AN ORDINANCE AUTHORIZING THE CITY MANAGER
TO ENTER INTO A CONDUIT USE AGREEMENT
WITH AMPERION, INC.
WHEREAS, the City of Dublin has demonstrated great innovation in the area of
telecommunications and right-of--way management; and
WHEREAS, Amperion, Inc. desires to beta test new technology in the City of Dublin
that may ultimately benefit Dublin businesses and residents; and
WHEREAS, the City of Dublin desires to contribute to Amperion's beta test by
providing temporary access to certain portions of City-owned conduit and to use
equipment provided by Amperion; and
WHEREAS, by providing the access and use the City of Dublin may contribute to the
advancement of technology to obtain "the last mile" while gaining first-hand
understanding of this technology.
NOW, THEREFORE, BE IT ORDAINED by the Council of the City of Dublin, State
of Ohio, r~ of the elected members concurring that:
Section 1.
1. The City Manager is authorized to enter into a conduit use agreement with Amperion,
Inc.
2. The General Right of Way Permit requirement is hereby waived during the beta
testing period.
3. The City Manager is authorized to expand the beta test area using DUBLINK conduit
on a temporary basis as needed.
4. The City Manager will report to Council on a periodic basis the progress of the beta
test.
5. Amperion is authorized to install the necessary equipment in order that City staff can
participate in the beta test.
Section 2. This Ordinance shall take effect and be in force on the earliest date permitted
by law.
Passed this ~ day of , 2002
- - ~'~
yor -presiding Officer
ATTEST:
G~~ ~ L~ Co.~~C,~
Clerk of Council
I hereby certify that copies of this
Ordinance/Resolution were posted in the
City of Dublin in accordance with Section
731.25 of the Ohio Revised Code.
~~~
Xit, 'lerk of Council, Dublin, Ohio
CITY OF DUBLIN
Department of Service
6555 Shier-Rings Road, Dublin, Ohio 43016-8716
Phone: 614-410-4750 Fax: 614-761-6512
Memo
To: All Members Dublin City Council
From: Marsha Grigsby, Interim City Manager/Director of Finance
Initiated by: Dana L. McDaniel, Assistant City Manager/Director of Service
Date: July 18, 2002
Re: Amperion Conduit Capacity Use and Service Agreement
Several months ago, Amperion contacted staff regarding the desire to conduct a "beta" test on
potential new technology. This technology, if successful, could bring fiber optic-like bandwidth
to consumers over existing electric service lines. Amperion and its new technology are serving as
a catalyst to bring together multiple players to test this new possibility to include the City of
Dublin.
Amperion requests access to certain City of Dublin conduit within DUBLINK through which to
pull fiberoptics. This fiber will be temporary and enable them to conduct their testing. The testing
sites will be the American Electric Power (AEP) substation at Emerald Parkway and Shier Rings
Road and the City's 5800 Building. Amperion will provide and setup computer hardware in the
5800 Building to be used by City employees. They will monitor the effectiveness of this
technology. Amperion is targeting this area for its initial beta test and may expand the beta test in
this area to include other government facilities, schools, businesses and residents.
The City will benefit by gaining the temporary use of additional computers; additional access and
capacity to Internet and Intranet services; first hand knowledge of this new technology, its use and
potential capabilities.
The following are attached:
1. Report from Amperion.
2. Ordinance 101-02, Authorizing the City Manager to enter into a Conduit Use Agreement
with Amperion, Inc.
3. Conduit Use Agreement
Staff recommends approval of Ordinance 1 Ol -02.
Please address any questions to Dana McDaniel at work 410-4751 or mobile 206-3311.
Thank you.
DLM/tb
Amperion PLC Beta Test Overview
Amperion is the leading developer of medium voltage (MV) power line communications (PLC)
technology. The company was formed in June 2001 by American Electric Power, Cisco and
Redleaf Group and is based in Chelmsford, Massachusetts, with a regional office in Columbus.
The Amperion vision is that everyone who has electricity can also have broadband access.
Amperion's mission is to enable broadband communication over medium voltage (MV) electric
distribution lines. To this end, the company is designing, developing and marketing equipment
and supporting software and services that enables multi-Mbps data transmission over electric
utilities' MV electrical infrastructure, and includes the final linkage to the end use application.
The Dublin test will be among the first of its kind in the world, intending to prove that the
Amperion technology successfully delivers multiple Mbps of bandwidth to customers over the
MV electric infrastructure. It will also prove that applicable FCC Part 15 regulations can be
met, core utility applications can be supported and that the economic potential justifies further
testing.
Amperion has formed several partnerships to perform this technology trial as efficiently as
possible. World-class partner companies include an Internet service provider, network
operator, aDublin-based systems integrator, and American Electric Power. Testing will begin
in July and is anticipated to last approximately 120 days.
The city of Dublin was selected as the test site because of the proximity of trial customers and
potential future customers to the Dublink fiber system and Dublin's reputation for being a city
that deploys cutting-edge technology.
A DS3 circuit will be provided from a POP in central Ohio to a point (manhole #54) in the
Dublink system, where new fiber will be spliced and pulled approximately 1300' through the
city's conduit. This use of the city's conduit will be temporary and used only for the duration
of this project. Amperion will then trench 177' of new fiber to a point outside the AEP Service
Center, where a broadband signal will be injected onto the MV power lines and transmitted to a
demo site inside the AEP building. At that point, there will be multiple computers displaying a
number of different applications such as high-speed Internet access, streaming video, and utility
applications using that broadband signal.
Phase 2 of this project, to be completed in August, will then transmit the broadband signal to
the city's building at 5800 Shier Rings Road and demonstrate similar applications at that site.
This phase will demonstrate another aspect of Amperion's technology, that the signal can be
transmitted on overhead power lines. The city will have use of these computers, applications
and the Internet access for the duration of the trial.
Amperion and its partners look forward to working with Dublin beyond the completion of this
trial in order to potentially deploy a commercial product to customers in the city in 2003,
providing them with an alternative method of receiving broadband services in their homes or
businesses. This would bring economic and other benefits to the city and its citizens, and
further enhance Dublin's reputation as being a progressive, leading-edge city.
Dublin Beta Trial Overview N
Xfmr City of Dublin
236: Buildin wAP Emerald
500' Parkway
351' ~ F~traction
Pt. (Pole) 390' ~
Shier Rings
Road
Switch
yypp Cabine
AEP Service {~ Extrac n t.
Center , (Trans
t rm r}
t
t
t
715'; DU BLINK
,
Conduit
Injection Pt. ~
AI
(Transfarmer) ~ cabine
Amperion
Cabinet 12'
177' 14
(Dublink pt
#107)
AEP Fiber
trenched to .
Fiber in DUBLINK
Substation site conduit
New fiber deployed
Existing DUBLINK Conduit
- - - - - Underground AEP Wires
Overhead AEP Wires
Amperion Proprietary & Confidential
~ Do Not Disseminate
Innovation
Drive
1209'
Fiber splice point
(Dublink pt.#5-Ij ~~
,~ .