Loading...
HomeMy WebLinkAbout74-03 OrdinanceRECORD OF ORDINANCES Ordinance No .............7~-Q3..........................,......... Passed ................................................................, ....................... AN ORDINANCE TO ACCEPT THE LOWEST/BEST BID FOR THE RINGS ROAD/ATRIUM PARKWAY/ASHLAND CHEMICAL DRIVE INTERSECTION IMPROVEMENTS PROJECT AND DECLARING AN EMERGENCY WHEREAS, after advertising, receiving and opening bids on May 30, 2003 six (6) bids were received for the Rings Road/Atrium Parkway/Ashland Chemical Drive Intersection Improvements project; and WHEREAS, Council has determined that the lowest and best bid for said project is from, Complete General Construction Company in the amount of $588,323.00; and WHEREAS, Council has determined that there may be a legitimate need to declare the relocation of the utilities in connection with the above-referenced project as a "single source" procurement, for reason that the company owning the utilities in question has the exclusive rights to relocate such utilities; and WHEREAS, it is in the best interest of the City to execute this contract as soon as possible so that construction may commence immediately; and NOyV THEREFORE BE IT ORDAINED by the Council of the City of Dublin, Ohio, _~ of the elected members concurring: Section 1. That the bid from Complete General Construction Company in the amount of $588,323.00 be, and hereby is, accepted. Section 2. That the City Manager is hereby authorized and directed to execute a contract with Complete General Construction Company for completion of said project pursuant to the bid specifications and documents on file in the office of the City Engineer. Section 3. That this Ordinance be, and the same hereby is, declared to be an emergency measure for the preservation of the public peace, health or welfare of the residents of this City, and, therefore, this Ordinance shall take effect and be in force immediately upon its passage. Passed this /~ da of ~~ ~_ , 2003. l~ er ATTEST: ~~~-~~v~ Clerk of Council I hereby certify that copies of this Ordinance/Resolution were posted in the City of Dublin in accordance with Section 731.25 of the Ohio Revised Code. uty Clerk of Council, Dublin, Ohio Office of the City Mana er 5200 Emerald Parkway • Dubin, OH 43017 CITY OF DUBLIN phone: 614-410-4400 • Fax: 614-410-4490 Memo To: Members of Dublin City Council From: Jane S. Brautigam, City Manager Date: June 18, 2003 it ctor of En ineerin /Cit En inee~~~ Imtlated By: Paul A. Hammersmith, P.E., D e g g y g f~ Kenneth B. Richardson, P.E., Assistant Director ofEngineering -Design Re: Rings Road/Atrium Parkway/Ashland Chemical Access Drive Intersection Improvements Bid Acceptance Ordinance Ordinance No. 74-03 Summary: On May 30, 2003 six (6) bids were received, publicly opened and read for the Rings Road/Atrium Parkway/Ashland Chemical Access Drive Intersection Improvements project. A summary of the bids is shown on the attached bid tabulation. All bids have been reviewed by Engineering Division staff. The engineer's estimate for this project was $620,000. These improvements, as depicted on the attached exhibit, consist of constructing approximately 720 feet of new roadway to be named Ashland Chemical Drive, including a 28-foot by 7-foot precast concrete arch bridge, installing a traffic signal and providing landscape treatments at this newly created intersection. Complete General Construction Company of Columbus, Ohio, submitted the lowest and best bid of $588,323.00, which is $31,677.00 less than the Engineer's estimate. The project will be funded by an advance from the Capital Improvements Tax Fund that will be reimbursed in the future from service payments generated by the Rings/Frantz TIF and by a payment from Ashland Chemical in accordance with the agreement authorized by Ordinance No. 127-02. Complete General Construction Company has performed several projects in the past including Emerald Parkway, Phase 7 and recently the Martin Road storm sewer improvements. Staff has had mostly favorable experience with Complete General Construction Company, although their timely completion of projects has been a concern. Staff has met with representatives of Complete General Construction Company to discuss this concern. The representatives have demonstrated a true commitment to complete this project on time, both substantial completion and final completion. Recommendation: Staff recommends this ordinance accepting the bid of Complete General Construction Company be adopted by Council. Emergency action upon adoption is requested to allow the work to commence immediately and be mostly performed during the more favorable summer weather, and thus be substantially completed by the final project completion date of November 5, 2003. 0 a~ ~. ... T~T~ V1 W O A W H U W ti a W Q W W z W W A W a O L~ Q W H W U W ~ OW U ' 1n ~ V1 N O~ O ~ ~ LLB ~ ~ ~ ~D ~ N M ~' to 00 ~ M M d0 ~ 6R bl4 bl9 6R ff3 ~ _~-J Q W 0 U ra ~ ~ ~ ~" 0 ° v ~- ~ o ~ ... sa ~ V a ~ U ~ ~ ~ A> ~ a ° ~ V '~ ~ = ~ V ~, ^~ ~ - ~ ~ ~ ' ~ ° a~ ~ ~ ~' ~ ~ t j i a L7 c a ~, ~ U 7~., ~ 4 ~ A ~ C H U r .+ v~ ~ ti V ~, v e ~ ~^~a'Sa~ ra e:~ r „~ ~rf• ~a r` a" ~' ~' ~ 4 ~ ' ~. .. t s ~ ~ , .... ~ ,~ sn ~, ,y„~r -'; ~ ~ ~~ ~ ,,