HomeMy WebLinkAboutOrdinance 024-16RECORD OF ORDINANCES
24 -16 (Amended)
No. Passed 20
AN ORDINANCE AMENDING THE ANNUAL
APPROPRATIONS ORDINANCE FOR THE FISCAL YEAR
ENDING DECEMBER 31, 2016
WHEREAS, the Ohio Revised Code requires, when necessary, amendments to the
annual appropriations ordinance be made in order that appropriations are not over
expended; and
WHEREAS, it is necessary to amend the annual appropriations ordinance to provide
funding in certain budget accounts; and
WHEREAS, at the beginning of each year, it is necessary to appropriate
unencumbered balanced in various funds to authorize those funds for debt
payments, project- related expenditures and other miscellaneous expenses.
NOW, THEREFORE, BE IT ORDAINED by the Council of the City of Dublin, State
of Ohio, of the elected members concurring, that:
Section 1. There be appropriated from the unappropriated balance in the General
Fund the amount of $122,500 as follows:
Finance
10110290 - 711001 County Auditor Deductions $6,500
10110290 - 711003 Real Estate Taxes $66,000
Planning
10120720- 712008 Planning Services $50,000
Section 2. There be appropriated from the unappropriated balance in the State
Highway Fund the amount of $75,025 to account 20280320- 735006 (Street
Maintenance Projects) for the Bridge Street School Flashers and to cover legal
expenses of the fund.
Section 3. There be appropriated from the unappropriated balance in the
Hotel /Motel Tax Fund the amount of $150,000 to account 23240220 - 751001 (City
Sponsored Projects) for the Art in Public Places project.
Section 4. There be appropriated from the unappropriated balance in the Special
Assessment Debt Service Funds the total amount of $225. Of that amount, $200 is
to be allocated to account 32090290- 711001 and $25 to account 32190290 - 711001
for County Auditor's deductions on real estate tax settlements.
Section S. There be appropriated from the unappropriated balance in the Capital
Construction Fund the amount of $7,520,200 to account 40480320 - 735004 for the
cost of constructing the roadway improvements surrounding Bridge Park (as
approved within the Development Agreement), making improvements to North High
Street, extending North Riverview, and expanding the Service Center. The funding to
the Capital Construction Fund will come from an advance from the General Fund.
Seclion 6. There be appropriated from the unappropriated balance in the Woerner-
Temple TIF Fund the amount of $3,000 to account 41210290- 711001 for County
Auditor's deductions on real estate tax settlements.
Section 7. There be appropriated from the unappropriated balance in the Ruscilli
TIF Fund the amount of $6,000 to account 41510290- 711001 for County Auditor's
deductions on real estate tax settlements.
Section S. There be appropriated from the unappropriated balance in the Pizutti
TIF Fund the total amount of $68,500. Of that amount, $3,500 is to be allocated to
account 41610290- 711001 for County Auditor's deductions on real estate tax
RECORD OF ORDINANCES
24 -16 (Amended)
Page 2 of 4
Passed 20
settlements, and $65,000 is to be allocated to account 41680320 - 735006 (Street
Maintenance Projects) for the Frantz Road Utility Burial Project (ET122).
Section 9. There be appropriated from the unappropriated balance in the
Thomas /Kohler TIF Fund the total amount of $106,000. Of that amount, $11,000 is
to be allocated to account 41910290 - 711001 for County Auditor's deductions on real
estate tax settlements, and $95,000 is to be allocated to account 41980320- 713004
(Other Professional Services) for the Avery Road widening project, phase 2 — Rings
Road West to Woerner Temple (ET142).
Section 10. There be appropriated from the unappropriated balance in the
McKitrick TIF Fund the amount of $25,000 to account 42110290 - 711001 for County
Auditor's deductions on real estate tax settlements.
Section 11. There be appropriated from the unappropriated balance in the
Perimeter Center TIF Fund the total amount of $26,000. Of that amount, $6,000 is
to be allocated to account 42580320- 713004 for County Auditor's deductions on real
estate tax settlements, and $20,000 is allocated to account 42580320- 713004 (Other
Professional Services) for the Avery- Muirfield Drive north corridor improvements
(ET040).
Section 12. There be appropriated from the unappropriated balance in the Rings
Road TIF Fund the amount of $6,000 to account 42610290 - 711001 for County
Auditor's deductions on real estate tax settlements.
Section 13. There be appropriated from the unappropriated balance in the
Perimeter West 17F Fund the amount of $22,000 to account 43110290- 711001 for
County Auditor's deductions on real estate tax settlements.
Section 14. There be appropriated from the unappropriated balance in the Upper
Metro Place TIF Fund the total amount of $13,000. Of that amount, $3,000 is to be
allocated to account 43210290- 711001 for County Auditor's deductions on real estate
tax settlements, and $10,000 is to be allocated to account 43280320 - 735004 (New
Street Construction /Engineering Services) for the Post Road Utility Burial Project
(Ef141).
Section 15. There be appropriated from the unappropriated balance in the
Rings /Frantz TIF Fund the amount of $5,000 to account 43310290 - 711001 for
County Auditor's deductions on real estate tax settlements.
Section 16. There be appropriated from the unappropriated balance in the Historic
Parking TIF Fund the amount of $1,000 to account 43610290- 711001 for County
Auditor's deductions on real estate tax settlements.
Section 17. There be appropriated from the unappropriated balance in the
Perimeter Loop TIF Fund the amount of $1,000 to account 44210290- 711001 for
County Auditor's deductions on real estate tax settlements.
Section 18. There be appropriated from the unappropriated balance in the Tartan
West TIF Fund the total amount of $313,000. Of that amount, $15,000 is to be
allocated to account 44310290- 711001 for County Auditors deductions on real estate
tax settlements, $8,000 is to be allocated to account 44310290 - 713005 (Misc
Contractual Services) for an outside review of the Tartan West TIF revenues, and
$290,000 is to be allocated to account 43380320 - 735006 for design of the Avery
Road /Brand Road roundabout.
Section 19. There be appropriated from the unappropriated balance in the
Shamrock Blvd. TIF Fund the amount of $1,000 to account 44410290 - 711001 for
County Auditor's deductions on real estate tax settlements.
RECORD OF ORDINANCES
Fam Nn.
24 -16 (Amended) Passed Page 3 of 4 20
Section 20. There be appropriated from the unappropriated balance in the River
Ridge TIF Fund the amount of $1,200 to account 44610290- 711001 for County
Auditor's deductions on real estate tax settlements.
Section 21. There be appropriated from the unappropriated balance in the Lifetime
Fitness TIF Fund the amount of $2,000 to account 44710290- 711001 for County
Auditor's deductions on real estate tax settlements.
Section 22. There be appropriated from the unappropriated balance in the Irelan
Place TIF Fund the amount of $1,000 to account 44910290 - 711001 for County
Auditor's deductions on real estate tax settlements.
Section 23. There be appropriated from the unappropriated balance in the Shier
Rings Road TIF Fund the amount of $1,000 to account 45010290- 711001 for County
Auditor's deductions on real estate tax settlements.
Section 24. There be appropriated from the unappropriated balance in the
Shamrock Crossing TIF Fund the amount of $2,500 to account 45110290- 711001 for
County Auditor's deductions on real estate tax settlements.
Section 25. There be appropriated from the unappropriated balance in the Bridge
and High Street TIF Fund the amount of $2,500 to account 45210290- 711001 for
County Auditor's deductions on real estate tax settlements.
Section 26. There be appropriated from the unappropriated balance in the Dublin
Methodist Hospital TIF Fund the amount of $2,500 to account 45310290- 711001 for
County Auditor's deductions on real estate tax settlements.
Section 27. There be appropriated from the unappropriated balance in the Kroger
Centre TIF Fund the amount of $4,000 to account 45410290 - 711001 for County
Auditor's deductions on real estate tax settlements.
Section 28. There be appropriated from the unappropriated balance in the
Frantz /Dublin Road TIF Fund the amount of $200,000 to account 45580320- 713004
(Other Professional Services) for the Bridge Street District — Western Roads
Alignment Study (ET16C).
Section 29. There be appropriated from the unappropriated balance in the Delta
Energy TIF Fund the amount of $1,000 to account 45610290- 711001 for County
Auditor's deductions on real estate tax settlements.
Section 30. There be appropriated from the unappropriated balance in the Bridge
Street Fund the total amount of $2,377,965. Of that total, $1,536,965 is to be
allocated to account 45710420- 719006 (Contractual Obligations) for the
compensation agreements signed with the Dublin City School District and Tolles
Technical Center, $585,000 is to be allocated to account 45780320- 735004 (New
Street Construction /Engineering Services) for the COTA Park and Ride Project
(ET411), and $256,000 is to be allocated to account 45796290- 741000 (Transfer
Expense) to transfer funds to pay debt service.
Section 31. There be appropriated from the unappropriated balance in the Vrable
TIF Fund the amount of $1,100,000 to account 45880320- 735004 (New Street
Construction /Engineering Services) for the construction of John Shields Parkway,
phase 1 (ET149).
Section 32. There be appropriated from the unappropriated balance in the West
Innovation TIF Fund the amount of $100 to account 45910290- 711001 for County
Auditor's deductions on real estate tax settlements.
RECORD OF ORDINANCES
Farm NO.30MI
Ordinance No. 24 -16 (Amended) POSSPd Page 4 of 4 20
Section 33. There be appropriated from the unappropriated balance in the Tuller
TIF Fund the total amount of $7,800,000. Of that total, $7,760,000 is to be allocated
to account 46180320 - 735004 (New Street Construction /Engineering Services) and
$40,000 is to be allocated to account 46180320 - 735001 (Land and Land
Improvements), both associated with the construction of John Shields Parkway,
phase 2 (ET145).
Section 34. There be appropriated from the unappropriated balance in the Nestle
77F Fund the amount of $750 to account 46210290- 711001 for County Auditor's
deductions on real estate tax settlements.
Section 35. There be appropriated from the unappropriated balance in the Water
Fund the amount of $200,000 to account 61096290- 741000 for transfer expense.
