Loading...
HomeMy WebLinkAboutResolution 084-15RECORD OF RESOLUTIONS Dayton Legal Blank, Inc., Form No. 30045 Resolution No. 84 -15 Passed A RESOLUTION ACCEPTING THE LOWEST AND BEST BID FOR THE GUARDRAIL IMPROVEMENTS - PHASE 1, RIVERSIDE DRIVE AND DUBLIN ROAD, PROJECT , 20 WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Revised Charter and Chapter 37 of the Dublin Code, for the Guardrail Improvements — Phase 1, Riverside Drive and Dublin Road Project; and WGIEREAS, Council has determined that the bid submitted by Lake Erie Construction constitutes the lowest and best bid; and WHEREAS, Council has determined that there may be a legitimate need to declare the relocation of the utilities in connection with the above - referenced project as a "single source" procurement, for reason that the company owning the utilities in question has the exclusive rights to relocate such utilities. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, ,7 of its elected members concurring, that: Section 1. The bid submitted by Lake Erie Construction in the total amount of $195,375.00 is hereby accepted. Section 2. The City Manager is hereby authorized to enter into contracts with Lake Erie Construction for performance and completion of the Guardrail Improvements — Phase 1, Riverside Drive and Dublin Road pursuant to the Advertisement, Proposal and Contract Documents for said project on file in the office of the City Engineer. Section 3. This Resolution shall take effect upon passage in accordance with Section 4.04(a) of the Revised Charter. Passed this day of �LE'��, 2015. ayor - Presiding Officer ATTEST: Clerk of Council J Office of the City Manager 1200 Emerald Parkway * Dublin, OH 43017-1090 tv of Dublin Phone: 614-410-4400 * Fax: 614-410-4490 Cit �-J it Members of Dublin City Council From: Dana L. McDaniel, City Maria Date: December 3, 2015 Initiated By: Paul A. Hammersmith, P.E., Director of Engineering/City Engine Barbara Cox, P.E., Engineering Manager Kenneth B. Richardson, P.E., P.S., Senior Civil Engineer Re-, Resolution No. 84-15 - Guardrail Improvements — Phase 1, Riverside Drive and Dublin Road - Bid Acceptance On Thursday, November 19, 2015, two (2) bids were received, publicly opened and read for the Guardrail Improvements — Phase 1, Riverside Drive and Dublin Road, project, which involves the replacement of existing steel guardrail with steel guardrail on Riverside Drive replacement of existing steel guardrail on Dublin Road (S.R. 745) with steel-backed timber guardrail. The Engineer's estimate is $210,000. This project was budgeted for $230,000 in the 2015 — 2019 Capi Improvement Program under AT1510, Annual Guardrail Replacement and Maintenance. Lake Erie Construction submitted the lowest and best bid of $195,375.00. Staff has reviewed all bids and a summary of the bids is listed below. I For Council's reference and review, a reduced set of project construction drawings has been placed in the Council Planning Room. A general location map is attached for your reference. Staff anticipates the construction to commence March 1, 2016. Riverside Drive and Dublin Road will remain open to traffic for the duration of the construction. One lane may be restricted during daytim - hours. The scheduled completion date for the project is May 13, 2016. 1 Staff has thoroughly reviewed the bid from Lake Erie Construction. Lake Erie Construction has been a subcontractor on several projects in Dublin including Emerald Parkway, Phase 8, and the recently constructed pedestrian bridges for the shared-use paths on Muirfield Drive north of Brand Road. Staff veed with Lake Erie Construction that they understood the speed method of installation for the guardrails as we have not contracted directly with them in the past. I rzWe Staff recommends Council approval of Resolution No. 84-15, accepting as lowest and best the bid of Lake Erie Construction in the amount of $$195,375.00 and authorizing the City Manager to enter into a contract with Lake Erie Construction for this project. I Bid as Bidder Bid as Read over or under Corrected Bid Enaineer's Estimate Lake Erie Construction $195f375.00 -7.0% Paul Peterson Company__. 71 04.95 -5.9% For Council's reference and review, a reduced set of project construction drawings has been placed in the Council Planning Room. A general location map is attached for your reference. Staff anticipates the construction to commence March 1, 2016. Riverside Drive and Dublin Road will remain open to traffic for the duration of the construction. One lane may be restricted during daytim - hours. The scheduled completion date for the project is May 13, 2016. 1 Staff has thoroughly reviewed the bid from Lake Erie Construction. Lake Erie Construction has been a subcontractor on several projects in Dublin including Emerald Parkway, Phase 8, and the recently constructed pedestrian bridges for the shared-use paths on Muirfield Drive north of Brand Road. Staff veed with Lake Erie Construction that they understood the speed method of installation for the guardrails as we have not contracted directly with them in the past. I rzWe Staff recommends Council approval of Resolution No. 84-15, accepting as lowest and best the bid of Lake Erie Construction in the amount of $$195,375.00 and authorizing the City Manager to enter into a contract with Lake Erie Construction for this project. Guardrail Improvements -Phase I 11YOCOublin Location Map