections: o Sawmill Road at W. Dublin- Granville Road • Sawmill Road at Banker Drive /Sawmill Place Boulevard • Sawmill Road at Village Parkway/ Federated Boulevard • Sawmill Road at Snouffer Road • Caine Road at Snouffer Road Perform manual turning movement counts for the same weekday hour intervals as collected for the other intersections for the following intersections: o Sawmill Road at W. Dublin- Granville Road • Sawmill Road at Banker Drive /Sawmill Place Boulevard • Caine Road at Snouffer Road Collect tube traffic counts for the following right -in /right -out (RIRO) or right -in (RI) driveways on Sawmill Road: o the RIRO driveway on the east side between W. Dublin- Granville Road and Banker Drive /Sawmill Place Boulevard the RI driveway on the east side between Banker Drive /Sawmill Place Blvd. and Federated Blvd. both RIRO driveways on the east side between Federated Blvd. and Snouffer Rd. the three RIRO driveways along the east side between Snouffer Rd. and the 1 -270 interchange Subsequent to identification of these intersections /drives for data /count collection, ODOT has indicated that the RIRO drive (New Market Center Way) located on the east side of Sawmill Road between 1 -270 and Billingsley shall also be included in the expanded analysis. This task includes counting this intersection for the same Weekday and Saturday peak time periods as the other intersections /drives noted in Task 1.1. See attached email dated 03/16/2016 regarding confirmation and clarification of limits of certified traffic. Task 1.2 — City of Columbus traffic /utility coordination • Extend study area for this task south to and including the Sawmill Road at W. Dublin - Granville Road intersection and east to and including the Caine Road at Snouffer Road intersection. Task 1.3 — Setup GIS mapping and ROW • Extend study area for this task south to and including the Sawmill Road at W. Dublin - Granville Road intersection and east to and including the Caine Road at Snouffer Road intersection. Task 1.4a — Coordination /Review ODOT Developed Certified Traffic • Extend study area for this task to include the additional intersections /driveways counted in the addition to Task 1.1. This task includes time for preparation of certified traffic requests for the extension of the study area to include the additional intersections /driveways and an additional weekday base condition traffic assignment. Per direction of the City of Columbus, an additional corridor concept will be evaluated that considers a complete third through lane in each direction of Sawmill Road between W. Dublin- Granville Rd. and Hard Rd, including through the interchange. See attached email dated 03/22/2016 from the City of Columbus. This additional alternative will be included with the existing /no -build submittal for certified traffic. The request for existing /no -build conditions 2020 and 2040 traffic volumes will be expanded to include the request for this second baseline alternative. The request will be made for opening day and design year traffic volumes and include AADT, truck %, and hourly volumes for the AM and PM peak hour periods. Per discussion with ODOT (G. Harrington) certified traffic developed for the Sawmill 'Abbreviated' Feasibility Study (AECOM) will be used for the no -build traffic for the section of Sawmill Road from Hard Road to and including the 1 -270 Interchange. The remaining certified traffic (no -build and build alternatives) will be developed as described in Task 3.0. While development of traffic volumes and analysis of a Saturday peak period is included in later tasks under this modification, it is assumed that a request for ODOT to approve certified traffic for Saturday peak period volumes will not be required. Note that this task includes coordination and submittal of the request(s) for certified traffic and /or certified traffic approval. Development of certified traffic for the expanded study area and analysis scenarios