Section 36. There be appropriated from the unappropriated balance in the Sewer
Fund the amount of $200,000 to account 62096740- 741000 for transfer expense.
Section 37. There be appropriated from the unappropriated balance in the Agency
Fund the total amount of $25,500. Of that total, the amount of $15,000 is to be
allocated to account 80510210- 755007 (Refunds) for remittance to the State of Ohio
of the commercial 3% building charge, $500 to account 80510210- 4755013
(Refunds) for refunding hydrant permits, and $10,000 to account 80510210- 7558014
(Refunds) for refunding of school programs.
Section 8. This ordinance sDall take effect and be in force in accordance with
Section 04(a) of the Revised)Charter.
day of // C,[/JA . 2016
Acting C 11 of Council
Cityof Dublin
Office of the City Manager
5200 Fmerald Parkway o Dublin, OH 43017 -1090
Phone; 614 - 410.4400 1 Fax; 614-410 -4490
Ta: Members of Dublin City Council
From; Dana Lo McDaniel, City Mana
Initiated ��: Angel L. Mumma, Director of Finance
Jerry Faegler, Director of Strategic Initiatives and Special Project
Date: July If 2016
Memo
Re: Ordinance No 24.16 (Amended) - Amending the Annual Appropriations
for Fiscal Year Ending December 31, 2016
Background
Ordinance Na. 24 -16 amends the annual appropriations far the fiscal year ending December 311
2016 in the General Fund and in various other funds to provide sufficient funding in certain budget
accounts, During the first reading of the Ordinance on June 27, 2016, Council requested additional
information regarding a number of the funding requests,
The information, as presented in the initial staff report dated June 23, 2016 is shaven in bold,
followed by the response to Council's questions,
Section S appropriates funding in the Capital Construction fund for the cost of
roadway improvements within the Bridge Street District as well as the renovations to
the Service Center.
As part of the Development Agreement with Crawford Hoying for the Bridge Park
Development, the City is responsible for the roadway network surrounding Blocks B
and C (east side of the Scioto River) as well as minor improvements to North High
Street (westside of the Scioto Rr "ver- Block ZJ Bond proceeds in the amount of $11.�
million have been used to fund the improvements around Block C and on High Street,
and were based upon early stage design cost estimates put together in early 1015,
Also, additional dollars were used to initiate more extensive improvements to High
Street, associated with the larger High Street total reconstruction to occur later this
year These High Street improvements are included in the $94 million programmed in
1016 for the Historic District Columbus N'etropolitan Library Street Network. Given
the work that needed to be lane an High Street in conjunction with the private
development on the west side of the Scioto River, it was determr "ned to be in the best
interest of the City to advance the i"ndian Run retaining wall associated with the High
Street improvements to better coordinate the work with the adjacent private
development. The additional $4,863,000 being requested reflects the actual bids and
the updated cast estimates for completing the roadways, required under the
Development Agreement, as well as the North Riverview extension. Council was
updated an these items during the Bridge Street District update during Council "s 1016
Goal Setir'ng
Memo re, Ordinance 2416 (Amended) — Amending the Annual Appropriations for the Fiscal Year Ending
December 31, 2016
July 1, 2016
Page 2 of 4
Council asked for clarification regarding the extent to which the $4,863 million appropriation was
attributable to cost increases of the original $11,1 million Bridge Park roadway estimates or due to
other factors (such as increased scope), The City will be reimbursed for the majority (if not all) of
the Bridge Park infrastructure costs (roadways for Blocks B, C and Z as well as the Block B and C
parking garages) through TIF revenues, backed by minimum service payment guarantees,
generated on the private development project, The developer is responsible for the costs for all
other internal roadway improvements and parking garages within Bridge Park, The agreement
included the early 2015 roadway cast estimates for Blocks C and B roadways of $9.9 million (of the
$111 million estimate), and it also established a fair share allocation of attributable costs
assignable to the project that were associated with the two City roadway projects located adjacent
to Bridge Park West (estimated at approximately $1,2 million of the $11,1 million) for Black Z, as
these two roadway projects had not yet been designed by the City, The funds to meet the
requirements of the Development Agreement were appropriated when bonds were issued in the
fail of 2015 The agreement also made provisions for the developer to construct all of the
roadway improvements on the Bridge Park Fast project, and portions of the roadway projects an
the Bridge Park West project through the City's standard infrastructure reimbursement agreement
process.
The actual costs for Blocks B and C roadway improvements were $12,010,969, approximately $2.1
million over the original $9.9 million 2015 estimates included in the Development Agreement The
City closely reviewed these bids and the project expenses and agreed that the improvements did
cost $12,010,969, Some of the escalation occurred because of increased material and construction
costs that occurred since the preparation of the original estimates, some due to higher project
coordination casts associated with building the roadways in the midst of an extraordinary volume
of nearby, ongoing building construction activity (not typical in a suburban setting), and some due
to the addition of underground facilities like Dublink(the cost for same of which will be reimbursed)
and other improvements included in the final approved construction plans, Therefore, $21 million
of the originally proposed $4,863 million appropriation is associated with that cost increase
associated with the Bridge Park East roadways,
For the Bridge Park West project, the City of Dublin performed the design for both the North
Riverview extension (from North Street to Dublin Road at its intersection with Indian Run Drive),
as well as for the reconstruction of High Street (from North Street to Indian Run Drive)a The full
North High Street reconstruction was incorporated with the City's adopted 2016 — 2020 CIP and
will be bid by the Ciry later this year, A piece of that project, specifically the roadways` retaining
wall located along the east side of High Street, aver the Indian Run waterway, made sense to
perform early by the developer because of the private construction activity happening at and near
that location, Council was updated on that project during its March 11, 2016 Goal Setting
workshop. That city improvement cost approximately $527,000 (as a result, the High Street
roadway project to be bid later this year should be approximately $527,000 less), This cost
increment is new scope, and is not related to any cast escalation associated with the work
contemplated in the original $11.1 million estimate and appropriation.
As was also discussed at this year's Goal Setting session, there are a number of benefits to and
needs for proceeding now with the construction of the full length of the City's North Riverview
extension project (rather than the partial construction required of the City within the Bridge Park
Development Agreement). This roadway will be needed to facilitate the construction of the
Memo re, Ordinance 24 -16 (Amended) — Amending the Annual Appropriations for the Fiscal Year Ending
December 31, 2016
July 1, 2016
Page 3 of 4
Fedestrian bridge, and will, in general, lessen the construction impacts of several projects on the
Historic District, The City has completed this design, and the roadway is now positioned to move
forward, Once completed, this roadway will be the primary vehicular access way to and through
the City's new West Side River Park,
Based an the actual bid results (which were opened on Wednesday, June 29, 2016), the cost of
the full length of North Riverview extension is approximately $2,2 million, which include a 10%
contingency, This amount is lower than the estimate in which the original $4,863,000
supplemental appropriation was based on when Ordinance Na, 24w16 had first reading on June 27,
2016, This extension was also included within the City's approved 2016 -2020 CIP but was
originally programmed for 2018 at an estimated cost of $2 million, ,
Finally, funding in the amount of $500,000 has been programmed for the retaining wall for the
west side plaza, This project wil! likely need to move forward in the near future due to
construction sequencing associated with the pedestrian bridge, roadways, and private
development projects, Staff anticipate this project being completed through an infrastructure
reimbursement with the developer due to their presence in the area and the need to coordinate
the construction with other work,
In conclusion, Staff is requesting that the original supplemental appropriation within Section 5 of
Ordinance Na, 24 -16 in the amount of $4,863,000 be modified as a result of the actual bid for the
North Riverview extension being opened since the first reading of the Ordinance, The revised
amount is $4,481,500, The explanations provided in the preceding paragraphs detail the added
casts but to summarize, the additional casts is as follows:
Blacks Band C - $2,100,300 (due to higher actual cost of the original scope)
North Riverview - $1,354,000 (based on actual bids which include the addition of the haul road,
which was not required by the Development Agreement and represented additional scope
for a separately approved City project)
North High Street Retaining Wall • $527,200 (representing additional scope far a separately
approved City project)
West Side Plaza Retaining Wall - $500,000 (estimate based on the North High Street retaining wail,
and representing additional scope for a separate approved City project)
Total $4,481,500
Therefore, a little aver half of the increase in the appropriation wil! fund other City approved
capital projects which are outside the scope of the infrastructure of the Bridge Park Development
Agreement and not contemplated within the original $11,1 million Bridge Park roadway
improvements,
Sect, ion 3� appropriates funding within the Taller T�F Fund for the canstruc�ian of aSP,
phase 2A Per Resolution No, 08.16, approved February 22, 2016, the project was
awarded to Nickolas Savko and Sons with a bid of $2,711,264,50 The budgeted
amount for this project in the 2016.2020 Capital Improvements Program was $23
million, The improvements that will be constructed as part of ]SP, phase 2 include
Memo re, Ordinance 24 -16 (Amended) — Amending the Annual Appropriations for the Fiscal Year Ending
December 31, 2016
July 1, 2016
Page 4 of 4
3,100 feet of new roadway; storm sewer; AEP duct bank (reimbursable to the City);
street lighting and electric; permeable pavers; brick walkway and cycle track;
demolition of temporary C01'A Park &Ride, and trees and planting,
As part of the 2016 — 2020 CIP, staff discussed issuing debt to fund this improvement
Until a bond package is prepared (anticipated to be in the 3'd or 4t" quarter of 2816),
funding will be advanced from the General Fund i'he service payments generated from
the Tuller Flats development will ultimately be used to fund the debt service
Council requested additional information regarding the cost of Jahn Shields Parkway phase � as
compared to phase 1, On April 7, 2016, a memo was provided to Council that indicated that the
fatal construction cast per linear foot for phase 1 was $3,805 while phase 2 is $2,967, A copy of
that memo is attached,
Additionally, Council requested information regarding the cast to demolish the COTA Park and Ride
site. The demolition of the temporary COTA Park and Ride is included in the as part of the $7.7
million construction contract awarded to Savka Of the $7,7 million, the demolition of the
temporary site was approximately $7,500 of the bid amount,
Cityof Dublin
office of the City Manager
6200 Emerald Parkway •Dublin, OH 43017.1090
Phone: 614 °4104400 •Fax; 614 -410 -4490
utaiil,J
Toy Members of Dublin City Council
�rom; Dana L, McDaniel, City Mana
Date April 7, 2016
Initiated Bye Barbara A, Cax, PE, Acting Director of EngineeringJCiry Engineer
Mandy K, Bishop, PE, SI, Bridge Street District Program Management
Consultant
Rea Jahn Shields Parkway Street Tree Planter Design and Construction Cast
Information Update
Summary
As fallow up to questions from City Council regarding the placement of structural sails during the
John Shields Parkway Bid Acceptance at the February 22, 2416 meeting, staff is transmitting and
expanding on the July 9, 2015 memorandum regarding Jahn Shields Parkway Street Tree Punter
Design and Construction Costs,
Outlined in more detail in the attached memorandum, the plan intent for John Shields Parkway,
Phase 1(the 350 feet section located just south of the recently opened skilled nursing facility, The
Grand) tailed for Structural Soil to be installed between the punters, Specifically, the soil was to
be placed in the four feet wide space between planter beds Unfortunately, the plans lacked clarity
an this item and inspections revealed that the structural sail installation was not performed before
the concrete walks were in place.
