Loading...
HomeMy WebLinkAboutResolution 076-15RECORD OF RESOLUTIONS Dayton Legal Blank, Inc., Form No. 30045 3. 76—IS Passed 20 A RESOLUTION ACCEPTING THE BEST BID FOR THE DARREE FIELDS PUMP STATION UPGRADES AND FOUR - INCH FORCE MAIN AND AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT FOR THE PROJECT WHEREAS, formal advertising and competitive bidding procedures have been conducted, pursuant to Section 8.04 of the Revised Charter, for the Darree Fields Pump Station Upgrades and Four -Inch Force Main project; and WHEREAS, Council has determined that the base bid in the amount of $106,665.00 submitted by BK Layer LCC is the lowest and best bid; and WHEREAS, the Darree Fields Pump Station Upgrades and Four -Inch Force Main project was programmed in the approved 2015 Capital Improvement Program (CIP); and WHEREAS, funding is available in the Capital Projects Funds. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Dublin, State of Ohio,_ of the elected members concurring, that: Section 1. The base bid in the amount of $106,665.00 submitted by BK Layer LLC is hereby accepted. Section 2. The City Manager is hereby authorized to enter into a contract for said project as specified within the bid proposal and the City's bid documents on file in the Department of Parks and Recreation. Section 3. This Resolution shall take effect upon passage in accordance with Section 4.04(a) of the Revised Charter. Passed this I day of , 2015 yor — Presiding Officer Attest: Clerk of Council "rev, Members of Dublin City Council * ws From: Dana L. McDaniel, City Mana Date: November 12, 2015 C-nitiated By: Matt Earman, Director of Parks & RecreatioF Re: Resolution 76-15 - Darree Fields Pump Station Upgrades and Four-Inch Force Main Project On Wednesday, October 14, 2015, bids were opened for the Darree Fields Pump Station Upgrades and Four-Inch Force Main Project. Six (6) bids were received for this project. The funds for this project are included in the 2015 Parks CIP Budget in the amount of $205,000.00. The project was estimated at $226,350.00. This project consists of all the materials and labor necessary for the replacement of an existing sanitary sewer lift station and the installation of 1,200 feet of new four-inch sanitary force main. The City's consultant, EMH&T, contacted the references for BK Layer, the low bidder. One reference came back extremely positive and the other two did not provide enough feedback to demonstrate the contractor"s suitability for this project. Staff, together with EMH&T, conducted an interview with BK Layer and determined that they have a sound understanding of the work necessary to complete this project. I 71 Base Bid Precision Pipeline $185,77711,00 Downing Construction Company $154f 500.00 BK Layer, LL C $106,665.00 Precise Boring of Ohio $127,213.00 Winelco Inc. $178,000.00 Danbert, Inc. $160,000.00 The funds for this project are included in the 2015 Parks CIP Budget in the amount of $205,000.00. The project was estimated at $226,350.00. This project consists of all the materials and labor necessary for the replacement of an existing sanitary sewer lift station and the installation of 1,200 feet of new four-inch sanitary force main. The City's consultant, EMH&T, contacted the references for BK Layer, the low bidder. One reference came back extremely positive and the other two did not provide enough feedback to demonstrate the contractor"s suitability for this project. Staff, together with EMH&T, conducted an interview with BK Layer and determined that they have a sound understanding of the work necessary to complete this project. I 71 DARREE FIELDS PUMP STATION UPGRADES &4-INCH FORCE MAIN SITE LOCATION MAP