is included under Task 3.0. Task 1.4b — Preliminary intersection layouts • Extend study area for this task to include the additional intersections /driveways counted in the addition to Task 1.1. • The City of Columbus standard Level of Service (LOS) criteria is to obtain an LOS D for each total intersection with no individual movement less than LOS E in the design year; however, it may be necessary to develop project- specific goals for use in evaluating the alternatives. To determine this: • Using Synchro software, determine the AM and PM LOS in the design year for the existing geometry. • Using Synchro software, develop a conceptual layout for a geometry meeting the City of Columbus standard LOS criteria. • Based on the above Synchro, determine if feasible alternatives can be generated using LOS standard criteria or if project- specific LOS criteria is needed. If the latter, recommend an LOS goal for the alternatives. Upon approval of the criteria to be used, proceed to alternative layout. Investigate another corridor concept that includes a third through lane in each direction of Sawmill Road between W. Dublin- Granville Rd. and H and Rd (including through the interchange). As discussed with the City of Columbus, the following intersections will be studied along the corridor, in addition to the Sawmill /Snouffer intersection: Sawmill /SR 161 Sawmill /Banker Sawmill /Federated Sawmill /Billingsley Sawmill / Sawbury Caine /Snouffer Additionally the following right -in /right -out (RIRO) drives on Sawmill Road will be studied: Three RIRO driveways north of Snouffer Rd, along the east side Three (3) operational conditions will be evaluated, for both the existing configuration and proposed corridor concept (with compete third through lane in both directions) from Hard Road to SR 161 in order to establish the project specific LOS goals as follows: a. No -Build b. Alternative that meets LOS requirements per the City of Columbus (increased lanes for existing conditions) c. Alternative intersection that meets project specific LOS criteria Time to conduct /prepare LOS analysis as described above is covered in Task 1.4c below. Task 1.4c — Additional HCS and Synchro Analysis (Addition to Task 1.4c, HCS and VISSIM Analysis) • Extend study area for this task to include the additional intersections /driveways counted in the addition to Task 1.1. • Incorporate, with any adjustments suggested by the CH2M team, the AECOM study recommended alternative into at least one of the three proposed alternatives. • For the preferred alternative, provide turn lane length calculations for all dedicated turn lanes utilizing ODOT methodology. Note this task in the original contract is for the HCS and VISSIM traffic analysis. Synchro was not included in the base contract. This task will include the incorporation of the AECOM study recommended alternative, specifically for the connector road proposed between Billingsley Road and Sawbury Boulevard, will be incorporated into at least one of the three alternatives that will be evaluated under the current scope of services. The current proposal allows for analysis of up to three alternatives at the Snouffer Road Intersection. It is understood that there has been no alternative recommended for Sawmill Road per the AECOM study and the preferred alternative referred to herein to be incorporated is the preferred connector road alternative. The AECOM study recommended connector road alternative will be incorporated into the selected preferred alternative for analysis. HCS Analysis This task addresses additional HCS analysis for intersections as required by ODOT for the IMS process. Specifically, HCS analysis will be required to be added to the IMS for the Sawmill Road intersection at New Market Center Way intersection. Given that Synchro will now be used for the primary intersection analysis, CH2M has included no time for additional analysis via HCS in this modification. A single