Since the construction of this very small section of John Shields Parkway, Phase 1, three (3) sets of
construction documents (SR 161/Riverside Drive Roundabout (Part 1), Riverside Drive Realignment
(Part 2) and John Shields Parkway, Phase 2) have included a mare explicit structural soli
construction detail that was not a part of the original Jahn Shields Parkway, Phase 1 construction
documents, Detail 8, Sheet 248, attached as Exhibit A, clearly depicts the depth and location of the
soil,
In addition to the inclusion of this detail regarding the placement and location of structural soils,
an inspector has been assigned the specific responsibility of ensuring the proper installation of the
structural sail, and the project team specifcally reviews this installation with the contractor prior to
start of construction, Ultimately, the plan modification and assignment of a lead inspector to
oversee structural sail installation has been established to safeguard against the reoccurrence of
the issue experienced during john Shieids Parkway, Phase 1,
Dublin's current specifications for structural soil placement are consistent with the current regional
' "best practices" (it is consistent, for example, with Downtown Streetscape Standards adapted by
the Ciry of Columbus in October 2015, and is consistent with the recommendations afthe
experienced landscape architects of MKSK for similar applications), Strategic placement of the
structural sail offers two things: it provides a continuous planting bed to promote proper rant
growth so that projected tree heights and healthy canopies can be realized, while helping to
ensure that the budget impacts of structural soil are appropriately managed.
John Shields Parkway Street Tree Planter Design and Construction Cost Information Update
April 1, 201fi
Page 2 of 2
For example, the most recent bid price for structural soil is $205 per cubic yard This compares to
$4,60 per cubic yard for embankment/standard sail,
If far example, the structural sail placement zone was further expanded and widened for Jahn
Shields Parkway Phase 2 project to include the area beneath the brick sidewalks, an additional
65,144 square feet at a depth of two (2) feet (2fl of structural soil would be required, at an
additional cost of approximately $1,000,000 The City's consultant team does not believe such an
expansive zone of structural soil is needed to ensure the successful growth and health of the
specified trees.
Also during the February 22 Council discussion, reference was made to the per foot construction
cast of Jahn Shields Parkway, Dublin`s very first Bridge Street District roadway project was the
35D feet section of John Shields Parkway, Phase i, The total construction cast per linear foot was
$3,805, which included the high quality, long life cycle materials such as granite curb, brick pavers,
street lighting, sewer, permeable pavers, plantings as approved by City Council (as well as
including the reimbursable AEP duct and manhole system),
The John Shields Parkway, Phase 2 project includes the much longer 2,550 feet section of John
Shields Parkway, Phase 2 and Graham Street reflects a cost per linear foot of $2,961, including the
same granite curb, brick pavers, street lighting and electric, sewer, permeable pavers, plantings as
well as AEP duct and manhole system (reimbursable).
The higher cast far the first project was likely substantialiy driven by the small, inefficient size of
this project. Ultimately, the bid prices for ]ohn Shields Parkway, Phase 2 are more reflective of the
likely long term investments that Dubiin will be budgeting far the "Signature" Bridge Street District
streets,
Recam�mendation
This memo is provided for informational purposes, We would be happy to further discuss this
information.
w
w
w
w
SEEDING, AS PER PLAN
PLANTING SOIL
FRACTURED SUBGRADE
SUBGRADE
(:D_12"' PLANTING SOIL FURNISHED & PLACED AS PER PLAN TYPICAL PLANTER
SCALE: 1 -1/2" = 1' -0" 2 SCALE: 1 -1/2" = 1' -0"
NOTE:
• CONTRACTOR SHALL
ENSURE PERCOLATION OF
ALL PLANTING PITS /BEDS
PRIOR TO INSTALLATION.
• LOOSEN AND SPREAD OUT
CIRCLING ROOTS WITHIN
PLANT ROOTBALL BEFORE
PLANTING.
2" MINIMUM SPECIFIED MULCH, KEEP
MULCH 1 "AWAY FROM STEMS.
PERENNIAL PLANTINGS, REFER
LANDSCAPE PLANTING PLANS.
ROOTBALL, SET TOP OF BALL 2"
HIGHER THAN FINISHED GRADE.
PERENNIAL PLANTING
3 SCALE: 1 /2" = 1' -0"
GRANITE PLANTER CURB (P8)
ADJACENT PAVING
PLANTING SOIL. REFER
LANDSCAPE SOILS PLANS.
6"
MAX.
io a 0
+00000000+
.... ... 000000000 ... ...
000000000 0
+000000000
..........
00000000��
0 000000000 (D+ + 4
000000000 +0 +
UNLESS NOTED
TREE ROOTBALL
EXTENTS
.K (P2), REFER TO
S
Z CURB (P17) SET
IMS - 2 DOWELS
TINGS AND
CK PAVER WALK
I, REFER DETAIL
.ET 10
)PRENE SHIMS
DOWEL, 2 PER PIECE
,NTING SOIL
JNDED AND COMPACTED
AGGREGATE TO
'PORT ROOT BALL
CTURED
!GRADE
ISTURBED
GRADE
UNLESS NOTED
Exhbit A
NOTES:
1. CONTRACTOR SHALL ASSURE PERCOLATION OF ALL PLANTING PITS PRIOR TO
INSTALLATION.
2. FINAL TREE STAKING PLACEMENT TO BE APPROVED BY OWNER.
3. PLANTING PIT TO BE EXCAVATED THREE TIMES (3x) THE WIDTH OF THE ROOT BALL AND
BACKFILLED WITH PLANTING SOIL MIXTURE.
4. MARK THE NORTH SIDE OF THE TREE IN THE NURSERY, AND ROTATE TREE TO FACE NORTH
AT THE SITE WHEN EVER POSSIBLE.
5. IF PLANT IS SHIPPED WITH A WIRE BASKET AROUND THE ROOT BALL, CUT THE WIRE BASKET
IN FOUR PLACES AND REMOVE.
6. REMOVE ALL TWINE, ROPE, WIRE AND BURLAP FROM TOP HALF OF ROOTBALL.
7. SET TREE PLUMB IN PLANTING PIT.
8. EACH TREE MUST BE PLANTED SUCH THAT THE TRUNK FLARE IS VISIBLE AT THE TOP OF
THE ROOT BALL. TREES WHERE THE TRUNK FLARE IS NOT VISIBLE SHALL BE REJECTED.
DO NOT COVER THE TOP OF THE ROOT BALL WITH SOIL. TRUNK FLARE SHALL BE NO MORE
THAN 1 " -2" ABOVE GRADE.
STAKING PLAP
120
120
ARBORTIE
TWO 2" X 2" X 8' HARDWOOD
STAKES, SPACE EVENLY
AROUND TREE.
TREE GATOR BAG OR
APPROVED EQUAL
3" MULCH LAYER AS
SPECIFIED. DO NOT LET
MULCH CONTACT TRUNK
PLANTING
4" HIGH EARTH SAUCER
BEYOND EDGE OF ROOT
BALL.
GRANITE PLANTER PLANTING SOIL MIXTURE AS
CURB (P8) SPECIFIED.
TAMP SOIL AROUND ROOT
BALL BASE FIRMLY WITH FOOT
PRESSURE SO THAT ROOT
BALL DOES NOT SHIFT.
COMPACTED #57 MOUND TO
SUPPORT ROOT BALL
FRACTURED SUBGRADE
(:-TYPICAL PLANTER - PLANTING ENLARGEMENT TREE STAKI
2" = 1' -0" 5 SCAL3/4" = 1
JAUVVAY (F-1)
'ER CURB, 22" X 6"
'AL SECTIONS
\NTINGS AND
ER CURB, 6 1" X 6" (P8),
CTIONS
TALK (P2), SEE DETAIL
IEOPRENE SHIMS
;S DOWEL, 2 PER PIECE
LANTING SOIL
IOUNDED AND
OMPACTED #57
,GGREGATE TO
UPPORT ROOT BALL
RACTURED
UBGRADE
NDISTURBED
JBGRADE
NOTE:
• CONTRACTOR SHALL ASSURE
PERCOLATION OF ALL PLANTING
PITS /BEDS PRIOR TO
INSTALLATION.
• IF PLANT IS SHIPPED WITH A
WIRE BASKET AROUND THE
ROOT BALL, CUT THE WIRE
BASKET IN FOUR PLACES AND
FOLD DOWN (1 /3 OF ROOTBALL
HEIGHT) INTO PLANTING HOLE.
SHRUB PLANTINGS, REFER
LANDSCAPE PLANTING PLANS.
2" MINIMUM SPECIFIED MULCH, KEEP
MULCH 1 "AWAY FROM STEMS.
