Loading...
HomeMy WebLinkAboutResolution 080-15RECORD OF RESOLUTIONS Dayton Legal Blank, Inc., Form No. 30045 Resolution No. 80-15 Passed A RESOLUTION ACCEPTING THE LOWEST AND BEST BID FOR PHASE 2 OF THE ROOF REPLACEMENT PROJECT AT THE DUBLIN COMMUNITY RECREATION CENTER ,20 WHEREAS, formal advertising and competitive bidding procedures have been conducted pursuant to Section 8.04 of the Revised Charter for replacement of the sloped, shingle roof at the Dublin Community Recreation Center; and WHEREAS, Council has determined that the bid submitted by Windsor Construction Services in the amount of $767,825 constitutes the lowest and best bid for the construction work. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, State of Ohio, r-7 of the elected members concurring, that: Section 1. The bid submitted by Windsor Construction in the amount of $767,825 is hereby accepted for the replacement of the shingle roof at the Dublin Community Recreation Center. Section 2. The City Manager is hereby authorized to enter into a contract with Windsor Construction for said project as specified within the bid proposal and the City's bid documents. Section 3. This Resolution shall take effect immediately upon passage in accordance with Section 4.04(a) of the Revised Charter. Passed this day of ✓y0 C'�I�.�e!/, 2015 (:: qa2yor — Presiding Officer Attest: Clerk of Council Office of the City Manager 1200 Emerald Parkway # Dublin, OH 43017-1090 City of Dublin Phone: 614-410-4400 614-410-4490 To: Members of Dublin City Council From: Dana L. McDaniel, City Mana9ef,�111_1111 Initiated By: Megan D. O"Callaghan, Director of Public Works Brian K. Ashford, Facilities Manager Res. Resolution 80-15 - Accepting the Lowest and Best Bid for Phase 2 of the Roof Replacement Project at the Dublin Community Recreation Center On November 4, 2015, six bids were opened for the replacement of the sloped, shingle roof at the Dublin Community Recreation Center (DCRC). The first phase of the project was completed this Spring and involved the replacement of the flat roof membrane on approximately 45 percent of the total roof area. The Phase 2 shingled roof replacement represents the remaining 55 percent of the total roof surface along with the skylights and all of the gutters. Windsor's total bid, including an alternate that will install heat tape in the gutters over the primary entrances to prevent ice damming, is $767,825. The budget for this project is $850,000. 17: Staff recommends approval of Resolution 80-15., accepting as lowest and best the bid submitted by Windsor Construction Services in the amount of $767,825 for Phase 2 of the Roof Replacement Project at the Dublin Community Recreation Center and authorizing the City Manager to enter into a contract with Windsor Construction Services. Bid Results Partial Roof Replacement - Phase 2 Dublin Recreation Center - REBID Bidder Base Bid Alternate No. 1 Over /Under % Base Bid A -Star 815 450.00 10 100.00 6.007 Windsor Construction Services 732 925.00 34 900.00 -5.00% Wolfrum Roofing & Exteriors LLC. 843 000.00 66 000.00 10.00% K & W Roofing, Inc. 1,033,685.00 75 950.00 35.00% Smith Roofing 1,175,000.00 38 000.00 53.00% B.K. Contracting 836 000.00 69 000.00 9.00% Engineers Estimate $768,000.00 Budget Amount $850,000.00 230 Bradenton Avenue schar architects Dublin, Ohio 43017 p:614.798.2096 f: 614.798.2097 C1C. www.schorrarchitects.com November 6, 2015 Mr. Tim Elmer City of Dublin 6555 Shier Rings Rd. Dublin, Ohio 43016 -8716 Re: Partial Roof Replacement Phase 2 Dublin Recreation Center Dear Tim: Bids were received on November 4, 2015 for the above referenced project. The apparent low bidder was Windsor Construction Services with a Base Bid of $732,925.00 and an Alternate No. 1 Bid of $34,900.00. Windsor Construction Services was the contractor for the Partial Roof Replacement Phase 1 at the Dublin Recreation Center. You and I met with them to review the scope of the project and they are comfortable with their bid. It is therefore our recommendation a contract be awarded to Windsor Construction Services for the Base Bid and Alternate No. 1 in the amount of $767.825.00. We would recommend that $70,000.00 be set aside for construction contingencies. Respectfully Submitted, Schorr Architects, Inc. Tony �charr, AIA TS /sf