additional intersection can be accommodated under the current budget. We are assuming that HCS will be required only to meet ODOT requirements for the IMS and will only be performed for the selected /preferred alternative and will be accommodated under the amount originally budgeted for HCS in the base contract. irU Turn Lane Storage Calculations This task also includes analysis of turn lane storage calculations for the preferred alternative for the study area intersections and drives. Specifically turn lane storage analysis for all dedicated turn lanes will be performed for the following intersections /drives: • Sawmill Road at W. Dublin- Granville Road • Sawmill Road at Banker Drive /Sawmill Place Boulevard • Sawmill Road at Village Parkway/ Federated Boulevard • Sawmill Road at Snouffer Road • Caine Road at Snouffer Road • Sawmill Road at Dublin Center Drive • 1- 270 /Sawmill Road (ramps) • Sawmill Road at New Market Center Way • Sawmill Road at Billingsley • Sawmill Road at Sawbury Boulevard • Sawmill Road at Hard Road • The RIRO driveway on the east side between W. Dublin- Granville Road and Banker Drive /Sawmill Place Boulevard • The RI driveway on the east side between Banker Drive /Sawmill Place Blvd. and Federated Blvd. • Both RIRO driveways on the east side between Federated Blvd. and Snouffer Rd. • the three RIRO driveways along the east side between Snouffer Rd. and the I -270 interchange Synchro This task includes development of Synchro analysis to analyze two corridor configurations (Corridor Concept 1: no- build; Corridor Concept 2: requested alternative that includes three full through lanes from Hard Road to SR 161 in both directions) per the LOS analysis /evaluation process as described above under 1.4b. It is understood that this process will be used to set the design condition for the study area intersections with the exception of Snouffer Road. Synchro analysis will also be prepared for up to three additional Snouffer Road Intersection Alternatives under the two corridor conditions using the same LOS analysis /evaluation process as described under 1.4b. Once a preferred design alternative has been selected for the corridor and the Snouffer Road intersection, the alternative will be tested via Synchro under Saturday traffic volumes. See task 3.0 for details on development of certified and Saturday traffic volumes. (Note: VISSIM analysis under original base contract and as expanded per 1.4.c.1, and for Saturday, if authorized, will be performed for only one corridor lane configuration as determined to be the preferred via Synchro analysis.) Task 1.4d — Environmental data review • Extend study area for this task south to and including the Sawmill Road at W. Dublin - Granville Road intersection and east to and including the Caine Road at Snouffer Road intersection. 11 Task 1.5 — Planning level cost estimates • Extend study area for this task south to and including the Sawmill Road at W. Dublin - Granville Road intersection and east to and including the Caine Road at Snouffer Road intersection. This task will include preparing cost estimates for the additional intersections per Task 1.4b. CH2M assumes two cost estimates will be prepared at each intersection (one for 5 -lane and one for 7- lane). Task 1.6a — 30% Draft Report • Extend study area for this task south to and including the Sawmill Road at W. Dublin - Granville Road intersection and east to and including the Caine Road at Snouffer Road intersection. Task 1.6b — 90% Draft Report • Extend study area for this task south to and including the Sawmill Road at W. Dublin - Granville Road intersection and east to and including the Caine Road at Snouffer Road intersection. Task 1.6c — Final Report • Extend study area for this task south to and including the Sawmill Road at W. Dublin - Granville Road intersection and east to and including the Caine Road at Snouffer Road intersection. • Include with the final report submittal all final