GRANITE PLANTER CURB (P8)
ROOTBALL, SET TOP OF BALL 2"
HIGHER THAN FINISHED GRADE.
6 PLANTER AT ADA RAMP TYPICAL 7 SHRUB PLANTING
(:
SCALE. 1 -1/2 = V-0" SCALE: 1/2" = 1' -0"
ADJACENT PAVING
PLANTING SOIL. REFER
LANDSCAPE SOILS PLANS.
BRICK PAVER WALK (P2)
REFER TYPICAL SECTIONS
6" VARIES, REFER PLANS 6„ GRANITE PLANTER CURB,
L L I v REFER TYPICAL SECTIONS
LANDSCAPE PLANTINGS
AND MULCH
I �al�i�Ii�IiD�OIi
SS DOWEL, 2 PER PIECE
PLANTING SOIL
24" STRUCTURAL SOIL,
UNDISTURBED
SUBGRADE
24" STRUCTURAL SOIL FURNISHED & PLACED AS PER PLAN
(�)_ SCALE: 1" = 1' -0"
jUj
U
U 41 = V
J � U
Q
U
Tom_
a�
Q N
M
O O (O
1E O)
=10 O N
� � M
(n E
V
N � (O
O
v U Ci
J
LU
a
IO
LU
a—
a
U)
Z
a
J
\W
/_ Z
W
C
W Z
LL Q
W W
I.L
,(E 0 F
C,.�P
M L GE
r ' 621
E�ti�,��� 248
S �pu11ui11m� ��
cq
PE PR �51
Construction Set
Office of the City Manager
5200 Emerald Parkway • Dublin, OH 43017 -1090
City of Dublin Phone: 614.410.4400 • Fax: 614.410.4490 M e m o
To: Members of Dublin City Counc'
From: Dana McDaniel, City Mana
Date: July 9, 2015
Initiated By: Megan O'Callaghan, Director of Public Works
Re: John Shields Parkway Street Tree Planter Design Information
Summary
The City has received some inquiries regarding the street tree planters along the newly
construction section of John Shields Parkway. The purpose of this memo is to provide Council with
detailed information about the design and actual as built information associated with these street
tree planters. These design details are planned to be utilized throughout the Bridge Street District
as a part of transportation improvement projects. Staff collaborated with Darren Meyer with MKSK,
the landscape architect for this project and other Bridge Street District projects, on the design
details as well as the content of this memo.
Planting Zone — Is the Soil Deep Enough to Support Tree Growth?
The root systems of most trees are shallow and widespread. 90 -99% of a tree's root system is in
the upper 2 -3 feet of soil. The design specified 28" of planting soil. The actual excavated depth
was 28 -30" per the inspection logs. In addition, the design specified the first 6" of earth below the
planting soil zone to be fractured (disturbed). This results in a root zone depth of 34 -36 ". Please
see the attachment for background and details.
Underlying Soils — Will Poor Soils Beneath the Tree Limit Tree Growth?
The primary role of underlying soils in a roadway project is to provide a stable foundation for the
street and sidewalk pavements. Because these soils are heavily compacted (thus limiting tree
growth), the soils within the planting beds were removed and imported soils were installed in the
planting zones. The existing subsoil in the planters was specified to be disturbed to a depth of 6"
to better integrate imported soils with existing subsoils. Inspections have verified that the soil
installed meets the specification.
Structural Soil — Should it be Placed Under Adjacent Pavement?
Due to the heavy compaction of soils to support pavement in roadway projects, the lifespan and
long term health of street trees can be severely limited by small, inadequate spaces for roots to
spread. Structural Soil is a mix of stone aggregate and soil that can balance the need for
pavement support with the air space needed for root growth. The John Shields Parkway plan
intent was for there to be Structural Soil between the planters. Specifically, the soil was to be
placed in the 4 foot space between planter beds. Unfortunately, the plans were not clear and
inspections indicate the structural soil installation was not performed. A discussion of the remedy -
cutting the concrete in the area of the structural soil location and replacing earth with the
structural soil - led the team to the conclusion that the solution could result in settlement of the
concrete between the planter beds and result in a poor installation. In this area, the planter beds
are 30 -40 feet long and in one case, 100 feet long. Therefore, the benefit of tearing out the
concrete and replacing the soil between the planter beds with structural soil would be outweighed
Memo re. John Shields Parkway Street Tree Planter Design Information
July 9, 2015
Page 2 of 2
by the potential for failure /settlement of the concrete between planter beds. Staff will ensure
future plans and installations accomplish the structural soil under the adjacent paved surfaces
between the planters.
#57 Aggregate Under the Rootball - Will Stone Used to Support the Tree Rootball Inhibit Growth?
The plan specified 6 -12" of #57 aggregate to be installed to provide a stable media for the root
ball to rest on to prevent settling and therefore decline and possible tree death. Trees planted too
low are susceptible to collar rot, root rot and girdling roots (see Attachment — 150502 JSP Tree
Planting Soils Exhibits.pdf). The inspection logs indicate 12" of #57s installed and then the planting
soil was placed around the #57s in the planter beds.
Recommendation
This memo is provided for informational purposes. We would be happy to further discuss this
information.
Street Tree Planter - Construction Detail (longitudinal section through planter, parallel to street)
John Shields Parkway: Street Tree Planter Design M KS Y
P ,
Street Tree Planting Concerns
Inadequate Planting Depth (28 ")
Background: The root systems of most trees are shallow and
widespread (see Figure a). 90 -99% of a tree's root system is in
the upper 2 -3 feet of soil (Urban, 2008; Crow 2005; Harris, Clark &
Matheny. 2004). In addition to the naturally shallow rooting structure
of most tree species, trees that are commercially available through
the nursery industry are selected for shallow root systems and
trained to eliminate tap roots and deep roots. This facilitates the
transplanting process and improves survivability after transplant.
Designed for JSP: The proposed depth of imported planting soil
for the John Shields Parkway is 28 This imported soil is placed on
top of existing soils that have been fractured to a depth of 6" which
effectively extends the rootzone depth to 34 ". Two inches of mulch is
placed on top of the planting soil to moderate soil temperature and
preserve soil moisture.
Poor Underlying Soils
Background: The primary role of soils (subgrade) beneath a
roadway project is to provide a stable foundation for street and
sidewalk pavements. The subgrade is modified (if necessary) and
compacted under carefully controlled conditions to ensure the
longevity of the pavement. The soil compaction required to support
pavements is not conducive to tree growth because the density of
the soil does not allow root growth. For this reason, compacted soils
within street tree planting areas are typically modified (fractured) or
removed and replaced with more suitable planting soil.
Designed for JSP: The compacted soils within the planting area
for street trees have been removed and replaced with imported
planting soil to a depth of 28" (see No.1 above). In addition, the top 6'
of subgrade at the bottom of the excavated planting areas has been
fractured to encourage drainage and remove compacted hardpan
soil interface between existing and imported soil.
3. No Structural Soil Under Adjacent Paved Surfaces
Background: Due to the heavy compaction of soils in urban
environments, particularly in areas under and adjacent to pavement,
the lifespan and long term health of street trees is severely limited
by small, inadequate root zones (refer to the Background in No.2
above). In the mid- 1990's, researchers at Cornell University
introduced and later patented a mix of angular aggregate and soil
(structural soil) that could be compacted to support pavement while
still providing the pore space needed for root growth. Over the past
20 years, research of trees planted with structural soil has suggested
that the volume of soil is the critical limiting factor in tong term tree
survivability. Given that structural soil is comprised of approximately
20% soil and 80% rock, very large volumes of structural soil are
required to support the long term growth of trees.
Designed for JSP: To create an environment that supports long
term tree growth, soil volume must be maximized. Open planters
(8ft wide by 32ft long) have been designed to be filled with planting
soil which provides the maximum nutrient and water capacity
for tree growth. Structural soil, which should be limited to areas
underneath pavement (Bassuk), is provided between planters and
thus creates interconnected soil volumes. Though linear in nature,
the interconnected open planters provide a cost effective way to
increase effective soil volume and support the long term health of
trees (Urban, 2008.)
4. #57 Aggregate Under the Rootball
Background: The installed depth of the tree relative to the finish
grade of soil placed around the rootball is of critical importance.
Trees set too low in the planting hole or placed on uncompacted
soil (which will tend to settle with the first waterings or major rain
events) are susceptible to a number of detrimental conditions. Collar
rot, root rot, and girdling roots (Figure b) are a few of the problems
that can cause decline and death of the tree and are attributable to
low placement in the planting hole.
Designed for JSP: In order to provide proper support for the tree
within the planting hole, a small pad of compacted #57 aggregate is
proposed underneath the rootball. This pad prevents the tree from
settling and also contributes to positive drainage around the base of
the tree. Due to the fact that the vast majority of trees have shallow,
spreading root systems and that nursery -grown trees are specifically
trained to encourage lateral root spread (refer to the Background in
No.1 above), the pad does not inhibit root growth or create deficient
growing conditions for the tree.
Sources:
Bassuk, undated. CU-Structural Soil: An Update After More Than a Decade
of Use in the Urban Environment
Crow, 2005. The Influence of Soils and Species on Tree Root Depth
Harris. Clark & Matheny, 2004. Arboriculture. 4th ed.
Urban, 2008. Up By Roots
Del
1
32
4
5
Figure a. Tree Root Architecture
Source: Harris, Clark & Matheny, 2004. Arboriculture. 4th ed.
Figure b. Girdling Roots
John Shields Parkway: Street Tree Planter Concerns & Design Decisions MKS K
"SKSTUMS COW
.i
U
.J
7
J'
•r
OIJ FCOF(.Wd
.Nr -1b far PW-0
6• —f
mm 304 - App. Ban (Empt I' -,0' ryA 5. �.m ----w W SNm m
N P- -.bf. P.amsnt Ana.) bad aurb (bSArd d WM ara»
k .k.w mm Curb Fm b PW-0
At DETAIL C: ITEM 609 - GRANITE CURB (18" x 6 ")
Not To Salo
- - - - - - - ., - .. .. .. ..
