HomeMy WebLinkAboutResolution 021-16RECORD OF RESOLUTIONS 21 -16 Resolution No. Passed A RESOLUTION ACCEPTING THE LOWEST AND BEST BID FOR THE CHURCHMAN ROAD — PHASE 2 PROJECT WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Revised Charter and Chapter 37 of the Dublin Code, for the Churchman Road — Phase 2 Project; and WHEREAS, Council has determined that the bid submitted by Trucco Construction Company, Inc. constitutes the lowest and best bid; and WHEREAS, Council has determined that there may be a legitimate need to declare the relocation of the utilities in connection with the above - referenced project as a "single source" procurement, for reason that the company owning the utilities in question has the exclusive rights to relocate such utilities. NOW THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, of its elected members concurring, that: Section I. The bid submitted by Trucco Construction Company, Inc. in the total amount of $1,975,629.50 is hereby accepted. Section 2. The City Manager is hereby authorized to enter into contracts with Trucco Construction Company, Inc. for performance and completion of the Churchman Road — Phase 2 pursuant to the Advertisement, Proposal and Contract Documents for said project on file in the office of the City Engineer. Section 3. This Resolution shall take effect upon passage in accordance with Section 4.04(a) of the Revised Charter. of / 2016. Y,(yS(tb ATTEST: Clerk of Council Office of the City Manager �` p 1 � 5200 Emerald Parkway � goblin, ON 43017 -1090 �1 ail U��l�n Phane: 614 - 4104400 a Fax, 614 - 410-4490 To: Members of Dublin City Council Frorrir Dana L. McDaniel, City Mana ` Dates Aprii 21, 20th Initiated Bye Paul A. Hammersmith, P,E,, Director of Engineering/City Engineer Michael S. Sweder, P,E,, Civil Engineer II Re. Resolution No, 21 -16 Churchman Road — Phase 7 - Bid acceptance Summary On April 71 2016, six (6) bids were received, publicly opened and read for the Churchman Road —Phase Z project The project involves the construction of a single lane modern roundabout at the intersection of Rings Road and Churchman Road and approximately 1,900 feet of 3 -lane boulevard roadway (Churchman Road }, Street lighting will be added at the roundabout and at the intersections of Churchman Road with Cadman Place and Montridge Lane, The project also includes the extension of a water main and shared•use path along the north side of Rings Road to Eiterman Road. This project completes the remainder of Churchman Road between Marmian Drive and Rings Road, When completed Churchman Road will total 3,600 feet of 3 -laved boulevard section with landscaped medianJ, Ultimately a roundabout is planned to be constructed at the intersection of Casgray Road and Churchman Road, That intersection improvement is currently reflected in years beyond 2020 in the 2016.2020 Capital Improvements Program, The Engineer's estimate is $2,200,000, The budgeted funds for construction of this project in the 2016 Capitai Improvement Program (CZP ) are $2 ,250,000 in ET 1119 To the extent passible, permissive tax funds wiil be used to fund the project as detailed in the Capitai Improvements Program, Trucco Construction Company, Inc, submitted the lowest and best bid of $1,975,62950, Staff has reviewed all bids and a summary of the bids is listed below, ` Bid as Read Bidder Bid as Read aver (+) or under ( -) Corrected Bid rucco Construction Company, ._�_______. �. Inc, $1,975,629,50 � - 10,2 ° /o I n�a Strawser Paving Company, Inc ; $2,019,524,99 - 8.2 °/o I n�a E George J Igel &Company, Inc� °/o $2,037,310,58 - 7.4 n�a �ouble Z Construction Company ! $2,112,879,24 �1.2% n/a � Columbus Asphait Paving, Inc $2,292,674,10 � 4.Z% n a Compiete General Construction $2,391,685J3 Comoanv � �7% � n�a � Res, 21 -16 - Churchman Road — Phase 2 Bid Acceptance April 21, 2Q16 Page 2 of 2 For Council's reference and review, a reduced set of project construction drawings has been placed in the Council Planning Room, Staff anticipates the construction to commence in May 2016, Rings Road will be closed to through traffic for construction of the roundabout an or after June 6, 2016 and will reaper no later than August if 2016. During this phase of the project, Rings Road traffic will be detoured to Shier-Rings Road via Cosgray Road and Avery Road for a ma�cimum of eight weeks, The scheduled completion date for the project is Qckober 28, 2016, Staff has thoroughly reviewed the bid from Trucca Construction Company, Inc, Previous experience with Trucca Construction Company, Inca has been favorable, including these projects Hirsh- �lolpertjDublin Road Culvert Improvement (in 2012), the Cosgray Road�Shier -Rings Road Roundabout (in 2012, and the S,R.161 Improvements and Industrial Parkway Relocation (in 2010). Recammendatian Staff recommends Council approval of Resolution 21 -16, accepting as lowest and best the bid of Trucca Construction Company, Inc, in the amount of $1,975, &29.50 and authorizing the City Manager to enter into a contract with Trucca Construction Company, Inc, for this project IL �ih % il wit -I_- Churchman Road Phase 1 (by developer) Construction in 2015 • Estimate: $1,110,000 .= Phase 2 • Construction in 2016 .y Phase 3 , a Construction not programmed l��