Synchro files. Task 1.7 — Project Management • Extend study area for this task south to and including the Sawmill Road at W. Dublin - Granville Road intersection and east to and including the Caine Road at Snouffer Road intersection. • Conduct a meeting with the City of Columbus and City of Dublin to review the preliminary alternative layouts generated by Task 1.4b to determine the alternatives to be carried to the Task 1.4c. • Conduct a meeting with the City of Columbus and City of Dublin to review the results of Tasks 1.4c, 1.4d, and 1.5 prior to proceeding to Task 1.6a. "If Authorized" Tasks Task 1.4c VISSIM Analysis • Extend study area for this task to include the additional intersections /driveways counted in the addition to Task 1.1. This task includes additional VISSIM analysis to analyze the expanded area and Snouffer Road Intersection concepts under one corridor scenario. Specifically into separate "if authorized" sub tasks are proposed: 5 12 Task 1.4.c.1 if authorized - VISSIM Analysis- Expanded Study Area for One Corridor Option (Hard to SR 161) This task expands the VISSIM study area to the limits proposed by the City of Columbus, north to Hard Road and south to W. Dublin- Granville Road, and adds to the study area the additional intersections /drives as described in this modification under Task 1.1 Task 1.4c.2 if authorized - VISSIM Analysis — Saturday Traffic (No Build and one corridor alternative) This task includes VISSIM analysis for the recommended alternative under the Saturday peak period traffic volumes as described /developed under Task 3.0 in this modification. Note these tasks assume the determination of the number of through lanes on Sawmill Road will be determined using Synchro, and applied to the expanded VISSIM model. The VISSIM model will then be used to test the Snouffer Road intersection alternatives as described in the original base contract proposal scope, for the expanded study area. Task 2.0 — Analysis of Sawmill /Banker Road intersection • Included above. Task 3.0 — CH2M development of Certified Traffic • Extend study area for this task to include the additional intersections /driveways counted in the addition to Task 1.1. This task includes the expansion of the certified traffic development to include the additional intersections /driveways counted in addition to Task 1.1. This task also includes the development of traffic volumes for Saturday peak period for the additional intersections /driveways counted in addition to Task 1.1. Since model data will not be available for Saturday conditions, a growth rate based on available historical count data from the study area and immediate vicinity will be applied to project Saturday counts to future opening day and design year Saturday traffic volumes. Task 4.0 — Interchange Modification Study (IMS) • No change requested. Per discussions with ODOT, additional HCS analysis will be required to meet IMS requirements under the proposed revised corridor study area. Specifically, in addition to the previously noted HCS analysis locations, the intersection of New Market Center Way with Sawmill Road will need to be added to the IMS study area. This task includes incorporation of the intersection analysis into the IMS and more detailed discussion of alternatives considered and dismissed. No additional effort is required for this task. 13 ENGINEERING AND TECHNICAL SERVICE COST PRICE PROPOSAL AND LABOR RATES FOR Sawmill /Snouffer Intersection Study CONSULTANT: CH2M HILL PROJECT DESCRIPTION: Sawmill /Snouffer Intersection Study Task # Task Description Proposal Date: 0321/16 Revised Date: 05/11/16 Overhead Percentage = 104.50% Net Fee Percentage = 12.00% Cost of Money = 0.55% Hourly Total Labor Overhead Cost of Direct Subcon Net Total Rate Hours Costs Costs Money Costs Costs Fee Cost 1.01 Project Description 1.1 Sawmill existing corrdor review /data collection /traffic counts $40.20 34 $1,367 $1,428 $7 $0 $7,350 $336 $10,489 1.2 