8W.n, a. SOUM 6W
Nadrbd Ad.
Cara OO 71 /bb B..Wh —b
b.se Oer Apppmh Br
MOl.P Apppof b lfo
11111' Sgava FWw Fabd . Canpacbd
bft..— mp d —t. b..a and Subyrad,
b.ft— f blhni— -ttbp bad
Boa
DETAIL F: BRICK PAVER WALK AND GRANITE PLANTER CURB
Nat I. Seal.
Sw LanAa'aP. Lepwt for
D6t611 K: Weeo Hole DEW
NTS.
NL.p /bb eA.I M bmlydod f PW—t .M B*k Pow
Obk 0—db P— RM aW B&k Pont ONa..W N.
.eparab Oer1..d pl,—f WW be made.
LEGEND
Ahem 118 - 1.76'A.pbag nnnaf. &vNev Cc— (f/Wb.n BWbA 14^01 -77
A.. 407 - NW- MW Tne1An. rook Caaf Ar Mernredlob C-- (A00 W3* Yd)
9— 110 - 1.73 -AW.rf naavat. bfrfnoafda C.— (M.4— fi.NAA PCM -77
Al— 407 - Nw -I/Y r.. w— r.ak C..f (ADO ad/Sp H[)
Am 301 - 6• AV60 Obacrla BaM AC64 -1212
R.m .r04 - 6.14VWmf. 8ua
Ram .10f - /• App W t. Ba.. (breke*d .0 mo dnr Av..•O
Abm AOf - A avp Obrrlo.ebbn aW Pkmof Abdq
R.rre SPW - &*k Pow MA ($w Mal F an STS./ 4)
Ram 60 - V-W. Bbnd (10'. 67 (S.. ANaf D an Shaaf /)
R.m 609 - dmB. nab (16'. 67 (S•• D.W C an SArf I)
Ram OW - r.A.W A W.W and /bard (r-47
Ram 069 - S'&.W I0' neb (5.e ObW J an Sh-f 1)
Ira am - S..Brq t NRNp, w Pr Pbn
Ram MO - 0- Appnpob 0ma.
Rom 110 - ES' Aplrnl Carr Wf Alf a C—, (LNdbn Fmlk.4 FW4 -21
fa.rrr.abb LbF fins. 7�2 647 am4akd Ar Ptp —f .An P.nr..b6b yPbnr Rmdaq')
Ab. 0 A— (/ f 1/17 (bSMdad fa- PO—W .0 P.,n.obb A— R -d.w')
fbm SPCC - AW qpets Ob.. (Aka 67 MO-) (1' C—&-*d /Nab-0
Ram SPCC - Appngob Am (Ala 12 &,* (r 16' Aft Sw PIM A Pmf9a SA.af b wl.bb 04,6v
Rent SPCC - P -msabb Pow R.-VW (S a Mah A A, 0)
/faro SPCC - G.. (Pb- LASH Ma 1 Starr and aa— 6lof dm, Fob* m bottom any)
A— 701 - G WfAr Fable• rA. D
Rem we - Caowfa 0m (1-47
Ram 607 - C—A. H.W (12', 67 (S•. Drfaf E as 9Saf 1)
C. C.
17• p. J' T
• r ' OIJ FCOF (&.k, d T 01J - fzJ (inbd•d
,h cob for P Mgt) W P)—t)
s ry J ry
crmrw te•d&v and SIWn to
11— J04 App. B.w (E&..pt A f 1M —6 Nwm Ja - .b9. Buy (EU.W r' rD' r Cawb ObtldN ad SIY�� m
h Prnr.abb Pbwrwrf A ) b PYrrrr.abb Pbr.nsnt Ana.) MvM curt (b Ardd .M ab
k.A.W MD Cub Fn ksk.W MD neb Far mr PW-0
�>•rr.nf DETAIL D: ITEM 609 - GRANITE BAND 118" x e"1 �+nant
DETAIL E: ITEM 609 - GRANITE BAND Or x 6 "1
Not To Soar. Not To So.N
(PYand.
=d 67
aeb a .1d..af)
Pow fbM
Brfa1 A — (4U'k2 -"7
A75' BL.Iliasa Ago/m1 S1 BW (PDOd-Y1)
Ar•�Aa .. M drd A%~ Adk-W
I I'
Pbaannnr.nf &I *.bb 6 1 Y J 1 6
SOa0ad Abnkp Oa'^ �aabf- dick Mr DAe.q
6• R.m 504 - Appr.ppfe Ab .
O• A4rrr Jos - C n bb..
14�00
m
DETAIL H: ASPHALT BIKE PATH REPLACEMENT
App0v m T Vbr AVpo DA.
Far Mob not W.— — ME, SCO RO-06
DETAIL G: ASPHALT DRIVEWAY WITH BRICK INSET
DA r. Sm
Land.cgp. L,wd far Ab PON-
.6. . 6'
P
114-1
A. Pr Pm.
Pnrnrrrf R.rN p-
PprWfd Cv/rofrt (bn.rste,
Goss B
/B ar X37 Apprayob 6•
DETAIL J: STRAIGHT 18" CURB Eon» ObaMA krakd
Nd ro Satire
F &f —t M. — CWnb- WD 12000
Y
W
oQ
J =
=a
U)
2
I
O
mfsamHmH I
.110x/ a.rm K - R.S Het Oab1
John Shields Parkway: Structural Soil in Typical Section M KSY
W
E
C
L
L
i ! ' o o °oo 0000s ° °o° o■°oo 00o n °b ono ° _ }/ �� f
I
� � " ■ � ■ � l � / - ��/ is Z Q
ooe
-----------------
e _ /
I LEOElID
' rtEw uH1r oEeCRP71IXi KEY NOTES Y
J SPEC WYD PIANTW0801�PLACED oo °oo° a BEEDErAuAsI�ETN '
SPEC CU VD STRUCTURAL S: • . PLACED 6EE DETAIL& BHEETM
pd
* ..awe ■
John Shields Parkway: Structural Soil in Landscape Plans M KSK
MKSKSTUDIOS :CM
John Shields Parkway: Structural Soil in Plan Quantities M KSK
VK5KSTL.OI0S L0M
SPEC
SPEC
SPEC
SPEC
SPEC
REE F.
SHEET
STATION
M!60
NO.
NO.
KKK
b
9
ii
FROM
TO
CU YD
CU YD
EACH
EACH
EACH
O
40
683 +28.18
889 +90.69
304
O
40
883 +28.18
689 +90.89
30
n
41
863 +28.18
887 +42.00
3924
0
41
883 +26.18
887 +42.00
3924
41
883+28.18
887 +42.00
9
42
667 +42.00
869 +90.69
3413
8
42
887 +42.00
889 +90.69
3413
42
867 +42.00
889 +90.69
7
2
y�
m
W
IL
a
z
z
5
TOTALS CARRIED FORWARD TO GENERAL SUMMARY
304
30
15
7337
7337
T
a
REVISMS
REV DATE OESCftlP1pN
K
a�
Df W
91
W d
A
8 W-4 VI DIWITDVES UP MD
V2 DUANTDIES AODEO t6 OF ph
=
0
* 9wry
�•• .4°
44
John Shields Parkway: Structural Soil in Plan Quantities M KSK
VK5KSTL.OI0S L0M
0
n
lJ
0
PLANYINO SOH. roam
9WYARY
A SECDOM INCLUDES
PLANTING SOL
1.J DEFMDOMS
A BACXNL• THE EARN USED TO REPIACf OR TE ACT Of
ROLAOD EARN N AN EXCAVATION. a FMSH MOE'
EIEVAIKW OF FMRED SI.WFACE OF 1OPSOL
C 9UBORAW. SURFACE OR ELEVABW Or SUBSOM.. RO"WINO
VIER EXCA VA WIN IS COMPLEX OR I E REP
SURFACE OF A ALL OR BAOFLL BEFORE WSm IS PLACM
LI SiBMT1ALS
A PRODUCT DATA FOR EACH TYPE OF PRODUCT NOYG70,
NQO.pMC SOLE
I PRECONSRNCTIYYF TESFNG APWIED MRSON. & ORGANIC
AMENDMENT A FOR TOPSN, BARRY MAMMAL TEST
REPORTS FOR RE FOLLO■,VG
1) IEXRIE ANN. YBS (; SAID, BE AND OA r)
7) USDA n XRNE MASS
J) PM
4) SML9E SALTS CONTENT
5) OPGAVIC MArRR RWRNT (ASIM 07974-87
MENGE; C)
5) MFrnmr ANALY95 (PLANT AVAILABLE
PHOPI CRUS POTAS9ULG C !CAA{ MAaM9UGO
OM MANGANESE ERIC. COPPER AND BMW)
0. FOR ORGANIC AMMAINNE SULMT MAMMM. TEST
REPORIS FOR RE FOLOWND (ICE OLM amulm,
WIN US !IMPOST CMIFtS TEST MERMRS FOR IRE
EXAMNA LEN OP COIPOSTNC AND COMPOST Tie=
UNLESS OT ERWSE MOrAROk
1) PH
7) SOLUBLE SAL IS mmmvr
J) ORGANIC MAFIV CONTENT (ASTM D7974 -87
MEIMm O)
4) CARSON 10 NYROGEN RADON
5) SOH. VITA MAIUCTI ftlEX
5) Masnour CaYTENr
7) NDIRENF ANALM (MMATE MM049X
PHOSAWOR ILM POTASSIUM, CALCIUM MAME9ULL
WON MANGMF, aNC COPPER, BORON AND SODIUM
(1011101 TO PER AER493 OR NOV-221 FOR SOL -LESS
MEDIA)
8) FEAR AETAL COMMIT (7NECC 04,05)
c PRODUCT CIRTLPRCA7ES FOR EACH CEVCAAL SOL
AMENDMENT AND FERTUBR MATERCU
A MWRTEx PLAIN FOR FBAN9QRMD, SMINQ
PLACING AND SEINING NSTALLED MAIERALS
MLUING WIEEl Lab DATA FOR EARNW]RK
EQIPWENT PLAN TO BE SBMTRD TB0 LIFERS N
ADVANCE OF SOL 0ELIMRY AND NSTALLATON.
a QUALEICA7WN DATA INGUDE LIST OF SOAR
PROAMIS COPLEIED BY NSALLER lE1MISiRAiNG
MTALLOM CAPAMLNES AND ED'ERNAZ MALICE FROECr
NAMES ADDRESSES AND SEAR OOFIETEA AND MILL DE
NAMES AND ADDRESSES OF OINERSA CONTACT PERSONS
1.5 QUALITY ASSURANCE
A SQL -T: SOD LABORATORY GUALIMCABONT AN Mk7DEDENT
MR UNIVERSITY LABQMIMY, RECOGNIZED BY RE STATE
OEPMAENT O' A(RIMA TIRE WIN HE EIPERDNZ AND
CAPABILITY ro CDIDUCT RE TESFNC RDICAIED AND NAT
SPEWUffS W TYPES OP 7EsR5 ID BE PEAFOBEG
A PREP ALLAWN CQIRVOM EI CONDUCT COAFER/AOE AT
PRRCECT LE POUR ro MIALLADOM C SOL.