City of Columbus traffic/utility coordination $59.62 8 $477 $498 $3 $0 $0 $117 $1,095 1.3 Setup GIS mapping and ROW $43.33 4 $173 $181 $1 $0 $0 $43 $398 1.4a Coordination /Review ODOT Developed Certified Traffic $43.29 12 $519 $543 $3 $0 $0 $128 $1,193 1.4b Preliminary intersection layouts $44.32 128 $5,673 $5,929 $31 $0 $0 $1,396 $13,029 1.4c Additional HCS and Synchro Analysis (Addition to Task 1.4c, HCS and VISSIM Analysis) $40.53 444 $17,996 $18,806 $98 $58 $0 $4,428 $41,386 1.4d Environmental data review $52.83 24 $1,268 $1,325 $7 $0 $0 $312 $2,912 1.5 Planning level cost estimates $37.27 80 $2,982 $3,116 $16 $0 $0 $734 $6,848 1.6a 30% draft report $47.37 48 $2,274 $2,376 $12 $100 $0 $559 $5,322 1.6b 90% draft report $47.37 32 $1,516 $1,584 $8 $100 $0 $373 $3,581 1.6c Final report $44.92 20 $898 $939 $5 $100 $0 $221 $2,163 1.7 Project Management $47.77 88 $4,204 $4,393 $23 $460 $0 $1,034 $10,114 Total $42.68 922 $39,348 $41,118 $215 $818 $7,350 $9,682 $98,530 1.4.c.1 If Au ViSSIM Analysis - Expanded study area for one corridor alternative (Hard to SR 161) $34.65 140 $4,851 $5,069 $26 $0 $0 $1,194 $11,140 1.4.c.2 VISSIM Analysis - Saturda traffic No -build and one corridor alternative $38089 184 $7,156 $7,478 $39 $52 $0 $1,761 $16,486 3.0 CH2M development of Certified Traffic $36.31 150 $5,447 $5,6921 $30 $0 $0 $1,340 $12,509 4.0 Interchange Modification Study #DIV /0I 0 $0 $0 $0 $0 $0 $0 $0 Subtotal "if Authorized" tasks $36.82 474 $17,454 $18,239 $95 $52 $0 $4,295 $40,135 Total of All Tasks 0 $40.69 1,396 $56,802 $59,358 $310 $8701 $7,350 $13,976 $138,665 (AVG.) 14 DETAILED BREAKDOWN OF PROPOSED TOTAL HOURS, PERSONNEL CATEGORIES, AND LABOR RATES FOR Sawmill /Snouffer Intersection Study CONSULTANT: CH2M HILL PROJECT DESCRIPTION: Sawmill /Snouffer Intersection Study Task Task* Task Descrintinn Proposal Date: 0321/16 Revised Date: 05/11/16 Overall EN -7 I EN -6 I EN -5 I EN-4I EN-3 I EN -2I EN -1 I T-5 I T-4 I T-3 I T-2 I T-1 I Office Hours Costs 1.0 Project Descrip Raw Hourly Rates EN 3 $4194 T-4 $34 38 EN -7 $85.70 EN 2 $3512 T-3 $2796 EN -6 $71.82 EN $3115 T-2 $2428 ENS $59.62 6 T-1 $21.01 EN 4 $49.65 T 5 $4333 Office $2840 Overall EN -7 I EN -6 I EN -5 I EN-4I EN-3 I EN -2I EN -1 I T-5 I T-4 I T-3 I T-2 I T-1 I Office Hours Costs 1.0 Project Descrip 1.1 Sawmill existing condor review /data collectionftmffc counts 0 6 0 0 0 16 12 0 0 0 0 0 0 34 $1,367 1.2 City of Columbus traffic/utility coordination 0 0 8 0 0 0 0 0 0 0 0 0 0 8 $477 1.3 Setup GIS mapping and ROW 0 0 0 0 0 0 0 4 0 0 0 0 0 4 $173 1.4a Coordination /Review ODOT Developed Certified Traffic 0 0 4 0 0 8 0 0 0 0 0 0 0 12 $519 1.4b Preliminary intersection layouts 0 0 32 0 0 48 0 48 0 0 0 0 0 128 $5,673 1.4c Additional HCS and Synchro Analysis (Addition to Task 1.4c, HCS and VISSIM Analysis) 0 0 124 0 0 160 160 0 0 0 0 0 0 444 $17,996 1.4d Environmental data review 0 8 0 0 0 0 0 16 0 0 0 0 0 24 $1,268 1.5 Planning level cost estimates 1 0 0 1 8 1 0 0 40 0 0 32 0 0 0 0 80 $2,982 1.6a 30% draft report 0 0 24 0 0 24 0 0 0 0 0 0 0 48 $2,274 1.6b 90% draft report 0 0 16 0 0 16 0 0 0 0 0 0 0 32 $1,516 1.6c Final report 0 0 8 0 0 12 0 0 0 0 0 0 0 20 $898 1.7 Project Management 0 8 32 0 0 0 0 24 0 0 0 0 24 88 $4,204 Total 0 22 256 0 0 324 172 92 32 0 0 0 24 922 $39,348 1.4.c.1 ViSSIM Analysis - Expanded study area for one corridor alternative (Hard to SR 161) 0 0 8 0 0 66 66 0 0 0 0 0 0 140 $4,851 1.4.c.2 VISSIM Analysis - Saturda traffic No -build and one corridor alternative 0 0 40 0 0 72 72 0 0 0 0 0 0 184 $7,156 3.0 CH2M development of Certified Traffic 0 0 18 0 0 66 66 0 0 0 0 0 0 150 $5,447 4.0 Interchange Modification Study 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 Subtotal "if Authorized" tasks 0 0 66 0 0 204 204 0 0 0 0 0 0 474 $17,454 Total of All Tasks 1 0 22 1 322 0 0 528 1 376 92 32 0 0 0 24 1396 1 $56,802 15 8 SUMMARY OF DIRECT COSTS Sawmill /Snouffer Intersection Study Proposal Date: 0321/16 Revised Date: 05/11/16 PROJECT DESCRIPTION: Sawmill /Snouffer Intersection Study Mileage I Copies / I Total Direct Task Description 1$0.575/mi.l I Reproduction I Postage I Misc. I Costs Task Description 1.0 Pr 1.1 Sawmill existing corrdor review /data collection/traffic counts $0 $0 $0 $0 $0 1.2 City of Columbus traffic/utility coordination $0 $0 $0 $0 $0 1.3 Setup GIS mapping and ROW $0 $0 $0 $0 $0 1.4a Coordination /Review ODOT Developed Certified Traffic $0 $0 $0 $0 $0 1.4b Preliminary intersection layouts $0 $0 $0 $0 $0 1.4c Additional HCS and Synchro Analysis (Addition to Task 1.4c, HCS and VISSIM Analysis) $58 $0 $0 $0 $58 1.4d Environmental data review $0 $0 $0 $0 $0 1.51 Planning level cost estimates $0 $0 $0 $0 $0 1.6a 30% draft report $0 $100 $0 $0 $100 1.6b 90% draft report $0 $100 $0 $0 $100 1.6c Final report $0 $100 $0 $0 $100 1.7 Project Management $460 $0 $0 $0 $460 1.4.c.1 Total Vi SSIM Analysis - Expanded study area for one corridor alternative (Hard to SR 161) $518 SEE— $0 $300 $0 $0 $0 $0 $0 $818 $0 1.4.c.2 VI SS IM Analysis - Saturday traffic (No -build and one corridor alternative) $52 $0 $0 $0 $52 3.0 CH2M development of Certified Traffic $0 $0 $0 $0 $0 4.0 Interchange Modification Stud $0 $0 $0 $0 $0 Subtotal "if Authorized" tasks $52 $0 $0 $0 $52 wr Total of All Tasks $570 $300 $0 $0 $870 iR ID Task Name Start Finish Duration December January February March April May June July August Oeptembe October November December January February March April May 1 Authorization for Sawmill /Snouffer Intersection Study Mon 2/8/16 Mon 2/8/16 0 days 2 Traffic Operational Analysis and Alt. Development Mon 1717115 Fri 515117 370 days 3 Obtain traffic counts Mon 12/7/15 Fri 4/8/16 90 days q Receive MORPC traffic model runs Mon 3/21/16 Fri 4/22/16 25 days 5 Data Collection Mon 3/14/16 Fri 4/8/16 20 days 6 VISSIM model development and calibration Mon 3/28/16 Fri 7/29/16 90 days 7 Develop Certified Traffic existing /no-build and corridor concept 2 Mon 425/16 Fri 6/10/16 35 days 8 ODOT Review of Certified Traffic Mon 6/13/16 Fri 8/12/16 45 days 9 Update and resubmit ODOT Certified Traffic Mon 8/15/16 Fri 9/2/1615 days 10 ODOT Approval of Certified Traffic Mon 9/5/16 Fri 10!7/16 25 days 11 Alternative development meeting with Columbus and Dublin Fri 8/12/16 Fri 8/12/16 0 days 12 Analyze Opening Day and Design Year traffic Mon 8/15/16 Fri 1021/16 50 days 13 Alternative Development Progress Meeting Fri 9/16/16 Fri 9/16/160 days 14 Submit 30% draft report Fri 1021/16 Fri 1021/16 0 days 15 Review of 30% report Mon 1024/16 Fri 11/11/16 15 days 16 Meeting to review 30% report comments Fri 11/11/16 Fri 11/11/16 0 days 17 Update traffic analysis and concepts Mon 11/14/16 Fri 1223/16 30 days 18 Meeting with Dublin, Columbus, ODOT to review concepts Fri 1223/16 Fri 1223/16 0 days 19 Develop 90% report and IMS document Mon 1226/16 Fri 127/17 25 days 20 Submit 90% report and IMS document Fri 127/17 Fri 127/170 days 21 90% Report Review Mon 1/30/17 Fri 3/10/17 30 days 22 Meeting to review 90% report and I MS document Fri 3/10/17 Fri 3/10/17 0 days 23 Update report and IMS document for ODOT submittal Mon 3/13/17 Fri 324/1710 days', 24 Submit revised IMS to ODOT Fri 324/17 Fri 324/17 0 days 25 ODOT review of IMS Mon 327/17 Fri 421/17 20 days 26 Meeting to review ODOT comments Fri 421/17 Fri 421/17 0 days 27 Address IMS comments Mon 424/17 Fri 5/5/1710 days 28 Submit Final report and IMS Fri 5/5/17 Fri 5/5/17 0 days 17 10 Appendix A Subconsultant Proposal il:, s �MA"T s- SERV ■CEO, ■NC_ $ Surveying • Environmental ■ Traffic ■ CA/CM s An Ohio EDGE Certified Firm March 1, 2016 Mr. Andrew Wolpert, P.E. CH2M HILL 1103 Schrock Road, Suite 400 Columbus, OH 43229 Re: Sawmill Road & Snouffer Road Intersection Analysis (Traffic Counts II) Columbus, Ohio Smart Services, Inc. is pleased to present this proposal to conduct traffic count services for the project referenced above. This proposal describes our understanding of the project, outlines