IS DEUMRY, SIOPAGE AND MAUDLIN:
A PACKAGED MATERIALS DCPMR PACKAGED MATCBALS
N CBYNUL, UANIEED CNAMENS SHOVING WORT,
GERNED ANAL= NAME AND ADDRESS OF MANIFACRXMR AND
WKAnON OF CONFORMANCE WIN STAE AND FEDERAL LAOS F
APPLICABLE.
6 BULK MATERIALS
I. MANGE SOL MAY WEN SO. MOSRAE 6 SUCH TNT BE
Sat B PRIA&E Sat SNOWD HARD FOCL7NFR N CLOTS AS IT
B BEM HAMMED,
A 00 NOT SLOPE I PSOL MATERIAL N STOC PIES
GREATER /NAM TOUR FEET N HEIGHT a DO HOT COMER
TOSCL SIOCIMES WN AN INPERVIm COMB
Y DO Nor DUMP GT SLOPE BUK mAnga s TEAR
STRUCTUIUM UFXJ ESQ WALKWAYS AND FAFMMNTS OR OAF
E057EN0 ILW AREAS OR PLANTS
1 PROVIDE ETE09W- COPIRLL W:ASlRES ro TREmr ER0.9LW
OR DISPLACEMENT OF BLUO MATERIALS DMARCE Or
SO.- BEARNB 11470 RUNOFF, AND AWBORE DUST MONO
O
AOMONT PRCPERNES
TINTER CONVEYANCE SYSTEMS OR WALKWAYS
4. ACCOMPANY EACH DELIVERY OF BULK FWMRERS
AND Sat AMMWFNTS WITH APPRO'RAIE CORIFMAIES
1.7 FEW COIOIDONS
A FEW IEASUREMO /S M1W' Y ACNAL GRACE EIEYADOVA
SERVICE AID UTILITY LOCADOQ AID D409MM OF CWWUOFS
COASTRUCDOV BY FEUD MFASMEINNIS BEFORE PROCEEDING WN
WORK.
a Ammemm OF EXWWG SERVICES OR UMPIES 00
NOT N1901UP SERVICES OR URU ES TO FAgL1ES OCCUPIED
BY OAF" OP OTEMB CHESS PoWnED UNDER 7FE
FOLLOWING MWITIGNS AND BEN MY Af1ER ARRANOPD M
PROVIDE I& PGRMY SFRMQES OR UMHES ACYOEO/OC TO
REOIYFE]rNTS JAN 47M..
I. DO NOT PROCEED WIN NZOWUPRW w smm
aft UIum WINO? OIMERs WIrmw PEM/59aY.
C WAIVER LMTAIIMOa PROCEED WN SOIL OPIUMDONS MY
WEN EM57M AND FOTECA57ED NEATER CtY9/IOVS PERMIT
OPERATOIS TO EF PERFORMED WEN ADEFICAL AND O INUM
REIRMS MAY BE
OBTAIMM AIRY PN9FCIS OM9M FAVORABLE AEMT&
OffiDDONS ACOOBMNG TO MANUFACNNERS MIEN
PRSUPWNNS AND RAW ANTY AE04MMU MM
PART ? - PI ODMIS
Z FLANYNG SG.
1. PLANRNO SOB.
0 A LOAMY, FRIABE AIERRAL SOH. ESSENMLLY TIES
FDOW FEAVY pP SOF CLAY lMPS S�CNDER$
PLUS % B AL RIDS snots BRU9 u
MA LESS METALS wi,4MV OPOTEIP
sat MAi�S NCEA HE WR�NP DEED --aaA�
MAIERMLS O7 BRIER SUBSTANCES OF A MAEAR DOG'
OR IODIC wILNE WICH MAY M T PLANT GWWIM.
RE SOL BALL BE FREE OF NOXIOUS WEDS SEOS OR
MGETATVF PARIS OF REEDY PLANTS RAIL T BE
MR711ELY COVIROLEO N I E PLAN W ,
0. I E Sat SMALL RE TAKEN FROM THE A MORaW OF A
WELL- ORAAILD SHE AND HAM A USIA SOIL IEMW
OASSFICAILN OF A CLAY LOAM OR LOAM THE
TOPSOIL 944E HAM THE FOLLOWING PARDC E SIZE
UK
6RA1II .475 LESS RAN SE
GAVfl. EGG - 4.70 LESS TAN m
SAM ADS - ZOO 75 - 40 E
SLT am Gas b - SOX
CLA Y MAX a007 70 - JS E
e RE nAPSoX COMPONENT BALL MEET IRE FCLOWNI
REO.NEIIDIM
1) THE PARTXXE SW ANALRSLS AS DEFINED ABOVE
4 IRE PH 9H.YL BE L5 TO aO
J) I E SOC1.9E SALIS TEST SAIL HE LESS TAN 1.5
MMOM/OM
4) TIE ORGANIC MATTER CONINT BULL BE AO TO
LOB FOR SOS. PLACEMENT WINI I7 -OP PM9H WADE
RPSCI PIA09NNT BEEPER NAN 17 -FROW RIM
07,10E SMALL HAVE AN a L W wrIER COVRNT OF
1.59 - 15K
5) TOPSOE SNAIL BE PASSED T ROUCY A LYE ""N
HARP SCEEN MI ONE NICK IRUMMEL SCFEM TOPS01
SHALL Nor BE PULMDUM
6 PROME CRI'M.AWN fROY TE SUFF ER INAT NE
RIPSO. DOS NOT OW ANY IONIC
SUBSTANCES HARMFUL TO PLANT OROLRN
2 ORGANIC AMFDM NT
DE awCANC ANOYQYENr SMALL BE A STAKE LARNE
pL
RICH AS //ppy COY PRCOHM BY THE )
PRODADro eYRT C SUIU. S NCtfflUEWOOEW -G D-
AMM OR OR A CO POSr OERMD PROM M1ED
GREEN Qr N TE BEE EDPo A Zmw" UAU
/V
S
a I E COMPOST BULL BE A MONOGDEM MATERIAL.
ESR NMLLY ME OF SCE. CLODS DAPS ROM AND
SRBES
a 711E COPOST SMALL HAVE A MAN -MADE FOREIGN
wIFIIAL (HARD PLASTICS METAL. OAASS ETC1
A Us SMAOSMMUQ S ME �� AWED ON
c THE' COMPOST SMALL BE SCREE MEP SUCH NAT A
MHNAW OP SON PAS= A USSM J/4 -SEW AND THAT
NO MOW RAN 70C PASSES A US SM Na10 SEVE ON A
CRY m9mr a4sts.
A RE COMPOST SMALL. MAW A PH OF 7.0
N
a3 EN CE OR MNIMED A 1:5 CM-OST/WA&
SLURRY
s IMF COMPOST 9WL NAM A SOLUBLE GUTS CONTENT
IS= RAN LO AOLMMOS PERK ML WEN OEFERINED ON A
1:5 COPOST/MATER SEULRY
P. BE COMPOST 94ALL HAVE AN ORGANIC MMTIER
CWIDNT OP NOT LESS NAN JU BY W70HT
OEERIEEO or AsW 07971 -87 M'TIKD C ON
MATERIAL PASSIM. A US SIRT /4 -gVE
i RE COMPOST SMALL HAVE A CARBON M MMORN
(ON) RATIO LESS WAN 36:1 N I E COMPOST SMALL
HAM A SGLHIA•wTABTY /TCFDI BE7WEN B AND 1.
L RE COPLRr SMALL HAM A ANOSnNE CORTENr N
I E RANGE OF 35X ro SOX
0405 BULL NOT EXCEED THE FOIL USEPPA40
CFR 503 (7010) LIMITS,
CO MZRAIXN
aammiL l:_ ISAIa ND G W I
ARSERN 41
CAOM AI J9
OCIPM 1500
LEAD 300
MER" 17
NICKEL 470
SELO" 100
Aw 7000
.1 RN.INOH' SRO. NOT YfSORE TAKE ONE (I) CO P097E
SAMNVLE UPON ARRIVAL TO BE 97E FROM EACH
500 CUBIC YARDS OR AS REQUIRED BY I E
LANDSCAPE ARCNiECT TOR IESINO
4. SIOCOPENG
CORRAL SnXMW D ON-9T& OF -SITE AND AT
n NE SOURCE SN01AD BE RESTRICTED ro NO MORE TAN
IME NEEDS OF WORT CAN BE USED N A 77 HOUR
PERM U OM NO CAM" SMALL ON-SE OR
OF -91E SIMBO MAMMAL INDEED SOO CUBIC YIDS
STOOPLBS SHOULU BE NO MORE THAN 4 FEET N
MEIONT ro PIEMNT ANADW9C CODIIKNS
WNIN IHAE PEE SMOCA ED COMPOSTS SHOULD BE
nmu EVERY BITER WEEK (MESS Openmir
NSDPUCIE0 BY TIE LANDSCAPE ARO'NIECT) ro
PREVENT ANAMW CODMONS OR BMGSSM WAFER
ABSOPPIM
PART 3 - DIECUBOIN
11 EXALWMATION
A EXAIWNE AEAS ro REWW roP5'al FOR CO IEPINCE WN
REO IDEMEM79 AND CODITMNS AFFECTNG NSTAUAIIGN AMC
PERFMA KE
/. MSRFY THAT NO FORDO OR DEEE70VOW MATERIAL OR
LLDN SUCH AS PANT, PAWT 0109DUT.