our approach and presents our fee for the services. PROJECT UNDERSTANDING Weekday- Saturday Signalized Intersections Turning movement counts are needed for eleven (11) hours which are 6 -9 am, 11 am -1 pm, and 4 -7 pm on a typical weekday (Tuesday, Wednesday, or Thursday) and 3 hours from 11 am -2 pm on a Saturday at three intersections. Classification of vehicles (Cars and Trucks) will be performed and pedestrians will be counted. The turning movement counts are needed at the following locations: *Sawmill Road at W. Dublin - Granville Road *Sawmill Road at Banker Drive /Sawmill Place Boulevard *Caine Road at Snouffer Road Saturday Signalized Intersections Turning movement counts are needed for three (3) hours (preliminary hours are 11 am -2 pm) on a Saturday at two intersections. Classification of vehicles (Cars and Trucks) will be performed and pedestrians will be counted. The turning movement counts are needed at the following locations: *Sawmill Road at Village Parkway /Federated Boulevard *Sawmill Road at Snouffer Road Weekday- Saturday Unsignalized Intersections Inbound and outbound volume is needed for eleven (11) hours which are 6 -9 am, 11 am -1 pm, and 4 -7 pm on a typical weekday (Tuesday, Wednesday, or Thursday) and three (3) hours from 11 am -2 pm on a Saturday at 7 locations. The volume will not include classification of vehicles or pedestrians. The volume is needed at the following locations: *Right- in/right -out (RIRO) driveway on the east side of Sawmill Rd. between W. Dublin- Granville Rd. and Banker Dr. /Sawmill Place Blvd. *Right-in (RI) driveway on the east side of Sawmill Rd. between Banker Drive /Sawmill Place Blvd. and Federated Blvd. 88 W. Church Street 1900 Crown Park Court, Newark, Ohio 43055 Columbus, Ohio 43235 740.345.4700 9 614.914.5543 Proposal — Sawmill Road & Snouffer Road Intersection Analysis Smart Services, Inc. Columbus, OH 3/01/2016 *North RIRO driveway on the east side of Sawmill Rd. between Federated Blvd. and Snouffer Rd. *South RIRO driveway on the east side of Sawmill Rd. between Federated Blvd. and Snouffer Rd. *North RIRO driveway on the east side of Sawmill Rd. between Snouffer Rd. & I -270 *Middle RIRO driveway on the east side of Sawmill Rd. between Snouffer Rd. & I -270 •South RIRO driveway on the east side of Sawmill Rd. between Snouffer Rd. & I -270 SCOPE OF SERVICES Smart Services will perform the counts described above. Because of the number of counts, all of the counts cannot be performed at the same time. We will attempt to collect the Saturday data in two Saturdays but depending on the schedule for the project it could take as many as three Saturdays which may allow us to get started sooner. We will also need to be advised of Saturdays that may not be considered typical around spring break. The official deliverable for each location will be a PDF file of the reports formatted from the count software. Excel files will be provided which will have the volumes but may not be formatted consistent with the PDF files. No manipulation of the data or analysis will be performed. It could take one to two weeks after the data is collected for the data to be available. Exclusions It is assumed that no permits or authorizations are required in order for us to perform traffic counts within the road right -of -way. If permits or specialized requirements are mandated, our proposal will need to be revised. FEE Our fee to complete the base scope of services described above will be a lump sum of $7350. You will be invoiced monthly based on the progress of the work. Vandalism, equipment failures and other factors beyond our control impact our ability to meet a schedule. We look forward to working with you on this project. If you have any questions, please let us know. Sincerely, SMART SERVICES, INC. �i► Todd J. Stanhope, PE, PTOE Director of Traffic Engineering Submitted: One electronic copy (PDF format) via e-mail Enclosure: Contract with Terms & Conditions 20 2