PLASMEEOEI GGAiOL OEM FMIUEL PAAVT iNAURR
RNRNIN[ TAR ROM" CaMPOI NA, OR ACE HAS BEEN
DEPOSITED N SOL WPM A PLANING AREA
L 00 NOT MIX OR PUCE SOILS AND SOL AMNO/ENIS N
MIEN, NEE, OR MUDDY CODIZIGM
1 SPIED SOL SP/E, O IMAGING, AND RUNO
OFERA/ONS D R VAD PE7IEC,S LF EXCESSM£ SOL M MVILRE
NON MY OONND POWDOS WEN SOL AND SIBORAOE ARE
ARABLE
A LMFtRMY MWSMN SXCESSUmy CRY SOB. nurB NOT
NORKMI E AND WOOL B TOO OUSFY
A PROCEED WN NSIAUATION DALY AFTER 4RSADSFAC017
CO WINS #LAVE BEEN COBECI D.
C F CONIANNABON BY FORDO OR 0EL£7OIOUS MARDBAL. OR
LION B PRESENT N SOX WNW A PLANOD AREA REMOVE RE
ID
SOX A CavrAMHA7TON As Oman or UNOSt'APE ARONEDT
AND REPLACE WIN NEW MAKING SOL
17 AINPARANN
A PROTECT MUM= URU ES SC[RAUM PAM9EViS AID
ORER FAOU ES AND TURF AREAS AMC E70S/N0 ALMIS FROM
DAMAGE CAUSED BY PLANING OAERATAWS
a ANSIALL ER09O11- CONTROL MEASURES W PREVENT
EDOSON OR DISPLACEMENT ENT CF SOLS AND DISCARD OF SOL-
omm MAIER RUNOF OR Amsew1E DUST ro AaMGNr
PROPETTES AID W1LKWIM
13 PIANYI/0 AREA ESTAW6MENT
A 100SEN SBOMCE OF PLANTING ALFAS TO A "N OF 8
NOES REMOVE STONES LARGER THAN 1 NCH W ANY OLEKAON
AND SPOM ROOTS RUMSX AND OVER COIRAMEOB MATTER
AND LEGALLY L MVW Or REM OF OWNERS FRMYRTY.
1. S4BAD TGPSYN. !KINGLY N 8 -LFM TO OEPNS AS
IarA/ED ON ORAWNaS BUr NO LESS WAR
REQUIRED TO MEET FIMW GRAVES AFTER MAILRAL
SETREMERI 00 NOT .SIVEW F PLANTING SOX dP
SIB(NAW IS FRODD4 MUDDY OR ENESSDE.Y WET.
at FRESH IMAGING: GRACE PLAN/WC AREAS ro A SNO07 4
UPWORM SURFACE RAW WIN LOWS UNIFORMLY FNS
7EXIUPG LKRR KE Y ROLL, RA REMOVE RV= AND PILL
DORESSI NS ro ABET PINION GRADES.
14 CLEANUP AND PROTECDOIN
A DUVVG SL PLACEMENT. KEEP AOMLERT PAMMD AND
CONSIRUCTION CLEAN AND WORK ALFA N AN CROMY CO9DOYO
15 DISPOSAL.
A REMOVE SURPLUS SM. AND WASTE MARTIAL LAC L MM MEW
SL.BSOL ORSRABLE Sat, TRAGM AND DEBRIS AND LEGALLY
005PO.SE OP /RCM OF OWFERs PROPERTY
SMUCNRAL SOIL PLACED
PART 1 - GENERAL
I I SUMMARY
A. TITS SECRON WCLUDS IRE FOLOWNC
I STRR/CNRAL SOX NOPK AND RELATED :HEMS AS INCAIE!
ON IM' DRA VINGS OR AS SPEORED NER£N AND NCLOE;
OJT 15 NOT OWED W, n1E FOLOWNC.
OF O
e5w�
$ % K'c Af
0
O
Bq=
V
I
'a
W
S-
0
34
44
John Shields Parkway: Structural Soil in Specifications (introductory page) M KSK
NKSKSTUDIDS 01A
BIDDER agrees to perform all work described in the CONTRAC7
DOCUMENTS for the following unit prices:
REF (1)
NO ITEM
(2)
DESCRIPTION
BID SCHEDULE
' John Shields Parkway - Phase 1
(3) (4) (5) (6) (5) +(6)
QUANT UNIT LABOR MATERIAL TOTAL
P.M rel 00
CITY OF DUBLIN
(8)
(3) x (7)
TOTAL
EXTENDED
INFORMAL
cairr 1-ti
June 11, 2014
27 -6
14- 014 -CIP
John Shields Parkway: Structural Soil in Bid Tabulation M KSK
MKSKS1UDIOS CGM
AEP DUCT BANK
95
SPEC
6-5 INCH PVC, SCHEDULE 40, CONDUIT CONCRETE
ENCASED IN TRENCH WITH CMSC 912 COMPACTED
GRANULAR MATERIAL
370
f,
$55.00
$35.00
$90.00
$33,300.00
AEP DUCT BANK SUBTOTAL =
33,300.00
LANDSCAPING
96
SPEC
PLANTING SOIL PLACED
304
CU YD
$31.00
$20.32
$51.32
$15,601.28
97
SPEC
STRUCTURAL SOIL PLACED
30
CU YD
$9950
$6623
$16573
$4,971.90
98
SPEC
DECIDUOUS SHADE TREES
15
EACH
$232.00
$154.88
$386.88
$5 803.20
99
SPEC
LANDSCAPE PLANTINGS
3283
SO FT
DO
NOT BID
99A
SPEC
PERENNIAL PLANTINGS
7337
EACH
$5751
$3.83
$9581
$70,28846
99B
SPEC
BULB PLANTINGS
7337
EACH
1 $1001
$0751
$1.751
$12,83975
LANDSCAPING
SUBTOTAL =
1 $109,504.59
June 11, 2014
27 -6
14- 014 -CIP
John Shields Parkway: Structural Soil in Bid Tabulation M KSK
MKSKS1UDIOS CGM
Office of the City Manager
5�QQ Erneraid Parkway � Dubiin, OH 43017 -tQ90
it.,1ty Qi jiumin Phone: 614 -410 -4400 e Fax: 614-410 -4490
Toe Members of Dubiin City Council
From; Dana L, McDaniel, City Mana
Initiated By. Angel LA Mumma, Director of Finance
Date: June 23, 2016
Re; Ordinance Na0 2416 - Amending the Annual Appropriations for Fiscal
Year Ending December 31, 2016
Background
Ordinance No, 24 -16 amends the annual appropriations for the fiscal year ending December 31,
2016 in the General Fund and in various other funds to provide sufficient funding in certain budget
accounts.
Section 1 requests funding authorization in General Fund accounts,
Supplemental funding in the General Fund and many of the City's TIF Funds is requested to
cover the fees for county auditor deductions (Auditor and Treasurer's fees), These are fees
charged by the County for real estate, personal property, estate, motor vehicle license,
gasoline, cigarette and manufactured home taxes to each political subdivision and agency
that receives funding from these to cover their administrative costs of preparing their
settlement statements, The fees are dictated by the Ohio Revised Code, The City allocates
these fees to all funds receiving real estate tax or TIF service payments, Historically, the
City has not budgeted for this cast with the Annual Operating Budget and has requested
supplemental appropriations to cover the expenses as they occur during the course of the
year, This practice may be re- evaluated during this year's Operating budget review,
Supplemental funding is requested in the real estate tax account, The amount originally
budgeted in 2016 for real estate tax payments was $125,000, This amount did not take
into account the purchase of the former Nationwide Mutual Insurance property off of Frantz
and Rings Roads (Ordinance 16 -16), or the judgement entry against Dale Drive Properties
LLC, With regard to the Nationwide property purchase, the City was given a credit at
closing far the property taxes which reduced the purchase price at time of closing, however
that left to the City the responsibility to remit the property taxes to the County, With
regard to the Daie Drive property, the previous owner is responsible for the second half
2015 property taxes payable in June 2016, Because the property is now recorded into the
City's name, the City paid the property taxes but will seek reimbursement from the previous
owner, The real estate tax account has remaining expenses totaling approximately $6,000
for reparations payments to Jerome and Perry Townships that will be made In December.
These reparations payments are also fully reimbursed by the property owner,
Supplemental funding is requested in the Planning Division's planning services account,
The Planning Division has been directed to undertake a framework pion far the West Bridge
Street Corridor, involving consultant services working with city staff and the community.
Memo re, Ordinance 24 -16 - Amending the Annual Appropriations for Fiscal Year Ending December 31, 2016
June 23, 2016
Page 2 of )
This project was not programmed as part of the division`s 2016 work plan and the division's
professional services budget, There are unobligated funds for professional services in the
2016 budget sufficient to cover $10x,000 of the estimated budget The division is
requesting an additional $50,000, for a total project cost of $150,000,
Section 2 requests funding in the State Highway Fund for the Bridge Street eastbound school
flasher and the Dublin Road and Glick Road intersection improvements
As part of the 2016 -2020 CIP, $70,000 was programmed in 2016 for the school flasher located on
Bridge Street/US 33 /SR 161 east of Corbins Mill Drive, Complete General Construction will be
completing the work on this improvement at an estimated cost of $45,330, We are requesting
$50,000 in the event there are change orders related to this project Any unspent amounts will be
deposited back into the State Highway Fund
$25,025 is being requested for costs related to the Dublin Road and Glick Road intersection
improvements. This payment is related to a claim filed by the contractor, Double Z Construction,
for construction delays arising from utility companies failing to relocate their utilities prior to the
start of construction of the project. This hindered the contractor's ability to proceed with work,
resulting in resequencing of work and last productivity This amount was negotiated between the
City and contractor.
Section 3 appropriates funding in the amount of $150,000 from the Hatel/Motel Tax Fund for the
Art in Public Places program, As part of an agreement between the City of Dublin and the Dublin
Arts Council (DAC), DAC is required to use funds from their endowment for the purpose of
commissioning or acquiring art for the City's permanent art collection, The City withholds $75,000
annually from the endowment (which is now 25% of the actual bed tax receipts), for the funding
of the acquisition of art as part of the Art in Public Pisces program
On March 7, 2016, City Council approved, by motion, to award the Art in Public Places commission
to artist Olga Ziemska, authorising the City to enter into contract with the artist for construction of
"'Feather Point" and "Universal Gathering " The amount requested represents two years` worth of
endowment funding that has been withheld from the DAC,
Sections 4 6 7 10 12 13 15 16 17 19 20 21 22 23 24 25 26 27 29 32 34 appropriates
funding in various funds to account for county auditor deductions (as explained in Section 1)
Section 5 appropriates funding in the Capital Construction Fund for the cost of roadway
improvements within the Bridge Street District as well as the renovations to the Service Center,
As part of the Development Agreement with Crawford Haying for the Bridge Park Development,
the Ciry is responsible for the roadway network surrounding Blocks B and C (east side of the Scioto
River) as well as minor improvements to North High Street (west side of the Scioto River —Block
Z). Band proceeds in the amount of $11,1 million have been used to fund the improvements
around Block C and an High Street, and were based upon early stage design cast estimates put
together in early 2015 Also, additional dollars were used to initiate mare extensive improvements
to High Street, associated with the larger High Street total reconstruction to occur later this year,
These High Street improvements are included in the $9.4 million programmed in 2016 for the
Memo re, Ordinance 24 -16 - Amending the Annual Appropriations for Fiscal Year Ending December 31, 2016
June 23, 2016
Page 3 of 6
Historic District Columbus Metropolitan library Street Network, Given the work that needed to be
done on High Street in conjunction with the private development on the west side of the Scioto
River, it was determined to be in the best interest of the City to advance the Indian Run retaining
wall associated with the High Street improvements to better coordinate the work with the adjacent
private development, The additional $4,863,000 being requested reflects the actual bids and the
updated cast estimates for completing the roadways, required under the Development Agreement,
as well as the North Riverview extension, Council was updated on these items during the Bridge
Street District update during Council's 2016 Goal Setting,
Funds will be advanced from the City`s General Fund to the Capital Construction Fund in order to
initially fund the improvements, However, as discussed during the 2016 — 2020 CIE, Staff
anticipate issuing debt for these roadway improvements, The bond proceeds, once received, will
be used to reimburse the General Fund for the advance, Funding for the City's portion of the
Bridge Park roadway network will ultimately come from the TIF revenues from Blocks B and C of
the Bridge Park Development, as well as the TIF revenues received on the H2 Hotel site (former
Cooker Restaurant), These TIF revenues are backed by a minimum service payment guarantee,
Additionally, it is anticipated that approximately $450,000 will be reimbursed by the utility
providers,
$3,038,700 is also being appropriated to initially fund the improvements to the Service Center, On
May 23, 2016 Council approved Res 29 -16 which authorized a $3,038,677 contract with Palmetto
Construction Services for the improvements. This project was programmed in 2016 as part of the
2016 -- 2020 CIP with bonds being issued to finance the project, The bond proceeds, once
received, will be used to reimburse the General Fund for the advance,
Section 8 appropriates funding in the Pizutti TIF Fund for county auditor deductions (as explained
in Section 1) and costs associated with the Frantz Road utility burial project,
The Frantz Road utility burial project had been programmed in prior years' CIP, The additiona
funding requested is related to AEP casts associated with the project,
Section 9 appropriates funding in the ThomasJKohler TIF Fund for county auditor deductions (as
explained in Section 1) and casts associated with the Avery Road Widening —Rings Road West to
Woerner Temple Drive,
The Avery Road widening had been programmed in prior year's Capital Improvement Programs,
with $300,000 being programmed in 2016 for property acquisition, It is not anticipated at this time
that property acquisition will take place until 2017, However, $95,000 is needed for additional
environmental services, These services are necessary tp meet Ohio Department of Natural
Resources — Office of Environmental Service and National Environmental Policy Act (NEPA)
guidelines for the project,
Section 11 appropriates funding in the Perimeter Center TIF Fund for county auditor deductions
(as explained in Section 1) and costs associated with the design of the Avery- MuirfieldJPerimeter
LoopJPerimeter Drive improvements,
Funding far the Avery- Mui�ieldJPerimeter l.00pJPerimeter Drive improvement was programmed in
Memo re. Ordinance 24 -16 - Amending the Annual Appropriations for Fiscal Year Fnding December 31, 2016
June 23, 2616
Page 4 pf S
2015 as part of the Capital Improvements Program, The additional amount being requested is
related to the scope of services for the design of earth retaining walls at four locations in the area,
Section 14 appropriates funding in the tipper Metro Place TIF for county auditor deductions (as
explained in Section 1) and costs associated with the Post Road utility burial.
The additional $10,000 being requested for the Post Road utility burial is directly related to the
cost charged by AT &T to bury their overhead lines along Post Road This particular improvement
is part of the I270/US 33 interchange improvement, funding of which has been programmed in
previous year's CIPs
Section 18 appropriates funding in the Tartan West TIF for county auditor deductions (as
explained in Section 1), costs associated with contractual services requested by the City to review
the service payment revenue and collections generated within the TIF since its inception, and costs
associated with the Avery Road/Brand Road Roundabout,
Funding in the amount of $355,000 was programmed in 2016 as part of the 2016 — 2020 CIP for
the Avery Road/Brand Road roundabout These funds will go towards the design of that
roundabout and property acquisition,
Section 28 appropriates funding in the Frantz Road /Dublin Road TIF for costs associated with the
western roadway alignment This project was programmed in prior year's CIPs, The 2016 -- 2020
CIP contemplated $650,000 being spent in 2015 and 2016 ($500,000 in 2015 and $150,000 in
2016) far architecturai�engineering fees, However, no funds were expended in 2015,
Section 30 appropriates funding in the Bridge Street Fund for contractual payments, costs related
to the COTA Park &Ride, and debt service on the property acquisition needed for the Riverside
Drive/SR 161 roadway improvements
Funding in the amount of $1,536,965 is requested to fulFll the City`s obligations under the Bridge
Street District Cooperative Agreements signed in 2014 with the Dublin City School District and
Tones Career &Technical Center,
Funding in the amount of $585,000 is requested for the COTA Park &Ride project. Per Resolution
No 09 -16, approved February 22, 2016, the project was awarded to Jess Construction with a bid
of $578,578 The improvements that will be constructed as part of this project include 84 -space
Park &Ride lot and related impravements Funding far this improvement was included in prior
year's CIPs and was anticipated to be spent in 2015 but the construction did not occur until this
year,
The remaining request of $256,000 is necessary to transfer funds to pay for debt service an land
acquired for the Riverside Drive�SR 161 roadway improvements
Section 31 appropriates funding within the Urable TIF Fund for the construction of John Shields
Parkway (JSP), phase 1. JSP phase 1 was constructed in 2014 with payments to Complete General
Construction being made in 2014 and 2015, At the time, construction casts were charged to the
Bridge Street Fund, In 2016, an accounting adjustment was made to charge the expense against
Memo re. Ordinance 24 -16 - Amending the Annual Appropriations for Fiscal Year Ending December 31 2016
]une 23, 2016
Page S of S
the Urable TIF Fund which is the appropriate account given that the revenues generated within
that TIF are to be used to fund that roadway construction,
Section 33 appropriates funding within the Tuller TIF Fund for the construction of JSP, phase 2.
Per Resafution No. 08 -16, approved February 22, 2016, the project was awarded to Nickolas Savko
and Sans with a bid of $7,711,264.50. The budgeted amount for this project in the 2016 -2020
Capital Improvements Program was $7.3 million. The improvements that will be constructed as
part of JSP, phase 2 include 3,100 feet of new roadway; storm sewer; AEP duct bank
(reimbursable to the City); street lighting and electric; permeable pavers; brick walkway and cycle
track; demolition of temporary COTA Park &Ride, and trees and planting,
As part of the 2016 — 2020 CIP, Staff discussed issuing debt to fund this improvement. Until a
band package is prepared (anticipated to be in the 3r° or 4rh quarter of 2016), funding will be
advanced from the General Fund. The service payments generated from the Tuller Flats
development will ultimately be used to fund the debt service,
Sections 35 and 36 appropriates funding for transfer expense in the Sewer and Water Funds, In
2015, the City budgeted transfers of $400,000 in order to move $200,000 to the Water Fund and
$200,Q00 to the Sewer Fund from the Capital Improvements Fund in order to build reserves far
waterline and sewerline allocations. Subsequently, we became aware that until the funds are
expended (from the water and sewer funds), the reserved amount should remain within the
Capital Improvement Fund, As such, those funds were transferred back in 2016.
Section 37 appropriates funding in the Agency Fund in the total amount of $25,500 The Agency
Funds are used to account for the assets held for distribution by the Ciry as an agent far another
entity for which the Ciry has custodial responsibility. For this reason, the Agency Funds are
considered clearing accounts and do not provide measurement of operations, and they are not
required to be budgeted. However, the City prefers to monitor the accounts, and to the extent
possible, not show de>`rcit balances, Therefore, supplemental amounts are requested as shown in
the accompanying ordinance. Ali payments made from the accounts within the Agency Fund have
revenue to offset the expenses,
Recommendation
Staff recommends that Ciry Council approve Ordinance 24 -16, amending the Annual Appropriations
far the Fiscal Year Ending December 31, 2016, at second readingJpublic hearing on July 5, 2016.